Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) is a RERA-registered residential project by Bareilly Development Authority in Bareilly (RERA ID UPRERAPRJ135764). Registered with a completion deadline of 30 Jun 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ135764 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Bareily Development Authority |
| Proposed start | 1 Feb 2020 |
| Project duration | 41 months |
| Address | Bareilly, Bareilly |
| Tehsil | Bareilly |
| Applicant type | Competent authority |
| Applicant address | Vikas Jyoti Complex, Pyiyadarshini Nagar, Bareilly - 243122 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
B.D.A/R.G.N.Sec(9)/002/2020
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Feb 2020 |
| Original completion | 1 Jan 2023 |
| Revised completion | 30 Jun 2023 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 29 Dec 2023 |
| Registration fee | ₹2,25,000 |
| Sanctioning authority | Bareily Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Dry Bricks |
| 2 | Boundary Wall No |
| 3 | Road Work G.S.B. 25cm and wmm 15cm and Bituminous premixing 25mm thick road with seal coat |
| 4 | Footpaths No |
| 5 | Water Supply Including Drinking Water Facilities Water Supply through Over Head Tank by PVC Pipe line 6kg/cm.sqm |
| 6 | Sewer System NP2 RCC Hume Pipe |
| 7 | Drain U-Shape, Brick Masonry 1;6 cement and course sand and plaster 1;4 cement and course sand |
| 8 | Parks Boundry wall with Brick work in 1;6 cement and course sand |
| 9 | Tree Planting Various Plantation |
| 10 | Design For Electric Supply Including Street Lighting Electric Supply on P.C.C. and S.T. Pole as per UPPCL norms and Street Light LED |
| 11 | Community Buildings No |
| 12 | Treatment and Disposal System of Sewage and Sullage water Proposed STP for hole scheme |
| 13 | Solid Waste Management And Disposal System No |
| 14 | Water Conservation System No |
| 15 | Energy Management System Including Use of Renewable Energy No |
| 16 | Fire Protection And Fire Safety System No |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services No |
| 18 | Emergency Evacuation Services No |
| 19 | Other Miscellaneous Work No |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 15 Jan 2025.
Sanctioned by Bareily Development Authority · 43,923 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| B.D.A/R.G.N.Sec(9)/002/2020 | 16 Jan 2020 | 15 Jan 2025 | 15 Jan 2028 | 31 Dec 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2023.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 1 Jan 2023 | 30 Jun 2023 | — |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 108, 109, 98, 110(P), 111(P), 112, 115(P), 113(P), 92(P),91(P) | 43923 | Khasra |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 Feb 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 24 Jan 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 24 Jan 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 24 Jan 2020 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 24 Jan 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 10 Feb 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 24 Jan 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 24 Jan 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 24 Jan 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 Feb 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 25 Jan 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Jan 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 25 Jan 2020 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Bareilly Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM18199 |
| PAN | AAALB0169K |
| CIN / TAN | LKNB05448C |
| Registered address | Vikas Jyoti Complex, Pyiyadarshini Nagar, Bareilly - 243122 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Bareilly
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | BDA Bareilly Ram Ganga Nagar Scheme Sector Part-IIBankPunjab National BankBranchRajendra Nagar BareillyA/C no.IFSCPUNB0187000 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9)
Is Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) RERA registered?
Yes. Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) is registered with UPRERA under registration number UPRERAPRJ135764, registered on 28 Feb 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) been completed?
UPRERA still lists Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) as Registered, so it is not shown as completed here. A completion certificate dated 29 Dec 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9)?
Bareilly Development Authority is the promoter entity that filed Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) with UPRERA (promoter RERA ID UPRERAPRM18199). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) more time to complete?
UPRERA's record carries 1 completion extension for Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9), the latest running to 30 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) located?
Ramganga Nagar Scheme Antriksh Khand Part-2 (Sector-9) is registered in Bareilly, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗