SCC SAPPHIRE PHASE-I BLOCK B,C,D & E

UPRERARegistered

SCC SAPPHIRE PHASE-I BLOCK B,C,D & E is a RERA-registered residential project by SCC BUILDERS PVT. LTD. in Ghaziabad (RERA ID UPRERAPRJ4253). Registered with a completion deadline of 31 Dec 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ4253
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Jul 2012
Original start1 Jul 2012
Project duration78 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address3RD FLOOR H-69, SECTOR-63, NOIDA-201301, GAUTAMBUDH NAGAR ( UP)
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Permit revalidated (2)

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion31 Dec 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary2 Apr 2019
Registration fee₹62,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors560 · 4 · 14 (units from plan)
  • 2 BHK420 75%
  • 3 BHK140 25%
ConfigurationUnitsCarpet area
3 BHK14063-83
2 BHK42041-51
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block B · 3 BHK1414063-83
Block C · 2 BHK1415446
Block D · 2 BHK1412641
Block E · 2 BHK1414051
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANUJ AGARWAL
License CA/96/19503
A-244. KAUSHAMBI, GHAZIABAD
Engineer
SADANAND OJHA
503, SACHDEVA CORPORATE TOWER, PLOT NO.8, COMMUNITY CENTRE, SEC-8, ROHINI, DELHI-110085
Contractor
BSAG INFRA ENGINNERING PVT. LTD.
UGF-22, 653/1, ONE MALL, SHAKTI KHAND-III, INDIRAPURAM , GHAZIABAD
Sr.Development work declared to RERA
1Demarcation of Plots
Marking of plot boundary as per site/Registry
2Boundary Wall
At outter periphery of plot & its constructed in bricks & RCC
3Road Work
Trimix & interlocking tiles
4Footpaths
Side walking pathways along the roads
5Water Supply Including Drinking Water Facilities
Ground Water or To be Provided by the Ghaziabad Development Authority and Storage will be done in under ground water tank.
6Sewer System
Main Sewer line has been designed as per norms and partially lay in basement ceiling and will finally connect to STP
7Drain
Underground pipe drain with chamber
8Parks
Landscape and has been designed by as per authority guidelines
9Tree Planting
Trees plantation have been along the boundary walls and in central park as per authority
10Design For Electric Supply Including Street Lighting
Designed has been done as per UP electricity board guidelines
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Sewer will be treat for recycling (if required) otherwise it will connected to the sewer line of authority which is already connected to central functional STP of GDA for this locality.
13Solid Waste Management And Disposal System
Door to Door Collection and will be disposed up to garbage point of authority
14Water Conservation System
Recycling of treated water and rain water syestem to be provide
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
System will be provide as per the fire department guidelines
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
As per guidelines and building bye laws
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 2 Sept 2020. All 2 carry a revalidation, the latest valid to 6 Oct 2022.

Sanctioned by Ghaziabad Development Authority · 11,348 sqm of land · an approved plan of 4 blocks and 560 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
442/ZONE-1/GH/14-153 Sept 20152 Sept 20206 Oct 202231 Dec 20187 Oct 2017
valid to 6 Oct 2022
as 110/GMP/GH/ZONE-1/17-18
442/ZONE-1/GH/14-153 Sept 20152 Sept 20206 Oct 202231 Dec 20187 Oct 2017
valid to 6 Oct 2022
as 110/GMP/GH/ZONE-1/17-18
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗

Land & documents

30 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
10102489Khasra
10101924Khasra
10101860Khasra
10115560Khasra
10125320Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 7934
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11712
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10317
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11278
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New17 May 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New15 Mar 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New15 Mar 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old30 Jan 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old30 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jan 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old30 Jan 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old30 Jan 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old30 Jan 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old30 Jan 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterTO BE PROVIDED BY GDA
Fire safety (as filed with RERA)AS PER FIRE NOC
Renewable energyNOT AVAILABLE
Other facilitiesNOT AVAILABLE

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSCC BUILDERS PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM2347
PANAAJCS3238G
CIN / TANU45201DL2005PTC139039
Name of chairmanMR. VIPUL GIRI
Registered address3RD FLOOR H-69, SECTOR-63, NOIDA-201301, GAUTAMBUDH NAGAR ( UP)
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SCC BUILDERS PVT. LTD.BankYES BANK LTDBranchDLF CYBER CITY BRANCHA/C no.IFSCYESB0000172
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about SCC SAPPHIRE PHASE-I BLOCK B,C,D & E

Is SCC SAPPHIRE PHASE-I BLOCK B,C,D & E RERA registered?

Yes. SCC SAPPHIRE PHASE-I BLOCK B,C,D & E is registered with UPRERA under registration number UPRERAPRJ4253, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has SCC SAPPHIRE PHASE-I BLOCK B,C,D & E been completed?

UPRERA still lists SCC SAPPHIRE PHASE-I BLOCK B,C,D & E as Registered, so it is not shown as completed here. A completion certificate dated 2 Apr 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of SCC SAPPHIRE PHASE-I BLOCK B,C,D & E?

SCC BUILDERS PVT. LTD. is the promoter entity that filed SCC SAPPHIRE PHASE-I BLOCK B,C,D & E with UPRERA (promoter RERA ID UPRERAPRM2347). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SCC SAPPHIRE PHASE-I BLOCK B,C,D & E have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SCC SAPPHIRE PHASE-I BLOCK B,C,D & E located?

SCC SAPPHIRE PHASE-I BLOCK B,C,D & E is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in SCC SAPPHIRE PHASE-I BLOCK B,C,D & E?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SCC SAPPHIRE PHASE-I BLOCK B,C,D & E?

The approved unit plan filed with UPRERA runs from 41 to 83 m² of carpet area (about 444 to 889 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SCC SAPPHIRE PHASE-I BLOCK B,C,D & E?

The approved unit plan describes 4 blocks and 560 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SCC SAPPHIRE PHASE-I BLOCK B,C,D & E?

About 200 units per acre: 560 planned units across 2.80 acres (11,348 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗