SHRI RADHA GULMOHAR-4 is a RERA-registered residential project by SJP Global Ltd. in Mathura (RERA ID UPRERAPRJ941944). Registered with a completion deadline of 2 Nov 2026.
RERA status as reported: Registered.Construction progress
Construction stayed at 95% across 4 consecutive filed quarters (Jul–Sep 2025 to Apr–Jun 2026). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ941944 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Mathura-Vrindavan Development Authority |
| Proposed start | 3 Nov 2021 |
| Project duration | 60 months |
| Address | Mathura, Mathura |
| Tehsil | Mathura |
| Applicant type | Company |
| Applicant address | 111, Shri Jamuna Dham, Goverdhan Road, Mathura - 281004 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
294/2020-21
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 Nov 2021 |
| Original completion | 2 Nov 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹5,01,500 |
| Sanctioning authority | Mathura-Vrindavan Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of plot line with RCC muddy on all four corner of plots. |
| 2 | Boundary Wall Wall in brick massonary with FPS bricks of class designation 75 in ratio of 1/6 cement mortar. |
| 3 | Road Work Laying of Roads with proper longitudinal and cross sectional roads slopes over well compacted subgrade with 75 mm or more layers of GSB as per requirements. |
| 4 | Footpaths Laying of Interlocking pavers of 40 mm over well compacted subgrade with GSB layers. |
| 5 | Water Supply Including Drinking Water Facilities Fresh water supply line from underground tank to individual plots with proper valves as per MEP drawings. |
| 6 | Sewer System Laying of DWC Pipes and making of circular manholes of required size eg. (600/600 mm) in brick massonery with manhole covers as per MEP design. |
| 7 | Drain Laying of DWC Pipes and making of catch basins of required size eg. (450/450 mm) in brick massonery with manhole covers s per MEP designs. |
| 8 | Parks Landscaping of Parks with plantation including trees, Shrubs and ground covers and recreational areas with benches, walkways etc. |
| 9 | Tree Planting Plantation of various types of trees as per landscape consultant drawing eg. (Champa, Date Palm etc.) |
| 10 | Design For Electric Supply Including Street Lighting Laying of overhead HT and LT cables from main electricity board connection to transformers and up to plots for individual connections (Which shall be directly obtained by the plot owners from electricity board) along with fixing street lights with provision of required capacity transformers as per UPPCL Guidelines. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Construction of STP Collection Tank along with modular treatment system and laying of DWC pipes from STP to individual plots as per MEP drawings. Treated water to be used for irrigation. |
| 13 | Solid Waste Management And Disposal System Designated area for collection and loading of Garbage with dustbins has been provided. |
| 14 | Water Conservation System Installation of Rain Water Harvesting System for percolation of rain water to maintain the local ground water levels as per approved norms and MEP drawings. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 2 Nov 2026.
Sanctioned by Mathura-Vrindavan Development Authority · 99,236 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 294/2020-21 | 3 Nov 2021 | 2 Nov 2026 | 1 Nov 2029 | 2 Nov 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
70 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 78 | 35 | Khasra |
| 79 | 40 | Khasra |
| 85 | 70 | Khasra |
| 89 | 1627.94 | Khasra |
| 98 | 851.49 | Khasra |
| 99 | 500 | Khasra |
| 100 | 500 | Khasra |
| 101 | 500 | Khasra |
| 102 | 500 | Khasra |
| 103 | 2000 | Khasra |
| 104 | 6310 | Khasra |
| 105 | 6350 | Khasra |
| 106 | 2891 | Khasra |
| 107 | 1069 | Khasra |
| 108 | 68 | Khasra |
| 109 | 700 | Khasra |
| 111 | 1380 | Khasra |
| 112 | 1710 | Khasra |
| 113 | 1720 | Khasra |
| 114 | 150 | Khasra |
| 114 | 250 | Khasra |
| 114/1090 | 80 | Khasra |
| 114/1090 | 90 | Khasra |
| 115 | 1820 | Khasra |
| 116 | 1820 | Khasra |
| 117 | 4095 | Khasra |
| 124 | 410 | Khasra |
| 125 | 579 | Khasra |
| 126 | 582 | Khasra |
| 127 | 193 | Khasra |
| 128 | 905 | Khasra |
| 129 | 9600 | Khasra |
| 130 | 144 | Khasra |
| 131 | 606 | Khasra |
| 132 | 11283 | Khasra |
| 139 | 2373 | Khasra |
| 140 | 3318 | Khasra |
| 141 | 1140 | Khasra |
| 142 | 1540 | Khasra |
| 142 | 200 | Khasra |
| 143 | 2300 | Khasra |
| 144 | 6130 | Khasra |
| 145 | 3250 | Khasra |
| 146 | 2800 | Khasra |
| 147 | 120 | Khasra |
| 147 | 110 | Khasra |
| 148 | 1300 | Khasra |
| 150 | 1030 | Khasra |
| 151 | 1600 | Khasra |
| 152 | 2090 | Khasra |
| 153 | 2930 | Khasra |
| 156 | 1560 | Khasra |
| 160 | 80 | Khasra |
| 245 | 660 | Khasra |
| 246 | 20 | Khasra |
| 149 | 550 | Khasra |
| 155 | 2705.36 | Khasra |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1412-1417 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 3045 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3044 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 455 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11866 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10832 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15000 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2835 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11634 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13209 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13210 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2120 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14564 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14521 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14363 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11590 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2093 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14362 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 17006 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 17098 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8546 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11012 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2834 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14660 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3006 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10889 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12832 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3869 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11386 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9847 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12133 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4456 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2367 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2763 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11358 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14662 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2767 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · 02/2011-12 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 29/2010-11 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · MOA & AOA The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · DEED The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · RESOLUTION-NEERAJ JI The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · AFFIDAVIT-KS The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · AFFFIDAVIT The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · AFFIDAVIT FOR NEW PROJECT The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · NON ENCUMBRANCE REPORT The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · DEMARCATED MAP The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · AFFIDAVIT FOR SUBMISSION OF BS The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · land details The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 Nov 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 10 Nov 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 10 Nov 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 10 Nov 2021 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 10 Nov 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 10 Nov 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 10 Nov 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 10 Nov 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 10 Nov 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 Nov 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 10 Nov 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Nov 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Nov 2021 ↗ |
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SJP Global Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM13959 |
| PAN | AAOCS1715M |
| CIN / TAN | AGRS14492C |
| Name of chairman | Ram Agrawal |
| Registered address | 111, Shri Jamuna Dham, Goverdhan Road, Mathura - 281004 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Mathura
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SJP GLOBAL LIMITED-COLLECTION ACCOUNT-SHRI RADHA GULMOHAR-4BankHDFCBranchOPP. BSA COLLAGE, MATHURABranch addressOPP. BSA COLLAGE , MATHURABranch districtMathuraA/C no.IFSCHDFC0000268 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SJP GLOBAL LIMITED-SEPERATE ACCOUNT-SHRI RADHA GULMOHAR-4BankHDFCBranchOPP. BSA COLLAGE, MATHURABranch addressOPP. BSA COLLAGE, MATHURABranch districtMathuraA/C no.IFSCHDFC0000268 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SJP GLOBAL LIMITED- TRANSACTION ACCOUNT-SHRI RADHA GULMOHAR-4BankHDFCBranchOPP. BSA COLLAGE, MATHURABranch addressOPP. BSA COLLAGE, MATHURABranch districtMathuraA/C no.IFSCHDFC0000268 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about SHRI RADHA GULMOHAR-4
Is SHRI RADHA GULMOHAR-4 RERA registered?
Yes. SHRI RADHA GULMOHAR-4 is registered with UPRERA under registration number UPRERAPRJ941944, registered on 25 Nov 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SHRI RADHA GULMOHAR-4?
The completion date filed with UPRERA is 2 Nov 2026. No completion certificate is on record yet.
Who is the builder of SHRI RADHA GULMOHAR-4?
SJP Global Ltd. is the promoter entity that filed SHRI RADHA GULMOHAR-4 with UPRERA (promoter RERA ID UPRERAPRM13959). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does SHRI RADHA GULMOHAR-4 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SHRI RADHA GULMOHAR-4 located?
SHRI RADHA GULMOHAR-4 is registered in Mathura, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗