ANIKA CLASSIC

UPRERARegistered

ANIKA CLASSIC is a RERA-registered commercial project by ELLY REALCON PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ115895). Registered with a completion deadline of 30 Jun 2024. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ115895
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start15 Apr 2019
Project duration63 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address1/3571, Ram Nagar Extention, Shahdara, Delhi - 110032
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    745/HOTEL/GMP/ZONE-1/16-17

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered6 Jun 2019
Original completion31 Dec 2023
Revised completion30 Jun 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹44,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 1 · 8 (from plan)
ConfigurationUnitsCarpet area
SHOP—171-376
STUDIO—225-702
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · SHOP, STUDIO8—171-702
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
DHAMA ASSOCIATES
License CA/1995/18140
34, 1ST FLOOR, NAVYUG MARKET, GHAZIABAD
Engineer
JITENDER KUMAR
D-38, ACHARYA NIKETAN, MAYUR VIHAR, PHASE-1, NEW DELHI- 110091
Contractor
SAWARIA SETH INFRATECH PRIVATE LIMITED
3/538, VASUNDHARA, GHAZIABAD
Sr.Development work declared to RERA
1Demarcation of Plots
COMPLETED
2Boundary Wall
PARTIALLY COMPLETED
3Road Work
ALREADY DONE
4Footpaths
TO BE DEVELOPED AT LATER STAGE
5Water Supply Including Drinking Water Facilities
TEMPORARY ARRANGEMENT DONE, PERMANENT ARRANGEMENT WILL BE DONE DURING PROJECT COMPLETION
6Sewer System
UNDER PROGRESS
7Drain
UNDER PROGRESS
8Parks
UNDER PROGRESS
9Tree Planting
PARTIALLY COMPLETED
10Design For Electric Supply Including Street Lighting
UNDER PROGRESS
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
GOVERNMENT STP FUNCTIONAL AND CONNECTION TO BE DONE AFTER COMPLETION OF PROJECT
13Solid Waste Management And Disposal System
WILL BE TAKEN CARE AS PER NORMS AT PROJECT COMPLETION STAGE
14Water Conservation System
WILL BE TAKEN CARE AS PER NORMS AT PROJECT COMPLETION STAGE
15Energy Management System Including Use of Renewable Energy
WILL BE TAKEN CARE AS PER NORMS AT PROJECT COMPLETION STAGE
16Fire Protection And Fire Safety System
AS PER NORMS
17Social Infrastructure And Other Public Amenities Including Public Health Services
AS PER NORMS
18Emergency Evacuation Services
AS PER NORMS
19Other Miscellaneous Work
AS PER NORMS
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 2 Apr 2024.

Sanctioned by Ghaziabad Development Authority · 3,339 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
745/HOTEL/GMP/ZONE-1/16-173 Apr 20192 Apr 20242 Apr 202731 Dec 2023
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2024.

#Granted fromExtended uptoNote
131 Dec 202330 Jun 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1010594.5Khasra
9991075Khasra
9991075Khasra
1010594.5Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 1035
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1034
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6646
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6847
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New16 May 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Apr 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Apr 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New1 Jun 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New1 Jun 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New1 Jun 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New1 Jun 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New23 May 2019 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameELLY REALCON PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM81315
PANAAECE3565F
CIN / TANMRTE01509E
Name of chairmanShyama Devi
Registered address1/3571, Ram Nagar Extention, Shahdara, Delhi - 110032
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ELLY REALCON PRIVATE LIMITED ESCROW ACCOUNTBankIDBI BANKBranchRAJ NAGAR GHAZIABADA/C no.IFSCIBKL0000066
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about ANIKA CLASSIC

Is ANIKA CLASSIC RERA registered?

Yes. ANIKA CLASSIC is registered with UPRERA under registration number UPRERAPRJ115895, registered on 6 Jun 2019. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ANIKA CLASSIC?

The completion date filed with UPRERA is 30 Jun 2024. No completion certificate is on record yet.

Who is the builder of ANIKA CLASSIC?

ELLY REALCON PRIVATE LIMITED is the promoter entity that filed ANIKA CLASSIC with UPRERA (promoter RERA ID UPRERAPRM81315). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does ANIKA CLASSIC show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted ANIKA CLASSIC more time to complete?

UPRERA's record carries 1 completion extension for ANIKA CLASSIC, the latest running to 30 Jun 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does ANIKA CLASSIC have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ANIKA CLASSIC located?

ANIKA CLASSIC is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in ANIKA CLASSIC?

The unit plan filed with UPRERA lists SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in ANIKA CLASSIC?

The approved unit plan filed with UPRERA runs from 171 to 702 m² of carpet area (about 1,838 to 7,552 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗