SHREEVINAYAKAM GOPAL KUNJ is a RERA-registered residential project by SRV PROMOTERS in Varanasi (RERA ID UPRERAPRJ105792). Registered with a completion deadline of 16 Jul 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ105792 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Varanasi Development Authority |
| Proposed start | 8 Sept 2020 |
| Project duration | 59 months |
| Address | Varanasi, Varanasi |
| Tehsil | Varanasi |
| Applicant type | Partnership Firm |
| Applicant address | B-38/47-K-8-H, Gokul Nagar Colony, Mahmoorganj, Varanasi-221010 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
MAP20191109190744763
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Aug 2020 |
| Original completion | 16 Jul 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹16,000 |
| Sanctioning authority | Varanasi Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | — | 486-629 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 · 2 BHK | 7 | — | 486-629 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots To the North 25.372040 to the West 82.993403 to the South 25.371839 to the East 82.994070 |
| 2 | Boundary Wall 125 MM Brick work with RCC Frame |
| 3 | Road Work Pcc base with cement concrete pavement around the building. |
| 4 | Footpaths 6 mtr wide paved road around the building will be available. |
| 5 | Water Supply Including Drinking Water Facilities Two numbers borewell with overhead tanks. We will be providing fresh water supply and tank water supply in all flats through the overhead tanks. |
| 6 | Sewer System In future Sewer system will be available in the road by Nigam and we will be connecting our all sewerage or drain water in this available sewer. The development work of road and sewer are in the plan of Nigam. |
| 7 | Drain Drain water along with boundary wall and will be attached in rain water harvesting system. |
| 8 | Parks Not Available |
| 9 | Tree Planting We will be planting 12 trees around the campus along the boundary wall. |
| 10 | Design For Electric Supply Including Street Lighting Street light shall be providing and electric will be supply through separate electrical transformer. |
| 11 | Community Buildings Not Available |
| 12 | Treatment and Disposal System of Sewage and Sullage water We will be make 40 thousand liter storage capacity filter tank and the solid water will be attached from this tank after filter the rest filter water will be attached in the available sewage system in the main road. |
| 13 | Solid Waste Management And Disposal System We will be make 4 thousand cubic meter storage capacity filter tank and the solid water will be attached from this tank after filter the rest filter water will be attached in the available sewage system in the main road. |
| 14 | Water Conservation System Rain water harvesting system will be available. |
| 15 | Energy Management System Including Use of Renewable Energy Solar panels on terrace will be available. |
| 16 | Fire Protection And Fire Safety System Entire system shall be provided as per fire NOC. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Shop and Society hall will be available. |
| 18 | Emergency Evacuation Services Fire stair will be available in building for emergency exit. |
| 19 | Other Miscellaneous Work Two six passenger lifts, Machine room for those lifts, for supply of water in flats and campus, from overhead water tank, entry gate, provision
of security system with CCTV camera and others essential services will be available in building. |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Surya Prakash Dubey | UPRERAAGT18991 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 16 Jul 2025.
Sanctioned by Varanasi Development Authority · 2,153 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MAP20191109190744763 | 17 Jul 2020 | 16 Jul 2025 | 16 Jul 2028 | 16 Jul 2025 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| ARAZI NO.171/7 SOYEPUR AND ARAZI NO. 7 HASIMPUR | 2153 | Khasra |
| Registry document · 8719 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8745 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8731 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Lease deed · 8971 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Khatauni extract · 1422-1427 & 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 11 Aug 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 20 Jul 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 20 Jul 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 23 Jul 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 13 Aug 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 13 Aug 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 13 Aug 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Jul 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 11 Aug 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Aug 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Aug 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 5 Aug 2020 ↗ |
Quarterly progress reports
21 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
21 quarterly progress reports are on file with UPRERA, covering 2020-Q2 to 2025-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 98.45% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SRV PROMOTERS |
| Role | Promoter · current |
| RERA ID | UPRERAPRM117556 |
| PAN | ADTFS5468E |
| CIN / TAN | ALDS08204A |
| Registered address | B-38/47-K-8-H, Gokul Nagar Colony, Mahmoorganj, Varanasi-221010 |
| RERA contact | |
| Registered since | 2020 |
| Legal name | SANTOSH KUMAR GUPTA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | C 7/10, Gopal Nilayam, Senpura Chetgunj, Varanasi - 221001, Uttar Pradesh |
| RERA contact |
Nearby projects
Varanasi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | SRV PROMOTERSBankBANK OF MAHARASHTRABranchSIGRAA/C no.IFSCMAHB0001290 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about SHREEVINAYAKAM GOPAL KUNJ
Is SHREEVINAYAKAM GOPAL KUNJ RERA registered?
Yes. SHREEVINAYAKAM GOPAL KUNJ is registered with UPRERA under registration number UPRERAPRJ105792, registered on 31 Aug 2020. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SHREEVINAYAKAM GOPAL KUNJ?
The completion date filed with UPRERA is 16 Jul 2025. No completion certificate is on record yet.
Who is the builder of SHREEVINAYAKAM GOPAL KUNJ?
SRV PROMOTERS is the promoter entity that filed SHREEVINAYAKAM GOPAL KUNJ with UPRERA (promoter RERA ID UPRERAPRM117556). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does SHREEVINAYAKAM GOPAL KUNJ have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SHREEVINAYAKAM GOPAL KUNJ located?
SHREEVINAYAKAM GOPAL KUNJ is registered in Varanasi, as filed with UPRERA.
What configurations are available in SHREEVINAYAKAM GOPAL KUNJ?
The unit plan filed with UPRERA lists 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SHREEVINAYAKAM GOPAL KUNJ?
The approved unit plan filed with UPRERA runs from 486 to 629 m² of carpet area (about 5,231 to 6,769 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗