SIKKA KANNAN GREENS is a RERA-registered residential project by SIKKA DEVELOPERS PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ12294). Registered with a completion deadline of 15 May 2029.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ12294 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 26 Aug 2017 |
| Project duration | 141 months |
| Address | Modinagar, Ghaziabad |
| Tehsil | Modinagar |
| Applicant type | Company |
| Applicant address | S-565, SCHOOL BLOCK, SHAKARPUR, EAST DELHI, DELHI-110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Permit revalidated (3)
Building permit sanctioned
1249/MASTER PLAN ZONE 2/16
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Permit revalidated (2)
2 building permits sanctioned
- to
Extension granted
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Sept 2017 |
| Original completion | 31 Aug 2022 |
| Revised completion | 15 May 2029 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 12 Jan 2026 |
| Registration fee | ₹1,16,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK600 68%
- 3 BHK156 18%
- STUDIO63 7%
- SHOP62 7%
- OTHER3 <1%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 600 | 48-49 |
| SHOP | 62 | 6-29 |
| STUDIO | 63 | 24-35 |
| OTHER | 3 | 283 |
| 3 BHK | 156 | 59-61 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK-I (COMMERCIAL) · SHOP, STUDIO, OTHER | 14 | 106 | 9-35 |
| Block-1 Part-E (Formerly SUTLEJ) · SHOP, 3 BHK | 14 | 100 | 6-61 |
| Block-1 Part-F (Formerly Gomti) · 2 BHK, OTHER | 13 | 96 | 49 |
| Block-1 Part-G (Formerly Alaknanda) · 2 BHK, OTHER | 12 | 88 | 49-49 |
| Block-1 Part-H (Formerly Sarayu) · 2 BHK, OTHER | 12 | 88 | 49-49 |
| Block-A(Formerly Ganga) · 2 BHK, OTHER | 15 | 112 | 48-48 |
| Block-B(Formerly YAMUNA) · 2 BHK, OTHER | 15 | 112 | 48-48 |
| Block-C(Formerly SARASWATI) · 2 BHK, OTHER | 14 | 104 | 48-48 |
| Block-D · 3 BHK, OTHER | 14 | 78 | 59-61 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Site Co-ordinates marked in demarcation plan. |
| 2 | Boundary Wall Structure comprising of RCC & Brick masonary. |
| 3 | Road Work Cement Concrete Internal Road (CC Road Above the 2 Corse of WBM) and Foothpaths in Interlocking Pavers |
| 4 | Footpaths Cement Concrete Internal Road (CC Road Above the 2 Corse of WBM) and Foothpaths in Interlocking Pavers |
| 5 | Water Supply Including Drinking Water Facilities Water supply to be Provided by the GDA and developer will make UGT of capacity as per norms. |
| 6 | Sewer System Main Sewer line has been designed as per norms and partially lay in basement ceiling and will finally connect to STP |
| 7 | Drain Underground system using uPVC (SN-4) & masonary chamber_s sewer pipes. |
| 8 | Parks Landscape and Tree Planting has been designed by as per authority guidelines |
| 9 | Tree Planting Landscape and Tree Planting has been designed by as per authority guidelines |
| 10 | Design For Electric Supply Including Street Lighting Designed has been done as per UP electricity board guidelines and shall be provided necessary switch- gear etc. for distributing electricity at LT voltage. |
| 11 | Community Buildings Club has been designed as per authority norms and Facilities Like:- Multi-purpose Hall, Gaming Zone, Entertainment Area etc. |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP of capacity as per norms shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer. |
| 13 | Solid Waste Management And Disposal System Door to Door Collection and will be disposed up to garbage point of authority |
| 14 | Water Conservation System Recycling of treated water and rain water harvesting system to be provided. |
| 15 | Energy Management System Including Use of Renewable Energy Multiple point metering will be there for energy purchased from the grid/ power supply company. Solar hot water system proposed as per norms at suitable place. |
| 16 | Fire Protection And Fire Safety System Fire tender path shall be provided as per NBC. Fire Fighting systems along with pumps and water storage tanks shall be provided as per NBC & NOC from fire department. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Nursery school has been proposed as per norms. |
| 18 | Emergency Evacuation Services Staircases shall be provided in basement & all the towers for fire/ Emergency exits as per norms. |
| 19 | Other Miscellaneous Work N.A. |
Registered agents
2 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
| 2 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
Permits & extensions
5 permits
An approval and the date it runs to - not proof the work matching it was done.
5 sanctioning permits are on record with UPRERA, the latest valid to 15 May 2029. All 5 carry a revalidation, the latest valid to 15 May 2029.
Sanctioned by Ghaziabad Development Authority · 22,154 sqm of land · an approved plan of 9 blocks and 884 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 1249/MASTER PLAN ZONE 2/16 | 3 Sept 2016 | 2 Sept 2021 | 11 Sept 2023 | 31 Aug 2022 | 12 Sept 2018 valid to 11 Sept 2023 as 14/MASTER PLAN ZONE 2/18 | |
| 1249/MASTER PLAN ZONE 2/16 | 3 Sept 2016 | 2 Sept 2021 | 11 Sept 2023 | 31 Aug 2022 | 12 Sept 2018 valid to 11 Sept 2023 as 14/MASTER PLAN ZONE 2/18 | |
| 1249/MASTER PLAN ZONE 2/16 | 12 Sept 2018 | 11 Sept 2023 | 11 Sept 2026 | 28 Feb 2023 | 12 Sept 2018 | |
| Group Housing/06290/GDA/BP/23-24/1338/23012024 | 16 May 2024 | 15 May 2029 | 15 May 2032 | 27 Nov 2024 | 16 May 2024 valid to 15 May 2029 | |
| Group Housing/06290/GDA/BP/23-24/1338/23012024 | 16 May 2024 | 15 May 2029 | 15 May 2032 | 15 May 2029 | 16 May 2024 valid to 15 May 2029 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 15 May 2029.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Aug 2022 | 28 Feb 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 28 Feb 2023 | 27 Nov 2024 | — |
| 3 | 27 Nov 2024 | 15 May 2029 | — |
Land & documents
10 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 321,322,324,324,329,330 VILLAGE SADABAD:KHNO-679 , | 22154 | — |
| 321,322,324,324,329,330 VILLAGE SADABAD:KHNO-679 | 22154 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 5 Jul 2016.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 7767 | 5 Jul 2016 | self | — |
| Registry document · 5693 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5226 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5226 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9876 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9822 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2525 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2591 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5788 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5790 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2592 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9422 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9421 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 858 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 344 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 857 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 345 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9875 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5789 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2059 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 2525 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 857 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 857 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 345 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9421 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9822 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5790 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 344 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2059 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5788 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5226 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2591 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2592 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5789 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 5693 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9876 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9875 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 858 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9422 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 2345 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2346 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2349 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2350 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 10 Feb 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 10 Feb 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 Feb 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 10 Feb 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Feb 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Feb 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 25 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | WTP PROVIDED |
| Fire safety (as filed with RERA) | AS PER PART IV NBC OF INDIA |
| Health service | STP RWH DUAL PLUMBING SYSTEM PROVIDED |
| Renewable energy | PROVISION OF SOLAR WATER HEATER PROVIDED |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 23.33% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 24.37% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 25.02% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 25.47% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 27.98% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 28.74% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SIKKA DEVELOPERS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM9073 |
| PAN | AATCS4318K |
| CIN / TAN | U70102DL2013PTC255956 |
| Name of chairman | RAVINDRA KUMAR GARG |
| Registered address | S-565, SCHOOL BLOCK, SHAKARPUR, EAST DELHI, DELHI-110092 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SIKKA DEVELOPEERS P LTD COLLECTION AC SKGBankHDFC BANKBranchRDC GHAZIABADBranch addressD-44 RDC RAJNAGAR GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000153Branch emailNimesh.Singhal{at}hdfcbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SIKKA DEVELOPERS P LTD SEPERATE A/C SKGBankHDFC BANKBranchRDC GHAZIABADBranch addressD44, RDC, RAJNAGAR, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000153Branch emailNimesh.Singhal{at}hdfcbank.com |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SIKKA DEVELOPERS P LTD RERA TXN A/C SKGBankHDFC BANKBranchRDS GHAZIABADBranch addressD-44 RDS RAJNAGAR GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000153Branch emailNimesh.Singhal{at}hdfcbank.com |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 20 (Under Registration - 1 ) → 20 (Under Registration - 0 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 29 Sept 2026 |
Common questions about SIKKA KANNAN GREENS
Is SIKKA KANNAN GREENS RERA registered?
Yes. SIKKA KANNAN GREENS is registered with UPRERA under registration number UPRERAPRJ12294, registered on 1 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has SIKKA KANNAN GREENS been completed?
UPRERA still lists SIKKA KANNAN GREENS as Registered, so it is not shown as completed here. A completion certificate dated 12 Jan 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of SIKKA KANNAN GREENS?
SIKKA DEVELOPERS PRIVATE LIMITED is the promoter entity that filed SIKKA KANNAN GREENS with UPRERA (promoter RERA ID UPRERAPRM9073). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted SIKKA KANNAN GREENS more time to complete?
UPRERA's record carries 3 completion extensions for SIKKA KANNAN GREENS, the latest running to 15 May 2029. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SIKKA KANNAN GREENS have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SIKKA KANNAN GREENS located?
SIKKA KANNAN GREENS is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in SIKKA KANNAN GREENS?
The unit plan filed with UPRERA lists 2 BHK, SHOP, STUDIO, OTHER and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SIKKA KANNAN GREENS?
The approved unit plan filed with UPRERA runs from 6 to 283 m² of carpet area (about 64 to 3,047 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SIKKA KANNAN GREENS?
The approved unit plan describes 9 blocks and 884 units of which 822 are homes and 62 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SIKKA KANNAN GREENS?
About 161 units per acre: 884 planned units across 5.47 acres (22,154 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗