SIYA COMPLEX

UPRERARegistered

SIYA COMPLEX is a RERA-registered commercial project by Bhadohi Industrial Development Authority in Rajpura (RERA ID UPRERAPRJ809405). Registered with a completion deadline of 20 Dec 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ809405
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Jan 2025
Project duration60 months
AddressKhasra No. 93 Mi Rajpura Housing Scheme Phase 2 Bhadohi, Rajpura, Bhadohi
TehsilBhadohi
Applicant typeCompetent authority
Applicant addressBIDA Bhawan, Near Rajpura Bypass Chauraha, Aurai Road Bhadohi 221401
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    13612

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered24 Feb 2026
Original completion20 Dec 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹59,000
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 1 · 4 (from plan)
ConfigurationUnitsCarpet area
SHOP—1,053-1,273
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
0 · SHOP4—1,053-1,273
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
KISHORE KAPOOR
License CA/87/10966
Flat no. 3, Block 2, Rajshree apartments, Siddhgiribagh, Varanasi
Engineer
Ram Darash Bharti
BIDA Bhawan Rjpura Road Bhadohi -221401
Contractor
RKD Aluminium Peopels
Khemapur Gorai District Varanashi
Sr.Development work declared to RERA
1Demarcation of Plots
Plot is already demarcated. all the development and construction work will be done under the demarcated plot.
2Boundary Wall
N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).
3Road Work
Siya Complex is Located in an already developed Scheme in which North Side 12.00 M Wide Bituminious Road and East Side and South side 09.00 M wide Road around the building .
4Footpaths
A footpath with a PCC base and 20 mm thick Chequered paver blocks shall be provided as per the drawings.
5Water Supply Including Drinking Water Facilities
The water supply system for the building shall be designed to ensure reliable, hygienic, and adequate water availability for fire protection as well as domestic use. Source & Storage: • For domestic use undergrond tank of capacity of 25000 liters through overhead water tank • The primary source of water shall be a bore well (tube well). • Water from the bore well shall be conveyed through suitable pipelines to the Rooftop Water Tank . • The Water Tank shall be compartmentalized into Fire Water Tank and Domestic Water Tank as per applicable norms. Fire Water Priority: • Water from the bore well shall first be filled into the Fire Water Tank in the Storage tank to ensure uninterrupted fire-fighting water availability. • After the fire tank is fully charged, overflow water shall be diverted to the Domestic Water Tank. Pumping & Distribution: • Water from the domestic section of the Water tank shall be pumped using electrically operated pumps to the Overhead Tank (OHT). • The pumping system shall include necessary control valves, non-return valves, pressure gauges, and isolation valves. • Adequate pump capacity shall be provided to maintain required pressure and flow. Gravity Distribution: • From the water Tank, water shall be supplied through a gravity-based distribution system. • Vertical risers and horizontal distribution pipelines shall be provided to supply water to all toilets and other domestic points across all floors. System Design: • The entire distribution network shall be designed to optimize flow rate, pressure, and water quality. • All pipelines shall be of approved material and size, suitable for potable water. • The system shall comply with relevant CPWD / NBC / Local Authority norms.
6Sewer System
Siya Complex is located in an already developed scheme sewerage system shall be provided for the building to ensure safe and hygienic disposal of wastewater. • All soil, waste, and sewage from toilets and other sanitary fixtures shall be collected through a dedicated sewerage network. • The sewer lines shall be constructed using R.C.C. pipes, laid at proper gradients to ensure self-cleansing velocity. • Inspection chambers / manholes of 450 mm internal diameter shall be provided at suitable intervals, junctions, changes in direction, and levels, as per the approved MEP system design and relevant standards. • The sewerage network shall be designed to prevent leakage, backflow, and odor nuisance. • All sewer lines shall be properly vented and provided with necessary traps as per plumbing norms. • The system shall comply with applicable CPWD / NBC / Local Authority guidelines
7Drain
A separate storm water drainage system with ground water recharge provision (rainwater harvesting) shall be provided for the site. • Rainwater from terraces, roofs, paved areas, and open spaces shall be collected through a dedicated storm water drainage network. • The collected storm water shall be conveyed through properly sized pipelines and drains to rainwater harvesting / ground water recharge structures. • Adequate filter media and silt traps shall be provided before recharge to prevent choking and contamination. • Excess storm water, after groundwater recharge, shall be safely discharged into the BIDA storm water drain line as per the approved layout and specified plan. • The entire system shall be designed to prevent waterlogging and ensure efficient surface runoff management. • The storm water drainage system shall comply with applicable NBC / CPWD / Local Authority guidelines .• Desilting Chamber of 2.5m X 1.5 m X 1.0 m recharge pit of 3 m dia and recharge borewell of 300 mm dia of 15 m depth.
8Parks
N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).
9Tree Planting
Planted trees and bushes is the part of green area As per sanctioned plan.
10Design For Electric Supply Including Street Lighting
A Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting and other essential area is proposed as per sanctioned plan, L.T. Cable line, Feeder pillar, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines. Transformer capacity is 300 KVA.
11Community Buildings
N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).
12Treatment and Disposal System of Sewage and Sullage water
A comprehensive system shall be provided for the collection, treatment, and disposal of sewage and sullage water generated from the building. • All sewage and sullage water from toilets and other sanitary fixtures shall be collected through a separate sewerage network. • The collected wastewater shall be conveyed through R.C.C. sewer lines laid at appropriate gradients to the Septic Tank. • The entire treatment and disposal system shall be designed to prevent contamination, odor nuisance, and environmental pollution
13Solid Waste Management And Disposal System
A systematic Solid Waste Management and Disposal System shall be provided to ensure hygienic handling and environmentally safe disposal of solid waste generated from the premises. • Recyclable waste shall be stored separately and handed over to authorized recyclers / agencies. • Non-recyclable and inert waste shall be disposed of through the Municipal solid waste collection system. • The entire solid waste management system shall comply with Solid Waste Management Rules, 2016 and guidelines issued by the Local Authority
14Water Conservation System
A comprehensive Water Conservation System shall be implemented to promote efficient use of water and minimize wastage within the premises. • Rainwater harvesting and groundwater recharge systems shall be incorporated to utilize rainwater effectively. • The overall system shall be designed in compliance with NBC / CPWD / Local Authority guidelines and applicable water conservation norms.
15Energy Management System Including Use of Renewable Energy
We will use LED lights as well as solar lights in external areas for energy management system and considering Roof Top Solar Power Plant in selective areas as per UP Neda Lucknow requirement.
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 20 Dec 2029.

Sanctioned by Any Other Competent Authority · 4,872 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
1361221 Dec 202420 Dec 202920 Dec 203220 Dec 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

24 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
93 Mi5610Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1996
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1430-1435 ( Khasra N. 93 Mi
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
General body resolution
The resolution authorising an apartment owners’ association to act as the registering entity.
not reported—
Affidavit on balance development work
The promoter’s sworn statement about the development work still to be finished.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New2 Feb 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New2 Feb 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New9 Feb 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New2 Feb 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New4 Sept 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New4 Sept 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New4 Sept 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Sept 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New3 Feb 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New5 Feb 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New15 Feb 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Feb 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New4 Sept 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New11 Feb 2026 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameBhadohi Industrial Development Authority
RolePromoter · current
RERA IDUPRERAPRM92708
PANAAALB0141M
CIN / TANALDB01018D
Registered addressBIDA Bhawan, Near Rajpura Bypass Chauraha, Aurai Road Bhadohi 221401
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
BHADOHI INDUSTRIAL DEVELOPMENT AUTHORITY COLLECTION ACCOUNT FOR SIYA COMPLEXBankICICI BANKBranchBHADOHIBranch addressPLOT NO 72/71, SUDHA COMPLEX, CHAK SAIF MAIN ROAD, BHADOHI UP- 221401Branch districtSant Ravidas Nagar, Uttar PradeshA/C no.IFSCICIC0000820Branch emailjitendra.d@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
BHADOHI INDUSTRIAL DEVELOPMENT AUTHORITY SEPARATE ACCOUNT FOR SIYA COMPLEXBankICICI BANKBranchBHADOHIBranch addressPLOT NO 72/71, SUDHA COMPLEX, CHAK SAIF MAIN ROAD, BHADOHI UP- 221401Branch districtSant Ravidas Nagar, Uttar PradeshA/C no.IFSCICIC0000820
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
BHADOHI INDUSTRIAL DEVELOPMENT AUTHORITY RERA TRANSACTION ACCOUNT FOR SIYA COMPLEXBankICICI BANKBranchBHADOHIBranch addressPLOT NO 72/71, SUDHA COMPLEX, CHAK SAIF MAIN ROAD, BHADOHI, UP- 221401Branch districtSant Ravidas Nagar, Uttar PradeshA/C no.IFSCICICI0000820
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SIYA COMPLEX

Is SIYA COMPLEX RERA registered?

Yes. SIYA COMPLEX is registered with UPRERA under registration number UPRERAPRJ809405, registered on 24 Feb 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SIYA COMPLEX?

The completion date filed with UPRERA is 20 Dec 2029. No completion certificate is on record yet.

Who is the builder of SIYA COMPLEX?

Bhadohi Industrial Development Authority is the promoter entity that filed SIYA COMPLEX with UPRERA (promoter RERA ID UPRERAPRM92708). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SIYA COMPLEX have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

What configurations are available in SIYA COMPLEX?

The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SIYA COMPLEX?

The approved unit plan filed with UPRERA runs from 1,053 to 1,273 m² of carpet area (about 11,334 to 13,702 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗