SHRI RADHA GULMOHAR-5 is a RERA-registered residential project by SJP Global Ltd. in Satoha Asgarpur, Mathura (RERA ID UPRERAPRJ320011). Registered with a completion deadline of 13 Sept 2028.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ320011 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Mathura-Vrindavan Development Authority |
| Proposed start | 15 Sept 2023 |
| Project duration | 60 months |
| Address | Mauza- Satoha Asgarpur, Goverdhan Road, Satoha Asgarpur, Mathura, Mathura |
| Tehsil | Mathura |
| Applicant type | Company |
| Applicant address | 111, Shri Jamuna Dham, Goverdhan Road, Mathura - 281004 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
MVDA/LD/22-23/0562
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 27 Jan 2024 |
| Original completion | 13 Sept 2028 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹85,500 |
| Sanctioning authority | Mathura-Vrindavan Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of plot line with RCC muddy on all four corner of plots. |
| 2 | Boundary Wall Wall in brick massonary with Fps bricks of class designation 75 in ration of 16 cement mortar |
| 3 | Road Work Laying of roads with proper longitudinal and cross-sectional road slopes over well compacted subgrade with 75 mm or more layers of GSB as per requirement. |
| 4 | Footpaths Laying of Interlocking Pavers of 40 mm over well compacted subgrade with GSB layers. |
| 5 | Water Supply Including Drinking Water Facilities Fresh Water Supply line from undeground Tank to Individual plots with Proper Valves as per MEP drawings. |
| 6 | Sewer System Laying of DWC pipes and making of circular manholes of required size eg. (600x600mm) in brick massonery with manhole covers as per MEP design |
| 7 | Drain Laying of DWC Pipes and making of catch basins of required size eg. (450x450mm) in brick massonery with manhole covers as per MEP design |
| 8 | Parks Landscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, walkways etc |
| 9 | Tree Planting planatation of various types of trees as per Landscape consultant drawings eg. (Champa, Date Plam etc) |
| 10 | Design For Electric Supply Including Street Lighting Laying of overhead HT and LT cables from Main electricity board connection to transformers and upto plots for individual connections (which shall be be directly obtained by the plot owners from the electricity board) along with fixing street lights with provision of required capacity trasformers as per UPPCL Guidelines |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Constructin of STP collection tank along with modular treatment system and laying of DWC pipes from STP to individual plots as per MEP drawings. Treated water to be used for irrigation. |
| 13 | Solid Waste Management And Disposal System Designated area for collection and loading of garbage with dustbins has been provided |
| 14 | Water Conservation System Installation of Rain Water harvesting system for percolatin of rainwater to maintain the local ground water levels as per approved norms and MEP drawings. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 13 Sept 2028.
Sanctioned by Mathura-Vrindavan Development Authority · 16,015 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MVDA/LD/22-23/0562 | 14 Sept 2023 | 13 Sept 2028 | 12 Sept 2031 | 13 Sept 2028 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
24 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 89 | 4222 | Khasra |
| 109 | 1841.55 | Khasra |
| 85 | 270.14 | Khasra |
| 91 | 2050 | Khasra |
| 107 | 3861 | Khasra |
| 98 | 259 | Khasra |
| 106 | 3419 | Khasra |
| 108 | 92 | Khasra |
| Allotment letter from the authority · 02/2011-12 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · 2834 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2834 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11012 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14660 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · NA The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · NA The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · NA The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · REGISTERED DEED The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · 455 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Allotment letter from the authority · 24066 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · U70102UP2010PLC040335 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 4 Oct 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 4 Oct 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 4 Oct 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Oct 2023 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 4 Oct 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Oct 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Oct 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 16 Oct 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Oct 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 4 Oct 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 4 Oct 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 4 Oct 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 4 Oct 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 17 Oct 2023 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 67% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 82% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 80% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 84% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SJP Global Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM13959 |
| PAN | AAOCS1715M |
| CIN / TAN | AGRS14492C |
| Name of chairman | Ram Agrawal |
| Registered address | 111, Shri Jamuna Dham, Goverdhan Road, Mathura - 281004 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | NEERAJ SHARMA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | B-64 GEETA ENCLAVE KRISHNA NAGAR MATHURA |
| RERA contact |
| Legal name | PRATAP SINGH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | A-5-6 MOTI KUNJ EXT. MATHURA |
| RERA contact |
Nearby projects
Mathura
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SJP GLOBAL LIMITED COLLECTION ACCOUNT FOR SHRI RADHA GULMOHAR-5BankHDFC BANKBranchOPP BSA COLLAGE, MATHURABranch addressOPP BSA COLLAGE, MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCHDFC0000268 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SJP GLOBAL LIMITED SEPERATE ACCOUNT FOR SHRI RADHA GULMOHAR-5BankHDFC BANKBranchOPP BSA COLLAGE, MATHURABranch addressOPP BSA COLLAGE, MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCHDFC0000268 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SJP GLOBAL LIMITED RERA TRANSACTION ACCOUNT FOR SHRI RADHA GULMOHAR-5BankHDFC BANKBranchOPP BSA COLLAGE, MATHURABranch addressOPP BSA COLLAGE, MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCHDFC0000268 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about SHRI RADHA GULMOHAR-5
Is SHRI RADHA GULMOHAR-5 RERA registered?
Yes. SHRI RADHA GULMOHAR-5 is registered with UPRERA under registration number UPRERAPRJ320011, registered on 27 Jan 2024. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SHRI RADHA GULMOHAR-5?
The completion date filed with UPRERA is 13 Sept 2028. No completion certificate is on record yet.
Who is the builder of SHRI RADHA GULMOHAR-5?
SJP Global Ltd. is the promoter entity that filed SHRI RADHA GULMOHAR-5 with UPRERA (promoter RERA ID UPRERAPRM13959). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does SHRI RADHA GULMOHAR-5 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SHRI RADHA GULMOHAR-5 located?
SHRI RADHA GULMOHAR-5 is registered in Satoha Asgarpur, Mathura, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗