RPS-01 SECTOR-2

UPRERARegistered

RPS-01 SECTOR-2 is a RERA-registered residential project by GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY in Gautam Budh Nagar (RERA ID UPRERAPRJ10056). Registered with a completion deadline of 31 Mar 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ10056
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start15 Mar 2010
Original start18 Dec 2009
Project duration97 months
AddressDadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompetent authority
Applicant addressPLOT NO-01, KNOWLEDGE PARK-04, GREATER NOIDA, G.B. NAGAR UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    NIYOJAN/09/DS-132/34507-34509

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion31 Mar 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary27 Jun 2023
Registration fee₹47,60,000
Sanctioning authorityGreater Noida Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SUKHBIR SINGH W
License CA/97/21920
PLOT NO-01, KP-IV, GREATER NOIDA
Engineer
BP SINGH
PLOT NO-01, KP-IV, GREATER NOIDA
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation Complete
2Boundary Wall
NA
3Road Work
Bituminus Road- 9.0m wide road 12.0m wide road & 18.0m wide road
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
Over head tank, upvc & C.I pipe line laid for sapply of water
6Sewer System
R C C pipeline for flow sewerage, disposed in GNIDA trunk sewerage line
7Drain
Brick work drain & Plaster work
8Parks
Total 24 parks are to be devloped with tree shrub plantation & grassing for lown area with boundary wall foothpath and huts& irrigation system
9Tree Planting
Other than Parks it is to be done in blance internal road & blance internal green belts along with 100.m wide mp green belt
10Design For Electric Supply Including Street Lighting
energy based electric sub station 11/0.443 kv & 33 kv including LED street light
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
Sewer disposed in GNIDA trunk sewerage line
13Solid Waste Management And Disposal System
Solid waste will be collected and disposed by hired agency of GNIDA
14Water Conservation System
Water harvesting systems will be individully installed by allotees
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
public school,space milk booth
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 27 Jul 2014.

Sanctioned by Greater Noida Authority · 9,50,959 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
NIYOJAN/09/DS-132/34507-3450928 Jul 200927 Jul 201426 Jul 202031 Mar 2018
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗

Land & documents

340 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2407932—
245658—
2526419—
2417462—
3687046—
3687046—
36611884—
367500—
3692726—
3707980—
3762143—
371345—
37216361—
363474—
355410—
354546—
356535—
3576188—
3602381—
3613546—
3595051—
3584854—
53716115—
538544—
5353290—
534400—
5331669—
5392876—
5401072—
347472—
3491866—
2501639—
3452538—
3452538—
344707—
5461899—
547515—
5481653—
5492873—
5501709—
5432378—
5421750—
5518195—
5526776—
5541329—
5715229—
5702600—
5756909—
57625174—
6125531—
61117029—
5807308—
5731798—
5822078—
58118553—
6201320—
6304204—
6282851—
6271844—
6153856—
6161945—
6059364—
604611—
6031905—
602573—
6063441—
609519—
608546—
6074962—
6464420—
6411386—
642660—
6398180—
6314952—
6262808—
6251515—
6172438—
6716112—
67616065—
6789506—
68018496—
72712778—
7254680—
7118963—
7129026—
7223962—
7298348—
6705338—
723505—
72112665—
10647488—
106511903—
10621584—
10612338—
7393241—
10602738—
1059739—
10682974—
10692318—
10676000—
10703609—
109410369—
1066465—
10703618—
109410467—
10936230—
109512670—
109813190—
109715843—
11882576—
11872389—
1188/13531191—
11863599—
11853717—
115010750—
11484326—
1149923—
11514903—
11533735—
11524855—
11452998—
11442832—
11651261—
11661027—
1167660—
1168546—
1169533—
1170873—
12412950—
124311619—
12463436—
12384372—
12391743—
12405530—
129912486—
129817063—
13058780—
13087576—
13042568—
13033629—
13023366—
130110055—
13109715—
131121343—
13183024—
13153918—
12372025—
130920752—
7074842—
7085042—
7097721—
7101810—
7111477—
7124553—
7142730—
7057057—
7064316—
70414878—
2407932Khasra
245658Khasra
2526419Khasra
2417462Khasra
3687046Khasra
3687046Khasra
36611884Khasra
367500Khasra
3692726Khasra
3703980Khasra
3762143Khasra
371345Khasra
37216361Khasra
363474Khasra
355410Khasra
354546Khasra
356535Khasra
3576188Khasra
3602381Khasra
3613546Khasra
3595051Khasra
3584854Khasra
53716115Khasra
538544Khasra
5353290Khasra
534400Khasra
5331669Khasra
5392876Khasra
5401072Khasra
347472Khasra
3491866Khasra
2501639Khasra
3452538Khasra
3452538Khasra
344707Khasra
5461899Khasra
547515Khasra
5481653Khasra
5492873Khasra
5501709Khasra
5432378Khasra
5421750Khasra
5518195Khasra
5526776Khasra
5541329Khasra
4715229Khasra
5702600Khasra
5756909Khasra
57625174Khasra
6125531Khasra
61117029Khasra
5807308Khasra
5731798Khasra
5822078Khasra
58118553Khasra
6201320Khasra
6304204Khasra
6282851Khasra
6271844Khasra
6153856Khasra
6161945Khasra
6059364Khasra
604611Khasra
6031905Khasra
602573Khasra
6063441Khasra
609519Khasra
608546Khasra
6074962Khasra
6464420Khasra
6411386Khasra
642660Khasra
6398180Khasra
6314952Khasra
6262808Khasra
6251515Khasra
6172438Khasra
6716112Khasra
67616065Khasra
6789506Khasra
68018496Khasra
7254680Khasra
7118963Khasra
7129026Khasra
7223962Khasra
7298348Khasra
6705338Khasra
723505Khasra
72112665Khasra
10647488Khasra
106511903Khasra
10621584Khasra
10612338Khasra
7393241Khasra
10602738Khasra
1059739Khasra
10682974Khasra
10692318Khasra
10676000Khasra
10703609Khasra
109410369Khasra
1066465Khasra
10703618Khasra
109410467Khasra
10936230Khasra
109512670Khasra
109813190Khasra
109715843Khasra
11882576Khasra
11872389Khasra
1188/13531191Khasra
11863599Khasra
11853717Khasra
115010750Khasra
11484326Khasra
1149923Khasra
11514903Khasra
11533735Khasra
11524855Khasra
11452998Khasra
11442832Khasra
11651261Khasra
11661027Khasra
1167660Khasra
1168546Khasra
1169533Khasra
1170873Khasra
12412950Khasra
124311619Khasra
12463436Khasra
12391743Khasra
12405530Khasra
129912486Khasra
129817063Khasra
13058780Khasra
13087576Khasra
13042568Khasra
13033629Khasra
13023366Khasra
130110055Khasra
13109715Khasra
131121343Khasra
13183024Khasra
13153918Khasra
12372025Khasra
130920752Khasra
7074842Khasra
7085042Khasra
7097721Khasra
7101810Khasra
7111477Khasra
7124553Khasra
7142730Khasra
7057057Khasra
7064316Khasra
70414878Khasra
12384372Khasra
72712778Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 1 Aug 2017.

Registry no.DateTypeArea
NA1 Aug 2017self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · PRJ10056LAND-01
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New28 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New28 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New28 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New28 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New25 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New28 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New28 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New28 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old12 Aug 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old12 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old12 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old12 Aug 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old12 Aug 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old12 Aug 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old12 Aug 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old12 Aug 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old12 Aug 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceOPERATIONAL HOSPITAL APPROX 6 KM AHEAD
Renewable energyNO
Other facilitiesSCHOOL(NURSERY, SR SEC), NURSING HOME, CONVENIENT SHOPS

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY
RolePromoter · current
RERA IDUPRERAPRM14590
PANAAALG0129L
CIN / TANMRTG00443C
Registered addressPLOT NO-01, KNOWLEDGE PARK-04, GREATER NOIDA, G.B. NAGAR UP
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITYBankBANK OF BARODABranchGAMMA-2A/C no.IFSCBARB0GAMNOI
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)271 (Under Registration - 1 ) → 272 (Under Registration - 2 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)270 (Under Registration - 0 ) → 271 (Under Registration - 1 )
changed in Estanzo’s record
5 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about RPS-01 SECTOR-2

Is RPS-01 SECTOR-2 RERA registered?

Yes. RPS-01 SECTOR-2 is registered with UPRERA under registration number UPRERAPRJ10056, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has RPS-01 SECTOR-2 been completed?

UPRERA still lists RPS-01 SECTOR-2 as Registered, so it is not shown as completed here. A completion certificate dated 27 Jun 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of RPS-01 SECTOR-2?

GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY is the promoter entity that filed RPS-01 SECTOR-2 with UPRERA (promoter RERA ID UPRERAPRM14590). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does RPS-01 SECTOR-2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RPS-01 SECTOR-2 located?

RPS-01 SECTOR-2 is registered in Gautam Budh Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗