SCC BLOSSOM (PMAY) PH-1 BLOCK X

UPRERARegistered

SCC BLOSSOM (PMAY) PH-1 BLOCK X is a RERA-registered residential project by SCC BUILDERS PVT. LTD. in Ghaziabad (RERA ID UPRERAPRJ735034). Registered with a completion deadline of 27 Aug 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ735034
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start30 May 2019
Project duration51 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address3RD FLOOR H-69, SECTOR-63, NOIDA-201301, GAUTAMBUDH NAGAR ( UP)
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    07/PMAY GDA/MP/2018

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. Completion certificate filed

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered16 Apr 2019
Original completion30 May 2021
Revised completion27 Aug 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary26 May 2026
Registration fee₹23,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors252 · 1 · 11 (units from plan)
ConfigurationUnitsCarpet area
1 BHK25223
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
X · 1 BHK1125223
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANUJ AGARWAL ARCHITECTS
License CA/96/19503
A-244,KAUSHAMBI GHAZIABAD-201010
Engineer
VD SHARMA
B-24, SECTOR 67,NOIDA-201301
Contractor
MAIA CONSTRUCTION PRIVATE LIMITED
H-69 GROUND FLOOR, SECTOR 63, NOIDA
Sr.Development work declared to RERA
1Demarcation of Plots
Marking of Plot Boundary will be as per possession given by previous owner in presence of Tehsil staf
2Boundary Wall
At outer Periphery of Plot & will be constructed in Bricks/ RCC
3Road Work
Trimix / Interlocking Tiles
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
To be Provided by the Ghaziabad Development Authority or ground water(subject to approval from concerned authority) and Storage will be done in under ground water tank.
6Sewer System
Main Sewer line will be construct as per approved drawing and will finally connect to sewer line.
7Drain
NA
8Parks
Will be develop as per sanction drawing
9Tree Planting
Trees plantation will be done along the boundary walls and in park as per authority guidelines
10Design For Electric Supply Including Street Lighting
Electric supply will be provided by GDA/ PVVNL and street light inside housing project will be installed as per drawing.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Sewer will be treat for recycling (if required) otherwise it will connected to the sewer line of authority which is already connected to central functional STP of GDA for this locality.
13Solid Waste Management And Disposal System
As per sanction of GDA
14Water Conservation System
Rain water harvesting system will be develop as per sanction drawing.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
System will be provided as per the provisional Fire NOC
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
As per guidelines and building by- laws
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 9 Jan 2024.

Sanctioned by Ghaziabad Development Authority · 3,522 sqm of land · an approved plan of 1 block and 252 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
07/PMAY GDA/MP/201810 Jan 20199 Jan 20249 Jan 202730 May 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 27 Aug 2023.

#Granted fromExtended uptoNote
130 May 202129 Nov 2021Six months extension in view of force majeure caused by covid-19 pandemic
229 Nov 202128 Nov 2022—
328 Nov 202227 Aug 2023—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
117910Khasra
118016790Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 172
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 173
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New30 Mar 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Mar 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Mar 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New30 Mar 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New30 Mar 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New30 Mar 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 Mar 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Mar 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New3 Apr 2019 ↗

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSCC BUILDERS PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM2347
PANAAJCS3238G
CIN / TANU45201DL2005PTC139039
Name of chairmanMR. VIPUL GIRI
Registered address3RD FLOOR H-69, SECTOR-63, NOIDA-201301, GAUTAMBUDH NAGAR ( UP)
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SCC BUILDERS PVT LTDBankPUNJAB AND SIND BANKBranchP-18/90 CONNAUGHT CIRCUS,NEW DELHIA/C no.IFSCPSIB0000717
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SCC BLOSSOM (PMAY) PH-1 BLOCK X

Is SCC BLOSSOM (PMAY) PH-1 BLOCK X RERA registered?

Yes. SCC BLOSSOM (PMAY) PH-1 BLOCK X is registered with UPRERA under registration number UPRERAPRJ735034, registered on 16 Apr 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has SCC BLOSSOM (PMAY) PH-1 BLOCK X been completed?

UPRERA still lists SCC BLOSSOM (PMAY) PH-1 BLOCK X as Registered, so it is not shown as completed here. A completion certificate dated 26 May 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of SCC BLOSSOM (PMAY) PH-1 BLOCK X?

SCC BUILDERS PVT. LTD. is the promoter entity that filed SCC BLOSSOM (PMAY) PH-1 BLOCK X with UPRERA (promoter RERA ID UPRERAPRM2347). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SCC BLOSSOM (PMAY) PH-1 BLOCK X more time to complete?

UPRERA's record carries 3 completion extensions for SCC BLOSSOM (PMAY) PH-1 BLOCK X, the latest running to 27 Aug 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SCC BLOSSOM (PMAY) PH-1 BLOCK X have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SCC BLOSSOM (PMAY) PH-1 BLOCK X located?

SCC BLOSSOM (PMAY) PH-1 BLOCK X is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in SCC BLOSSOM (PMAY) PH-1 BLOCK X?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in SCC BLOSSOM (PMAY) PH-1 BLOCK X?

The approved unit plan describes 1 block and 252 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SCC BLOSSOM (PMAY) PH-1 BLOCK X?

About 290 units per acre: 252 planned units across 0.87 acres (3,522 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗