SCC Sapphire Ph-II BLOCK - F is a RERA-registered residential project by SHRINE BUILDTECH PVT. LTD. in Ghaziabad (RERA ID UPRERAPRJ4287). Registered with a completion deadline of 29 Jun 2021.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ4287 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Apr 2015 |
| Original start | 1 Apr 2015 |
| Project duration | 75 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | 3RD FLOOR, H-69, SECTOR-63, NOIDA-201301, GAUTAMBUDH NAGAR (U.P.) |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
442/ZONE-1/GH/14-15
Registered with RERA
- valid to
Permit revalidated
110/GMP/GH/Zone-1/17-18
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 31 Dec 2020 |
| Revised completion | 29 Jun 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 9 Jan 2020 |
| Registration fee | ₹20,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK112 64%
- 3 BHK64 36%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 112 | 53 |
| 3 BHK | 64 | 73-106 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK F · 2 BHK, 3 BHK | 16 | 176 | 53-106 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Marking of plot as per site/ Registry |
| 2 | Boundary Wall On the outter periphery of plot as per site. |
| 3 | Road Work Trimix & interlocking tiles. |
| 4 | Footpaths Side pathways designed along the internal roads |
| 5 | Water Supply Including Drinking Water Facilities To be Provide by GDA and Ground Water |
| 6 | Sewer System Main Sewer line has been designed as per norms and partially lay in basement ceiling and will finally connect to STP |
| 7 | Drain Underground pipe drain with chamber |
| 8 | Parks Landscape and Tree Planting has been designed by as per authority guidelines |
| 9 | Tree Planting Tree Planting has been done along the boundary walls and in central park & designed by as per authority guidelines |
| 10 | Design For Electric Supply Including Street Lighting Designed has been done as per UP electricity board guidelines |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewer will be treat for recycling (if required) otherwise it will connected to the sewer line of authority which is already connected to central functional STP of GDA for this localit |
| 13 | Solid Waste Management And Disposal System Door to Door Collection and will be disposed up to garbage point of authority |
| 14 | Water Conservation System Recycling of treated water and rain water syestem to be provide |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System System will be provide as per the fire department guidelines |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services System will be provide as per the guidelines |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 2 Sept 2020. It carries a revalidation, valid to 6 Oct 2022.
Sanctioned by Ghaziabad Development Authority · 2,913 sqm of land · an approved plan of 1 block and 176 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 442/ZONE-1/GH/14-15 | 3 Sept 2015 | 2 Sept 2020 | 5 Oct 2027 | 31 Dec 2020 | 7 Oct 2017 valid to 6 Oct 2022 as 110/GMP/GH/Zone-1/17-18 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 29 Jun 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2020 | 29 Jun 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
22 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1010M | 2913 SQM APX AS PART LAND OF ENTIRE PROJECT LAND | — |
| 1010 | 2913 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 17 Feb 2014.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 2170 | 17 Feb 2014 | self | — |
| Registry document · 2170 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2170 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 14 Oct 2019 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 16 Oct 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 14 Oct 2019 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jan 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 30 Jan 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 30 Jan 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 30 Jan 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 30 Jan 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 30 Jan 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 30 Jan 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | To be provide by GDA / Ground Water |
| Fire safety (as filed with RERA) | As per Fire NOC |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
7 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SHRINE BUILDTECH PVT. LTD. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2783 |
| PAN | AATCS2468N |
| CIN / TAN | U70102DL2013PTC253923 |
| Name of chairman | MR. VIPUL GIRI |
| Registered address | 3RD FLOOR, H-69, SECTOR-63, NOIDA-201301, GAUTAMBUDH NAGAR (U.P.) |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Shrine Buildtech Pvt. Ltd.BankBank of IndiaBranchShahdaraA/C no.IFSCBKID0006015 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 6 (Under Registration - 0 ) → 7 (Under Registration - 1 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 31 Aug 2026 |
Common questions about SCC Sapphire Ph-II BLOCK - F
Is SCC Sapphire Ph-II BLOCK - F RERA registered?
Yes. SCC Sapphire Ph-II BLOCK - F is registered with UPRERA under registration number UPRERAPRJ4287, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has SCC Sapphire Ph-II BLOCK - F been completed?
UPRERA still lists SCC Sapphire Ph-II BLOCK - F as Registered, so it is not shown as completed here. A completion certificate dated 9 Jan 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of SCC Sapphire Ph-II BLOCK - F?
SHRINE BUILDTECH PVT. LTD. is the promoter entity that filed SCC Sapphire Ph-II BLOCK - F with UPRERA (promoter RERA ID UPRERAPRM2783). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted SCC Sapphire Ph-II BLOCK - F more time to complete?
UPRERA's record carries 1 completion extension for SCC Sapphire Ph-II BLOCK - F, the latest running to 29 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SCC Sapphire Ph-II BLOCK - F have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SCC Sapphire Ph-II BLOCK - F located?
SCC Sapphire Ph-II BLOCK - F is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in SCC Sapphire Ph-II BLOCK - F?
The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SCC Sapphire Ph-II BLOCK - F?
The approved unit plan filed with UPRERA runs from 53 to 106 m² of carpet area (about 572 to 1,145 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SCC Sapphire Ph-II BLOCK - F?
The approved unit plan describes 1 block and 176 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SCC Sapphire Ph-II BLOCK - F?
About 245 units per acre: 176 planned units across 0.72 acres (2,913 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗