Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
83.68%Q3'25
83.68%Q4'25
100%Q1'26
100%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ286419
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start1 Apr 2024
Project duration31 months
Address160PART,161PART,164PART,165/1PART,165/2PART,167PART,170PART,174PART,175PART,245PART,246PART AND 250PART, VILLAGE-NOORNAGAR, BIJLI-BAMBA BYEPASS ROAD, MEERUT-250002, Meerut, Meerut
TehsilMeerut
Applicant typePartnership Firm
Applicant address207, 2ND FLOOR, SARASWATI PLAZA, SHIVAJI ROAD, MEERUT-250002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    MeDA/24-25/P/2541-1

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered17 Feb 2025
Original completion30 Jun 2026
Revised completion30 Oct 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,02,500
Sanctioning authorityMeerut Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
CHIRAG GUPTA
License CA/2016/76408
C-2/13/18 GUPTA COMPLEX, SHASTRI NAGAR, MEERUT
Engineer
KULBHUSHAN MITTAL
110, CITI CENTRE, MEERUT
Contractor
VEDICA HANDICRAFT
441, CHOBE COMPOUND, W K ROAD, MEERUT
Sr.Development work declared to RERA
1Demarcation of Plots
Site is located at Khasra No 160 Part, 161 Part, 164Part, 165/1Part, 165/2Part, 167Part, 170part, 174part,175part,245part, 246part and 250part. Side is located around 200 m from Bijli Bamba-Byepass Road, Meerut. Side is approximate 1 Km from Shatabdi Nagar RRTS station.
2Boundary Wall
A 2-meter high, 230-mm thick brick wall with RCC columns and beams will be constructed. At the corner facing road, the project logo will be displayed with RERA Number and RERA QR code. Iconic design gate will be fixed at the entrance of the project.
3Road Work
Form the main entrance gate we have 80mm thick interlocking brick/RCC road throughout the project, whose wideness starts from 10mtrs.
4Footpaths
1.5 m wide Footpath is provided for Pedestrian wherever required on the side of road in entry exit locations. Footpath will be build with pavour block tiles .
5Water Supply Including Drinking Water Facilities
Drinking water supply will be made at the plot. Pipeline will be connected from water Overhead Tank. Water overhead Tank of 150 KLD will be build.
6Sewer System
We will be providing STP and overflow from the STP will be connected with the drain system.
7Drain
Storm water shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with drain line.
8Parks
Parks / Green area in the project will be approx 6002.70 SQM approx. Children play area will be provided.
9Tree Planting
Yes, more than 130 Trees of different category such as ornamental, shady and native species shall be planted in the project.
10Design For Electric Supply Including Street Lighting
Transformer, HT Panel Room, LT Panel Room, Designer Electric Poles, Led Lights will be Provided. All Electrical related workings shall be as per bureau of Indian standards, Indian Electricity rules.
11Community Buildings
Not provided/Not applicable.
12Treatment and Disposal System of Sewage and Sullage water
All Sewerage water will go the STP and overflow from the STP will be connected with the Municipal sewerage system. When come into force.
13Solid Waste Management And Disposal System
Solid waste generated will be will be segregated at its point of generation in the different color bins on the basis of tis biodegradability at a single disposable point, the collection and disposal of the solid waste from the project is done in such a way that it will be scientifically dispose no causing any eyesore or adverse effect to the surroundings.
14Water Conservation System
Rain water harvesting system with proper rainwater harvesting pit are provided on site, water savings fixture are provided in the building treated water from STP is to be used for flushing, gardening and landscaping purpose in the building, to conserve water and waste as less possible.
15Energy Management System Including Use of Renewable Energy
We will utilize LED lighting in external and common areas, along with solar lights in landscaped zones. All engineering equipment will be energy-efficient, and we will also recommend that individuals use LED lights and energy-efficient air conditioning systems.
16Fire Protection And Fire Safety System
Fire hydrants will be installed at the site. Water connection will be arranged for fire hydrants as per requirements.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not to be provided.
18Emergency Evacuation Services
Plotted development only, hence not applicable.
19Other Miscellaneous Work
CCTV camera and guard hut will be provided at the entrance of the colony.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 11 Nov 2029.

Sanctioned by Meerut Development Authority · 39,443 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MeDA/24-25/P/2541-111 Nov 202411 Nov 202911 Nov 203130 Jun 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Oct 2026.

#Granted fromExtended uptoNote
130 Jun 202630 Oct 2026—

Land & documents

29 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
160505.55Khasra
161/18526Khasra
2502989.73Khasra
164418.20Khasra
165/183.61Khasra
165/2866.39Khasra
167AB1497Khasra
174354.32Khasra
1701505.50Khasra
175278.67Khasra
245AND24619512.36Khasra
2451334.29Khasra
2462124Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 8021
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5254
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 16741
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 12905
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8555
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 135
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15002
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14962
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14963
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14495
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6392
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 4907
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 5972
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3279
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5933
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5930
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 7136
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · CONSORTIUM AGREEMENT
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · LEGAL AND ENCUMBRANCE DETAILS WITH MORTGAGE DEED AND LEGAL OPINION
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · PAYMENT MADE RECEIPT AGAINST POINT NO-3 OF THE SANCTION LETTER
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Dec 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New19 Dec 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New19 Dec 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New20 Dec 2024 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New19 Dec 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New20 Dec 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New19 Dec 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New11 Jan 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Dec 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New11 Jan 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New19 Dec 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New20 Dec 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New20 Dec 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New11 Jan 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New19 Dec 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q1.

QuarterConstructionCertificates
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q283.68%CA ↗ · Arch ↗ · Eng ↗
2025-Q383.68%CA ↗ · Arch ↗ · Eng ↗
2025-Q4100%CA ↗ · Arch ↗ · Eng ↗
2026-Q1100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSARASWATI SAGAR
RolePromoter · current
RERA IDUPRERAPRM336098
PANACJFS9052K
CIN / TANMRTS09552E
Registered address207, 2ND FLOOR, SARASWATI PLAZA, SHIVAJI ROAD, MEERUT-250002
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameAMIT KUMAR
RoleCo-promoter · current
RERA IDUPRERAPRM21727
Applicant typeIndividual
PANAADCV8074B
Registered address438/24 SUMAN VIHAR MUZAFFARNAGAR CITY , MUZAFFARNAGAR, UP -251002
RERA contact
Registered since2017
Legal nameMR. VARUN AGARWAL
RoleCo-promoter
Applicant typeIndividual
AddressS/O AMIT AGARWAL 4 VIJAY NAGAR, BEGUM BAGH, MEERUT
RERA contact
Legal nameSARASWATI INFRA AND DEVELOPERS PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
Address4, VIJAY NAGAR, SHIVA JI ROAD, MEERUT-250002
RERA contact
Legal nameT. T. V. ENTERPRISES
RoleCo-promoter
Applicant typePartnership Firm
AddressS-2, SECOND FLOOR, SARASWATI ENCLAVE, SHIVAJI ROAD, MEERUT-250002
RERA contact
Legal nameSRASHTI ENTERPRISES
RoleCo-promoter
Applicant typePartnership Firm
Address2ND FLOOR, SARASWATI PLAZA, MEERUT-250002
RERA contact
Legal nameTIRUPATI ASSOCIATES
RoleCo-promoter
Applicant typePartnership Firm
AddressA-49, SHATABDI NAGAR, MEERUT-250002
RERA contact

Nearby projects

Meerut

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SARASWATI SAGAR COLLECTION ACCOUNT FOR SARASWATI GREENS PHASE-1BankPUNJAB NATIONAL BANKBranchMEERUT COLLEGEBranch addressMEERUT COLLEGE MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCPUNB0484200Branch emailbo4842@pnb.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SARASWATI SAGAR SEPARATE ACCOUNT FOR SARASWATI GREENS PHASE-1BankPUNJAB NATIONAL BANKBranchMEERUT COLLEGEBranch addressMEERUT COLLEGE MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCPUNB0484200
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SARASWATI SAGAR TRANSACTION ACCOUNT FOR SARASWATI GREENS PHASE-1BankPUNJAB NATIONAL BANKBranchMEERUT COLLEGEBranch addressMEERUT COLLEGE MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCPUNB0484200
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Revised completion date on file2026-06-30 → 2026-10-30
changed in Estanzo’s record
7 Oct 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SARASWATI GREENS PHASE-1

Is SARASWATI GREENS PHASE-1 RERA registered?

Yes. SARASWATI GREENS PHASE-1 is registered with UPRERA under registration number UPRERAPRJ286419, registered on 17 Feb 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SARASWATI GREENS PHASE-1?

The completion date filed with UPRERA is 30 Oct 2026. No completion certificate is on record yet.

Who is the builder of SARASWATI GREENS PHASE-1?

SARASWATI SAGAR is the promoter entity that filed SARASWATI GREENS PHASE-1 with UPRERA (promoter RERA ID UPRERAPRM336098). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SARASWATI GREENS PHASE-1 more time to complete?

UPRERA's record carries 1 completion extension for SARASWATI GREENS PHASE-1, the latest running to 30 Oct 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SARASWATI GREENS PHASE-1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SARASWATI GREENS PHASE-1 located?

SARASWATI GREENS PHASE-1 is registered in VILLAGE-NOORNAGAR, BIJLI-BAMBA BYEPASS ROAD, MEERUT-250002, Meerut, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗