SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA is a RERA-registered residential project by Bareilly Development Authority in Bareilly (RERA ID UPRERAPRJ918501). Registered with a completion deadline of 18 Apr 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ918501 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Bareily Development Authority |
| Proposed start | 1 Jul 2022 |
| Project duration | 58 months |
| Address | Bareilly, Bareilly |
| Tehsil | Bareilly |
| Applicant type | Competent authority |
| Applicant address | Vikas Jyoti Complex, Pyiyadarshini Nagar, Bareilly - 243122 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
BDA/RGN SECTOR-8/009
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 19 Jul 2022 |
| Original completion | 18 Apr 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹12,67,000 |
| Sanctioning authority | Bareily Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots PLOT MARKING |
| 2 | Boundary Wall NO |
| 3 | Road Work GSB, WMM AND BITUMINOUS ROAD (WIDTH 7.50M, 9.00M, 12.00M AND 24.00M) |
| 4 | Footpaths NO |
| 5 | Water Supply Including Drinking Water Facilities PVC PIPE AND OHT |
| 6 | Sewer System RCC HUME PIPE WITH DIA 250MM, 300mm with RCC man hole and Chaimber with Brick Work. |
| 7 | Drain RCC DRAIN |
| 8 | Parks BRICK WORK AND GRILL |
| 9 | Tree Planting NO |
| 10 | Design For Electric Supply Including Street Lighting STREET LIGHT AND LT LINE |
| 11 | Community Buildings NO |
| 12 | Treatment and Disposal System of Sewage and Sullage water NO |
| 13 | Solid Waste Management And Disposal System NO |
| 14 | Water Conservation System NO |
| 15 | Energy Management System Including Use of Renewable Energy NO |
| 16 | Fire Protection And Fire Safety System NO |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NO |
| 18 | Emergency Evacuation Services NO |
| 19 | Other Miscellaneous Work NO |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 18 Apr 2027. 1 of them carries a revalidation.
Sanctioned by Bareily Development Authority · 2,52,340 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| BDA/RGNSECTOR-08/009 | 19 Apr 2022 | 18 Apr 2027 | 18 Apr 2030 | — | — | |
| BDA/RGN SECTOR-8/009 | 19 Apr 2022 | 18 Apr 2027 | 18 Apr 2030 | — | 19 Apr 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 116, 117, 121, 122, 124, 125, 126, 127M, 128 TO 136M, 140,146,147M, 151 TO 154, 156 TO 168M , 170 TO 172, 174, 175, 213 TO 217, 218M, 219, 227, 234M, 244, 246, 248M, 250, 351 | 252340.00 | Khasra |
| 116, 117, 121, 122, 124, 125, 126, 127M, 128 to 135, 136M, 140, 146,147M, 151 to 154, 156 to 167, 168m, 170 to 172, 174, 175, 213 to 217, 218m, 219,227, 234m, 244, 246, 248m, 250, 351, 48,49,61 to 66 | 252486.70 | Khasra |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 23 May 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 23 May 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 23 May 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 23 May 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 28 Jun 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 23 May 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 23 May 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 23 May 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Jun 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 13 Jul 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 18 Jul 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 18 Jul 2022 ↗ |
Quarterly progress reports
16 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
16 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q2 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 98.61% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 99.27% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 99.3% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Bareilly Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM18199 |
| PAN | AAALB0169K |
| CIN / TAN | LKNB05448C |
| Registered address | Vikas Jyoti Complex, Pyiyadarshini Nagar, Bareilly - 243122 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Bareilly
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | BDA RGN SEC 8 SHIPRA ENCLAVE COLLECTION ACCOUNTBankAIXS BANKBranchCIVIL LINES BAREILLYBranch addressCIVIL LINE BAREILLYBranch districtBareilly, Uttar PradeshA/C no.IFSCUTIB0000205 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | BDA RGN SEC 8 SHIPRA ENCLAVE SEPARATE ACCOUNTBankAXIS BANKBranchCIVIL LINES BAREILLYBranch addressCIVIL LINES BAREILLYBranch districtBareilly, Uttar PradeshA/C no.IFSCUTIB0000205 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | BDA RGN SEC 8 SHIPRA ENCLAVE TRANACTION ACCOUNTBankAXIS BANKBranchCIVIL LINES BAREILLYBranch addressCIVIL LINES BAREILLYBranch districtBareilly, Uttar PradeshA/C no.IFSCUTIB0000205 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA
Is SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA RERA registered?
Yes. SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA is registered with UPRERA under registration number UPRERAPRJ918501, registered on 19 Jul 2022. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA?
The completion date filed with UPRERA is 18 Apr 2027. No completion certificate is on record yet.
Who is the builder of SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA?
Bareilly Development Authority is the promoter entity that filed SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA with UPRERA (promoter RERA ID UPRERAPRM18199). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA located?
SHIPRA ENCLAVE SECTOR 8 RAMGANGA NAGAR AWASIYA YOJNA is registered in Bareilly, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗