SARASWATI VATIKA COLONY-( I-BLOCK )

UPRERARegistered

SARASWATI VATIKA COLONY-( I-BLOCK ) is a RERA-registered mixed project by SARASWATI BUILDCON in NOOR NAGAR, Meerut (RERA ID UPRERAPRJ463620). Registered with a completion deadline of 31 Dec 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ463620
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start1 Oct 2023
Project duration15 months
AddressKHASRA NO-293A & B,, NOOR NAGAR, Meerut, Meerut
TehsilMeerut
Applicant typePartnership Firm
Applicant addressS-2, SARASWATI ENCLAVE, SHIVAJI ROAD, MEERUT-250002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLOTTED DEVELOPMENT/01916/MDA/LD/21-22/0133/09082021

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Sept 2024
Original completion31 Dec 2024
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary7 Jan 2025
Registration fee₹30,000
Sanctioning authorityMeerut Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AMIT BHARDWAJ
License CA/2011/53574
D-166 SHASTRI NAGAR MEERUT
Engineer
KULBHUSHAN MITTAL
110 CITI CENTRE MEERUT
Contractor
AMIT KUMAR
38 VIJAYLOK MAWANA ROAD MEERUT
Sr.Development work declared to RERA
1Demarcation of Plots
DEMARCATION OF PROJECT HAS BEEN COMPLETED BY BOUNDRYWALL OF 1.2 METER HEIGHT. Providing 1.2 meter height fencing with angle iron post 50--50-6 mm at 3m c/c with 0.4 embeeded in ground in cc 1-5-10 stone agg, 40 mm nominal size and every 10 th post situated provided with welded steel wire and fixed to iron post .
2Boundary Wall
A 1.2 METER HEIGHT BOUNDRYWALL CONSTRUCTED AND COMPLETED ON ENTIRE PROJECT AREA.
3Road Work
REQUIRED THICKNESS OF B.C. WITH SEALCOAT OR INTERMEDIATE BASE OVER SUB-BASE WILL BE DONE IN THE WIDTH .
4Footpaths
AN M-15 GRADE OF PAVERBLOCK INTERLOCKING TILES WILL BE LAID IN THE PROJECT FOR THE WALKING AREAS. TILE WILL BE 3 TO 4 INCH THICK AND THE COLOUR PATTERNS WILL BE LASTING AND VISIBLE ALL HOURS.
5Water Supply Including Drinking Water Facilities
OVERHEAD WATER TANK OF 150000 LITRE TO BE PROVIDED. Providing and fixing of 140mm dia PVC pipe pve speical such as bends. tee and other materials. Boring of tubewell and installation of pump of 5 HP.
6Sewer System
A SEVERAGE WILL BE COLLECTED THROUGH RCC HUME PIPES ARRANGEMENT AND INSPECTION CHAMBERS LEADING TO THE STP TANK OF THE PROJECT, FROM WHERE THE SEVERAGE WILL BE DISPOSED OFF. Providing and laying class NP2 prssure pipes with collar tested to 40sm head, joined 450 meters. Construction of brick massonry mainhole class designation with cement mortar in 1-5 ratio of 38 numbers.
7Drain
SURFACE DRAIN WILL BE LAID ON LEAN CONCRETE BAD EARTH ON COMPACTED EARTH IN REQUIRED SIZE WITH BREAK WORK 1X4 PLASTER OVER IT. Drains in cementmortar 1 to 6 ratio including earth excavation and disposal after refilling of excavated earth 7.5 cm. Thick bed concrete 1-5-10-25cm thick CC 1-2-4 ratio for filling hunches including 12 mm plaster.
8Parks
NOT APPLICABLE
9Tree Planting
NOT APPLICABLE
10Design For Electric Supply Including Street Lighting
ELECTRIC LAYOUT AND CAPACITY WILL BE INSTALLED TO SUFFICE THE DOMESTIC USE OF THE PROJECT. THE LOAD SANCTION WILL BE TAKEN FROM ELECTRIC DEPARTMENT. 24 poles to be installed .
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
STP BASED ON BLANKET REACTOR SYSTEM WITH AIRPUMPS FOR AERATION SYSTEM AND HYPO CLORIDE SOLUTION WITH CHEMICAL CATALYST SYSTEM AND AFTER MAKING SLUDGE CLEAN IT WILL BE PUMP TO THE FILTER AND THEN WILL BE DISPOSED.
13Solid Waste Management And Disposal System
AREA FOR SOLID WATER SHALL BE PROVIDED AS PER MDA APPROVED DRAWING AND SHOWED IN DEVELOPMENT PLAN.
14Water Conservation System
RAIN WATER HARVESTING SYSTEM -2 wells to be installed.
15Energy Management System Including Use of Renewable Energy
NOT APPLICABLE
16Fire Protection And Fire Safety System
FIRE PROTECTION AND FIRE SAFETY SYSTEM WILL BE INSTALLED AT ALL THE CROSSING OF THE COLONY. 4 fire extnguishers to be installed.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NOT APPLICABLE
18Emergency Evacuation Services
NOT APPLICABLE
19Other Miscellaneous Work
NOT APPLICABLE
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 19 Jun 2027.

Sanctioned by Meerut Development Authority · 2,999 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLOTTED DEVELOPMENT/01916/MDA/LD/21-22/0133/0908202120 Jun 202219 Jun 202719 Jun 202931 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
293A AND B2999Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 5564
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7525
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9963
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4621
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14200
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1560
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14567
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5893
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1129
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12809
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6698
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4623
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2274
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5625
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1853
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8557
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10892
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · CONSORTIUM AGREEMENT
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · PARTNERSHIP DEED
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · RA-7
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · SIZRA PLAN AND SUPERIMPOSED MAP
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · NEW RA-1
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · LEGAL REPORT OF SALE DEED NO 8557 TO PROVE OWNERSHIP OF SARASWATI BUILDCON
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · REPLY DATED 20.07.2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · ADVOCATE ENCUMBRANCE CERTIFICATE VOLUME 1
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · LEGAL ENCUMBARNCE VOLUME 2
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · CONSORTIUM AGREEMENT 09.08.2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · SUPERIMPOSED SIZRA PLAN
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2024 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New6 Jul 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Jul 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New20 Jul 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New22 Jul 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New20 Jul 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New6 Jul 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New6 Jul 2024 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2023-Q3 to 2024-Q3.

QuarterConstructionCertificates
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSARASWATI BUILDCON
RolePromoter · current
RERA IDUPRERAPRM120105
PANACHFS6159B
CIN / TANMRTS09158C
Registered addressS-2, SARASWATI ENCLAVE, SHIVAJI ROAD, MEERUT-250002
RERA contact
Registered since2020
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameMADHU AGARWAL
RoleCo-promoter
Applicant typeIndividual
Address4 vijay nagar meerut
RERA contact
Legal nameMR. VARUN AGARWAL
RoleCo-promoter
Applicant typeIndividual
AddressS/O AMIT AGARWAL 4 VIJAY NAGAR, BEGUM BAGH, MEERUT
RERA contact

Nearby projects

Meerut

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SARASWATI BUILDCON COLLECTION ACCOUNT -SARASWATI VATIKA COLONY ( I-BLCOK)BankKARUR VYSYA BANKBranchMEERUTBranch addressKUMAR PLAZA MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCKVBL0004403Branch emailMEERUT@KVBMAIL.COM
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SARASWATI BUILDCON SEPERATE ACCOUNT FOR SARASWATI VATIKA COLONY-(I-BLOCK)BankKARUR VYSYA BANKBranchMEERUTBranch addressKUMAR PLAZA MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCKVBL0004403
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SARASWATI BUILDCON TRANSACTION ACCOUNT- SARASWATI VATIKA COLONY ( I-BLOCK)BankKARUR VYSYA BANKBranchMEERUTBranch addressKUMAR PLAZABranch districtMeerut, Uttar PradeshA/C no.IFSCKVBL0004403
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SARASWATI VATIKA COLONY-( I-BLOCK )

Is SARASWATI VATIKA COLONY-( I-BLOCK ) RERA registered?

Yes. SARASWATI VATIKA COLONY-( I-BLOCK ) is registered with UPRERA under registration number UPRERAPRJ463620, registered on 14 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.

Has SARASWATI VATIKA COLONY-( I-BLOCK ) been completed?

UPRERA still lists SARASWATI VATIKA COLONY-( I-BLOCK ) as Registered, so it is not shown as completed here. A completion certificate dated 7 Jan 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of SARASWATI VATIKA COLONY-( I-BLOCK )?

SARASWATI BUILDCON is the promoter entity that filed SARASWATI VATIKA COLONY-( I-BLOCK ) with UPRERA (promoter RERA ID UPRERAPRM120105). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SARASWATI VATIKA COLONY-( I-BLOCK ) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SARASWATI VATIKA COLONY-( I-BLOCK ) located?

SARASWATI VATIKA COLONY-( I-BLOCK ) is registered in NOOR NAGAR, Meerut, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗