SARASWATI VATIKA EXTENSION

UPRERARegistered

SARASWATI VATIKA EXTENSION is a RERA-registered residential project by SARASWATI BUILDCON in Meerut (RERA ID UPRERAPRJ997927). Registered with a completion deadline of 31 Dec 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ997927
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start1 Jul 2020
Project duration54 months
AddressMeerut, Meerut
TehsilMeerut
Applicant typePartnership Firm
Applicant addressS-2, SARASWATI ENCLAVE, SHIVAJI ROAD, MEERUT-250002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP20191223130445090

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered8 Sept 2020
Original completion31 Dec 2024
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary27 Jan 2024
Registration fee₹93,500
Sanctioning authorityMeerut Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
KULBHUSHAN MITTAL
License AM085420-7
110, CITI CENTRE, BEGUM BRIDGE ROAD, MEERUT
Engineer
SHUBHAM PUNDIR
E-91/2 SHASTRI NAGAR MEERUT
Contractor
AKASH MANGLIK
103, DALAMPARA, MEERUT
Sr.Development work declared to RERA
1Demarcation of Plots
all plots will be marked on the boundary wall and top of the drain.
2Boundary Wall
9 Inches thick brick work will be done in boundary wall with plaster and whitewash over it
3Road Work
1. Earth Work in cutting and filling: 12 mtr. Wide 163 x 7.50 x 0.45 = 550.13 Cu Mtr. 9 mtr. Wide 120 x 5 x 0.45 = 270.00 Cu Mtr. 7.5 mtr. Wide 158 x 4 x 0.45 = 284.40 Cu Mtr. 2. Brick Soiling 12 mtr. Wide 150.28 x 3 x 0.10 = 450.84 Sq. Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 184.50 Sq. Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 75.75 Sq. Mtr 7.5 mtr. Wide 158 x 4 x 0.10 = 63.20 Cu Mtr. 5% of Curves = 12.27 Cu Mtr. 3. Brick Soiling 12 mtr. Wide 150.28 x 3 x 0.10 = 450.84 Sq. Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 184.50 Sq. Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 75.75 Sq. Mtr 5% of Curves = 31.77 Sq. Mtr. 4. Stone Soiling : (25 - 50) 12 mtr. Wide 150.28 x 7.50 x 0.10 = 112.71 Cu Mtr. 9 mtr. Wide 123 x 5 x 0.10 = 61.50 Cu Mtr. 7.5 mtr. Wide 50.50 x 4 x 0.10 = 20.20 Cu Mtr. 5% of Curves = 8.71 Cu Mtr. 5. Earth Work in cutting and filling: 12 mtr. Wide 150.28 x 3 x 0.10 = 45.08 Cu Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 18.45 Cu Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 7.58 Cu Mtr. 5% of Curves = 3.18 Cu mtr. 5% of Curves = 31.77 Sq. Mtr.
4Footpaths
1. Earth Work in cutting and filling: 12 mtr. Wide 163 x 7.50 x 0.45 = 550.13 Cu Mtr. 9 mtr. Wide 120 x 5 x 0.45 = 270.00 Cu Mtr. 7.5 mtr. Wide 158 x 4 x 0.45 = 284.40 Cu Mtr. 2. Brick Soiling 12 mtr. Wide 150.28 x 3 x 0.10 = 450.84 Sq. Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 184.50 Sq. Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 75.75 Sq. Mtr 7.5 mtr. Wide 158 x 4 x 0.10 = 63.20 Cu Mtr. 5% of Curves = 12.27 Cu Mtr. 3. Brick Soiling 12 mtr. Wide 150.28 x 3 x 0.10 = 450.84 Sq. Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 184.50 Sq. Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 75.75 Sq. Mtr 5% of Curves = 31.77 Sq. Mtr. 4. Stone Soiling : (25 - 50) 12 mtr. Wide 150.28 x 7.50 x 0.10 = 112.71 Cu Mtr. 9 mtr. Wide 123 x 5 x 0.10 = 61.50 Cu Mtr. 7.5 mtr. Wide 50.50 x 4 x 0.10 = 20.20 Cu Mtr. 5% of Curves = 8.71 Cu Mtr. 5. Earth Work in cutting and filling: 12 mtr. Wide 150.28 x 3 x 0.10 = 45.08 Cu Mtr. 9 mtr. Wide 123 x 1.5 x 0.10 = 18.45 Cu Mtr. 7.5 mtr. Wide 50.50 x 1.5 x 0.10 = 7.58 Cu Mtr. 5% of Curves = 3.18 Cu mtr. 5% of Curves = 31.77 Sq. Mtr.
5Water Supply Including Drinking Water Facilities
1. Over head water tank for a capacity of 150000 Liters 2. Providing and fixing of 140 mm dia PVC pipe pvc special such as bendss, tee, socket cross, clamps etc. Earth work including filling the trenches etc. 450 mtr. 3. Boring of tube well and installation of pump 5 HP 4. Civil work in Misc. Items
6Sewer System
1. Providing and laying class NP2 pressure pipes with collar tested to 40 Smm head, jointed 450 meter 2. Construction Brick masonry manhole class designation bith cement mortar 1 : 5. 38 Nos.
7Drain
"Brick Masonry - open surface drains Drains in cementmortar 1 : 6 including earth excavation and disposal after refilling of excavated earth 7.5 cm. Thick bed concrete 1 : 5 : 10, 25 mm thick C.C. 1 : 2 : 4 for filling hunches, including 12 mm Cement plaster 1 : 4 finished with floating cost of neat cement in side drain, top and exposwed sides etc. complete CULVERTS 1 No. 12.00 meter. Long 2 No. 9.00 meter. Long Total length of culverts 30.00 meter. Calculation for 1.0 mtr. Long culvert span 0.30 meter. 1. Eartn work in excavation 1 x 1.00 x 1.35 x 0.50 = 0.675 Cu. Mtr. 2. Cement Concrete in foundation 1 : 3 : 6 1 x 1.00 x 1.35 x 0.10 = 0.135 Cu. Mtr. 3. Brick work in cement mortar C.M 1 : 6 (1 cement : 6 Coarse sand) abutment 2 x 1.00 x 0.46 x 0.15 = 0.138 Cu. Mtr. 2 x 1.00 x 0.35 x 0.30 = 0.21 Cu. Mtr. Total = 0.348 Cu. Mtr. 4. R.C.C. slab 1 : 1.5 : 3 1 x 1.00 x 0.30 x 0.05 = 0.015 Cu. Mtr. 5. Plaster 1 : 4 Cement and C. Send 2 x 1.00 x 0.45 = 0.90 sq. Mtr. 6. R.C.C. slab 1 : 1.5 : 3 1 x 1.00 x 1.00 x 0.15 = 0.15 Cu. Mtr. 7. Steel 1.50 x 0.22 x 0.785 = 0.259 Qtl. Rate per meter length of culvert Total Length of Culvert" 1. Earth work in excavation 10 x 0.76 x 0.45 = 3.42 Cu mtr 2. P.C.C. 1 : 5 : 10 10 x 0.76 x 0.075 = 0.57 Cu mtr. "3. M-100 Brick work in 1: 6 Cement and Core sand 2 x 10.0 x 0.23 x 0.45 = 2.07 Cu mtr." "4. R.C.C. 1 : 1.5 : 3 10 x 0.30 x 0.025 = 0.075 Cu Mtr." "5. 12 mm Thick plaster 1 : 4 1 x 10 x 1.36 = 1360 Sq. Mtr." "Total length of drains 441.00 R. Mtr."
8Parks
Elevated parks with cement curve stone with light poles and plantation and swings for childerns.
9Tree Planting
Tree plantation shall be done in parks and sides of main roads of the colony.
10Design For Electric Supply Including Street Lighting
Electric supply shall be done by UPPVNL and payment will be made as per electric department estimate and LED street lights will be placed at every pole.
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
Underground STP based on ever clean RCC hollow tanks (ERHT) system.
13Solid Waste Management And Disposal System
NOT APPLICABLE
14Water Conservation System
Underground rain water harvesting system will be constructed in brick work with RCC Slab as per Govt. Norms.
15Energy Management System Including Use of Renewable Energy
NOT APPLICABLE
16Fire Protection And Fire Safety System
Fire Hyderant shall be installed on the junctions of the colony.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NOT APPLICABLE
18Emergency Evacuation Services
NOT APPLICABLE
19Other Miscellaneous Work
NOT APPLICABLE
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Jan 2025.

Sanctioned by Meerut Development Authority · 17,667 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MAP2019122313044509023 Jan 202022 Jan 202522 Jan 202831 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
293A+B17667Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 3813
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5873
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14602
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 4277
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 15062
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5252
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12225
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13837
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13839
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7717
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3754
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4001
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10936
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11406
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2766
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 193
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15862
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 16889
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11671
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15181
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2765
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2879
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11416
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4760
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 781
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 652
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 17133
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15312
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15315
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15313
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13180
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2876
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4138
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4140
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8374
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14531
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1856
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1129
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9904
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4759
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9902
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15675
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5563
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4505
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15373
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5206
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1130
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5873
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4204
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14512
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10156
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7266
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8556
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5585
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1095
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10265
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 87
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 3813
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 12225
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 13837
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4760
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8374
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5563
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1130
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10733
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · explanation letter to objections
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · CONSORTIUM 26082020
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Jul 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New28 Jul 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New28 Jul 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New28 Jul 2020 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New29 Jul 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Jul 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Jul 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Jul 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Jul 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Aug 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New28 Jul 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New28 Jul 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New28 Jul 2020 ↗

Quarterly progress reports

19 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

19 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSARASWATI BUILDCON
RolePromoter · current
RERA IDUPRERAPRM120105
PANACHFS6159B
CIN / TANMRTS09158C
Registered addressS-2, SARASWATI ENCLAVE, SHIVAJI ROAD, MEERUT-250002
RERA contact
Registered since2020
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Meerut

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SARASWATI BUILDCONBankUCO BANKBranchSHASTRI NAGAR MEERUTA/C no.IFSCUCBA0002544
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SARASWATI VATIKA EXTENSION

Is SARASWATI VATIKA EXTENSION RERA registered?

Yes. SARASWATI VATIKA EXTENSION is registered with UPRERA under registration number UPRERAPRJ997927, registered on 8 Sept 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has SARASWATI VATIKA EXTENSION been completed?

UPRERA still lists SARASWATI VATIKA EXTENSION as Registered, so it is not shown as completed here. A completion certificate dated 27 Jan 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of SARASWATI VATIKA EXTENSION?

SARASWATI BUILDCON is the promoter entity that filed SARASWATI VATIKA EXTENSION with UPRERA (promoter RERA ID UPRERAPRM120105). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SARASWATI VATIKA EXTENSION have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SARASWATI VATIKA EXTENSION located?

SARASWATI VATIKA EXTENSION is registered in Meerut, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗