Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Lucknow (RERA ID UPRERAPRJ787484). Registered with a completion deadline of 4 Jul 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ787484 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 5 Dec 2020 |
| Project duration | 31 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1208/AP-4 Date- 09.06.2020
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 29 Jul 2020 |
| Original completion | 4 Jul 2023 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 3 Aug 2023 |
| Registration fee | ₹2,50,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Approved Layout Plan. The Plot shall be demarcated by means of T. |
| 2 | Boundary Wall Parishad shall not provide any Boundary wall. To be built by the Allottee concern inline with the Bhawan Nirman upvidhi. |
| 3 | Road Work As per Specifications of UP Awas Evam Vikas Parishad (Chief Engineer Office order No 685/M-4/2017 dt 19.03.2017 and others ). Work shall be carried out as per Uttar Pradesh Public work departments shedule of rates (Specifications ) SOR 2019. |
| 4 | Footpaths As per Specifications of UP Awas Evam Vikas Parishad and inline with approved map. (Chief Engineer Office order No 685/M-4/2017 dt 19.03.2017 and others ). Work shall be carried out as per Uttar Pradesh Public work departments shedule of rates (Specifications ) SOR 2019. |
| 5 | Water Supply Including Drinking Water Facilities Provided /shall be provided as per norms and specification of UP JAL NIGAM . The Network consist of Trunk water line laid in Trunk Road Cross Section with OHT in sector to cater to the plots . |
| 6 | Sewer System Provided . The under ground sewer network with manholes and chambers shall be provided in accordance with UP JAL Nigam Specification and Chief Engineer Order No 912/M-1/94 dt 20-10-2005. |
| 7 | Drain Open Channelized water drainage network is to be Provided . Drains shall be of type C-1, C-2, C-3 etc . The construction shall be as per Uttar Pradesh Public work departments shedule of rates (Specifications ) SOR 2019. |
| 8 | Parks Provided as shown in approved layout . The Construction and Development shall be inline with office order No - 878/ISO dt 05.04.2007. |
| 9 | Tree Planting By side of the Roads and in Parks As per Approved Layout. |
| 10 | Design For Electric Supply Including Street Lighting Shall be done in house (by UPAVP) and shall be handed over to UPPCL for issuing individual connections . |
| 11 | Community Buildings As per Approved Layout. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Planned sewer network for Awadh Vihar Yojna already in place. These plot shall be connected to this existing network. |
| 13 | Solid Waste Management And Disposal System Door to Door collection and segregation system exists in the township. The solid waste is disposed Inline with rule and regulation . |
| 14 | Water Conservation System Rain water harvesting in individual plots inline with the building bylaws to be done by concerning allottees. |
| 15 | Energy Management System Including Use of Renewable Energy Solar Panels in individual plots inline with the building bylaws to be done by concerning allottees. |
| 16 | Fire Protection And Fire Safety System Fire hydrant Provided inline with fire norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Available in Awadh Vihar Yojna and near by areas |
| 18 | Emergency Evacuation Services Already existing Inline with the govt. guideline. |
| 19 | Other Miscellaneous Work In accordance with the registration booklet (to be published after rera registration) |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 8 Jun 2025.
Sanctioned by U.P. Awas Evam Vikas Parishad · 49,100 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1208/AP-4 Date- 09.06.2020 | 9 Jun 2020 | 8 Jun 2025 | 8 Jun 2028 | 4 Jul 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Sector-7C | 180200 | Plot |
| Khatauni extract · 2007-2008 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 24 Jun 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 3 Jul 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 3 Jul 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 24 Jun 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 24 Jun 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 4 Jul 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 14 Jul 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 15 Jul 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 15 Jul 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 15 Jul 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 14 Jul 2020 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | UP AWAS EVAM VIKAS PARISHAD AVADH VIHAR LUCKNOWBankHDFC BANKBranchGOMTI NAGAR LUCKNOWA/C no.IFSCHDFC0003802 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow
Is Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow RERA registered?
Yes. Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow is registered with UPRERA under registration number UPRERAPRJ787484, registered on 29 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow been completed?
UPRERA still lists Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow as Registered, so it is not shown as completed here. A completion certificate dated 3 Aug 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow located?
Sector-7C, Plotted Development, Awadh Vihar Yojna Lucknow is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗