SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL

UPRERARegistered

SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL is a RERA-registered commercial project by SCC BUILDERS PVT. LTD. in Ghaziabad (RERA ID UPRERAPRJ171530). Registered with a completion deadline of 28 Nov 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ171530
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Sept 2019
Project duration75 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address3RD FLOOR H-69, SECTOR-63, NOIDA-201301, GAUTAMBUDH NAGAR ( UP)
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    07/PMAYGDA/MP/2018

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered23 Apr 2019
Original completion31 Aug 2022
Revised completion28 Nov 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary9 Jul 2026
Registration fee₹39,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors80 · 2 · 8 (units from plan)
Homes · commercial units8 · 72 (shops and offices filed in the same plan)
  • SHOP72 90%
  • OTHER8 10%
ConfigurationUnitsCarpet area
OTHER80-122
SHOP7210-29
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
COMMERCIAL-SHOPS AND NURSING HOME · SHOP, OTHER8760-29
NURSERY SCHOOL · OTHER44122
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 693.88 m² for a OTHER, 693.88 m² for a OTHER, 693.88 m² for a OTHER and 4 other units like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANUJ AGARWAL ARCHITECTS
License CA/96/19503
A-244 KAUSHAMBI GHAZIABAD
Engineer
VD SHARMA
B-24 SECTOR 67 NOIDA
Contractor
LAXMI BUILDERS AND TRANSPORT COMPANY
H-69, SECTOR -63, NOIDA 201301
Sr.Development work declared to RERA
1Demarcation of Plots
Marking of Plot Boundary will be as per possession given by previous owner in presence of Tehsil staff.
2Boundary Wall
At outter Periphery of Plot & will be constructed in Bricks/ RCC
3Road Work
Trimix / Interlocking Tiles
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
To be Provided by the Ghaziabad Development Authority or ground water(subject to approval from concerned authority) and Storage will be done in under ground water tank.
6Sewer System
Main Sewer line will be construct as per approved drawing and partially lay in basement ceiling and will finally connect to sewer line.
7Drain
NA
8Parks
NA
9Tree Planting
Trees plantation will be done along the boundary walls .
10Design For Electric Supply Including Street Lighting
Electric supply will be provided by GDA/ PVVNL and street light inside project will be installed as per drawing.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Sewer will be treat for recycling (if required) otherwise it will connected to the sewer line of authority which is already connected to central functional STP of GDA for this locality.
13Solid Waste Management And Disposal System
As per sanction of GDA
14Water Conservation System
rain water harvesting system will be develop as per sanction drawing.
15Energy Management System Including Use of Renewable Energy
AS per sanction drawings of GDA
16Fire Protection And Fire Safety System
System will be provided as per the provisional Fire NOC
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
As per guidelines and building by- laws
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

3 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Amit sharmaUPRERAAGT12024
2KULDEEP SANGWANUPRERAAGT11397
3ROHIT KUMAR TIWARIUPRERAAGT11993
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 9 Jan 2024. 1 of them carries a revalidation, valid to 9 Jan 2027.

Sanctioned by Ghaziabad Development Authority · 2,872 sqm of land · an approved plan of 2 blocks and 80 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
07/PMAY GDA/MP/201810 Jan 20199 Jan 20249 Jan 202731 Aug 2022—
07/PMAYGDA/MP/201810 Jan 20199 Jan 20249 Jan 202728 Nov 202410 Jan 2019
valid to 9 Jan 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 28 Nov 2025.

#Granted fromExtended uptoNote
131 Aug 202228 Feb 2023Six months extension in view of force majeure caused by covid-19 pandemic
228 Feb 202328 Nov 2024—
328 Nov 202428 Nov 2025—

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
118016790Khasra
117910Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 173
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 172
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Mar 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New20 Mar 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Mar 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New29 Mar 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Mar 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Mar 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Mar 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Mar 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New19 Apr 2019 ↗

Quarterly progress reports

23 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

23 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q292.77%CA ↗ · Arch ↗ · Eng ↗
2025-Q393.44%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSCC BUILDERS PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM2347
PANAAJCS3238G
CIN / TANU45201DL2005PTC139039
Name of chairmanMR. VIPUL GIRI
Registered address3RD FLOOR H-69, SECTOR-63, NOIDA-201301, GAUTAMBUDH NAGAR ( UP)
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SCC BUILDERS PVT LTDBankPUNJAB AND SIND BANKBranchCORPORATE BANKING BRANCHA/C no.IFSCPSIB0000717
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL

Is SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL RERA registered?

Yes. SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL is registered with UPRERA under registration number UPRERAPRJ171530, registered on 23 Apr 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL been completed?

UPRERA still lists SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL as Registered, so it is not shown as completed here. A completion certificate dated 9 Jul 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL?

SCC BUILDERS PVT. LTD. is the promoter entity that filed SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL with UPRERA (promoter RERA ID UPRERAPRM2347). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL more time to complete?

UPRERA's record carries 3 completion extensions for SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL, the latest running to 28 Nov 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL located?

SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL?

The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL?

The approved unit plan filed with UPRERA runs from 10 to 122 m² of carpet area (about 103 to 1,316 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL?

The approved unit plan describes 2 blocks and 80 units of which 8 are homes and 72 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SCC BLOSSOM (PMAY) COMMERCIAL BLOCK, NURSING HOME AND NURSERY SCHOOL?

About 113 units per acre: 80 planned units across 0.71 acres (2,872 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗