SATYAM GALLERIA

UPRERARegistered

SATYAM GALLERIA is a RERA-registered commercial project by PRO INFRAREAL PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ945505). Registered with a completion deadline of 9 Oct 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
76.31%Q3'25
90.5%Q4'25
92.29%Q1'26
92.54%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ945505
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start22 Sept 2022
Project duration49 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressLS-2,SECTOR-P4,GREATER NOIDA,GB NAGAR,UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    SCR-14553

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered4 Nov 2022
Original completion9 Oct 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹42,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 1 · 7 (from plan)
ConfigurationUnitsCarpet area
SHOP—94-1,070
OTHER—1,081
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
SATYAM GALLERIA · SHOP, OTHER7—94-1,081
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MANISH JAIN AND ASSOCIATES
License CA\2001/28163
E 131 EAST OF KAILASH DELHI 110065
Engineer
SURIYAPRAKASH P
11/75, 2ND FLOOR SUBHASH NAGAR,DELHI,110027
Contractor
HASAN ALI
GREATER NOIDA
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of plot with 230mm toe wall ,and layout to Building Base line is mark on the ground either from the centre line of the Road or from any permanet building nearby and This line helps to mark out the front of a Building.
2Boundary Wall
Boundary wall with 230mm toe wall,anf fence constructed to spaerate the Land between two adjoining landowners,Boundry wall in brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 75 in cement mortar (1;6) on RCC footing and column structure
3Road Work
Laying of Road with proper longitudinal and cross -sectional road slopes as per design.
4Footpaths
Laying of Pavers of Tiles over well compected subgrade with GSB layers.
5Water Supply Including Drinking Water Facilities
system comprising of sand filter and activated carbon filter alongwith softener .The Water distribution (fresh and resycled water)by means of pumped main laid suspended to basement celling a saprate network of pipe laid for soft landscaped areas with seperate pumps .Water Supply aftertreatment will be pumped from UGT to OHT
6Sewer System
soil waste from toilets kitchen will be collected in single network of sewer pipes laid underground having manholes /inspection chamber at approprate intervals .main holes will be provided for all depths starting from 900 mm with precast cement concrete /SFRC covers medium duty type with frame .sewar system with DWC HDPE or Equivalent Pipe shall be connected to Authority disposal line
7Drain
The terrace and balcony of the building to be drained by means of down take pipe while open areas and roads would be drained into drains which are aligned along the roads with the complex.Saucer drain and RCC NP2 or equivalent Pipe shall be connected to Rain water harvesting pits and over flow to Authority drainage system
8Parks
N.A.
9Tree Planting
N.A
10Design For Electric Supply Including Street Lighting
The power shall be made available by meter by npcl seprately for commen services and at a multipoint for consumer wherein meter boards shall be places at respective floors with the rising mains.Under ground electric supply provided with 75 persent diversity factor and electric street lighting poles on pathways
11Community Buildings
N.A.
12Treatment and Disposal System of Sewage and Sullage water
provision of sewage treatement plant is propesed to treat the water generate recycle of treated effuent will reduce the total net fresh water demand on project thereby reducing the load on ground water source and dependency on municipal supply to be connected in external sewerage
13Solid Waste Management And Disposal System
segregation of dry and wet garbage with separete dustbins. collection and disposal through authorized vendors
14Water Conservation System
Rain Water harvesting and ground water recharging for roof and non roof area is provided the total volumetric capacity of recharge structures shall be as per regulation norms.provided latest irrigation system such as per drip irrigation /sprinkler system to reduse water consumption in horticulture to be provided
15Energy Management System Including Use of Renewable Energy
N.A.
16Fire Protection And Fire Safety System
Fire tender path shall be provided as per NBC fire fighting system along with pumps and water stroagetanks shall be provided as per NBC norms. Hydrants with autometic sprinkler and detection system shall be provided
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A.
18Emergency Evacuation Services
Staircase shall be provided in basement all the towers for fire /emergency exitas per norms
19Other Miscellaneous Work
N.A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 12 Sept 2027.

Sanctioned by Greater Noida Authority · 3,153 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
SCR-1455313 Sept 202212 Sept 202713 Sept 20279 Oct 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

28 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
LS-2,SECTOR-P43153Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 11735
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · CPS IX 2021 2200004
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Sale deed · 11735
The registered deed by which the promoter bought the land.
PDF ↗
Lease deed · 11735
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · GNIDA/COM/2022/872
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New10 Oct 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Oct 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Oct 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New10 Oct 2022 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New31 Oct 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New10 Oct 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New10 Oct 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New10 Oct 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New10 Oct 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Oct 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Oct 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New10 Oct 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New10 Oct 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New10 Oct 2022 ↗

Quarterly progress reports

17 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

17 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2026-Q2.

QuarterConstructionCertificates
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q276.31%CA ↗ · Arch ↗ · Eng ↗
2025-Q390.5%CA ↗ · Arch ↗ · Eng ↗
2025-Q492.29%CA ↗ · Arch ↗ · Eng ↗
2026-Q192.54%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePRO INFRAREAL PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM197825
PANAAHCP1083A
CIN / TANU70109DL2011PTC222804
Name of chairmanMANOJ KUMAR GARG
Registered addressLS-2,SECTOR-P4,GREATER NOIDA,GB NAGAR,UP
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
PROINFRAREAL P LTD-COLLECTION ACCOUNT FOR SATYAM GALLERIA PROJECTBankINDUSLND BANKBranchOMEGA GREATER NOIDABranch addressGROUND FLOOR SHOP NO-2,OMEGA GREATER NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000513
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
PRO INFRAREAL PRIVATE LIMITED-SEPARATE BANK ACCOUNTFOR SATYAM GALLERIA PROJECTBankINDUSLND BANKBranchOMEGA GREATER NOIDABranch addressSHOP NO-2 GROUND FLOORBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000513
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
PRO INFRAREAL P LTD -RERA TRANSACTION ACCOUNT FOR SATYAM GALLERIA PROJECTBankINDUSIND BANKBranchOMEGA BRANCHBranch addressGREATER NOIDABranch districtUttar PradeshA/C no.IFSCHDFC0000193
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
11 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SATYAM GALLERIA

Is SATYAM GALLERIA RERA registered?

Yes. SATYAM GALLERIA is registered with UPRERA under registration number UPRERAPRJ945505, registered on 4 Nov 2022. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SATYAM GALLERIA?

The completion date filed with UPRERA is 9 Oct 2026. No completion certificate is on record yet.

Who is the builder of SATYAM GALLERIA?

PRO INFRAREAL PRIVATE LIMITED is the promoter entity that filed SATYAM GALLERIA with UPRERA (promoter RERA ID UPRERAPRM197825). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SATYAM GALLERIA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SATYAM GALLERIA located?

SATYAM GALLERIA is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SATYAM GALLERIA?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SATYAM GALLERIA?

The approved unit plan filed with UPRERA runs from 94 to 1,081 m² of carpet area (about 1,008 to 11,631 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗