SKYTECH COLOURS AVENUE TOWER C

UPRERARegistered

SKYTECH COLOURS AVENUE TOWER C is a RERA-registered residential project by Jatasya promoters Pvt ltd in Greater Noida, Gautam Budh Nagar (RERA ID UPRERAPRJ251610). Registered with a completion deadline of 4 Dec 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ251610
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Sept 2026
Project duration52 months
AddressPlot No. GH-01/C, Sector- 10, Greater Noida, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address385 kohat Enclave Pitam pura Delhi
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP SM-16-Apr-2025 24497

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 Sept 2026
Original completion4 Dec 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹18,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors74 · 1 · 22 (units from plan)
  • 3 BHK38 51%
  • 4 BHK36 49%
ConfigurationUnitsCarpet area
3 BHK3892
4 BHK36141
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER C · 3 BHK, 4 BHK, OTHER227492-141
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Modarchindia- Mr. Amit Kumar- Principal Architect
License COA Regd No. CA/1998/22706
Plot No. B-99, First Floor, Sector-63, Noida- 201301
Engineer
Optimum Design Pvt. Ltd.
B- 24, Sector-67, Noida- 201301
Contractor
Vishal Associates
D-37, Sector-56, Noida, G.B. Nagar, U.P
Sr.Development work declared to RERA
1Demarcation of Plots
Proposed Group Housing at Plot No. GH- 01/C, Sector- 10, Greater Noida. For - M/s Jatasya Promoters Pvt. Ltd.
2Boundary Wall
Made of RCC, Brick Work with Ms Railing and Gates , Side boundary wall of proposed 2000 mm height, and front boundary wall of proposed 1500 mm high with 500 mm high Ms railing
3Road Work
The proposed development works comprise approximately 545.01 m total length of internal roadwork with a 6.00 m wide carriageway, covering an approximate road area of 3,270.099 sq.m. The roadway is proposed with 80 mm Tremix concrete over PCC and WBM layers, along with paver/grasscrete paver areas as per the roadway detail
4Footpaths
The proposed development will be having pavers, natural stones like granite/marble and tiles on footpaths along side roads and the total area will be approx. 732.544 sq.mtrs.
5Water Supply Including Drinking Water Facilities
Greater Noida Authority shall supply water for the entire project. The incoming water shall be collected and stored in the following underground tanks; Underground Domestic Water Tank (UGT) - 180 KL total capacity, 1 No. Raw Water Tank- 100KL capacity, 1No. Treated Water Tank- 100KL, Fire Water Tank 1- 288 KL capacity, Fire Water Tank 2- 255 KL capacity One no. 100 mm diameter incoming water connections shall be provided to the Raw Water Tank. Water shall be pumped from the underground tanks and distributed to the respective overhead tanks through 65 mm and 50 mm diameter pipelines at the designated locations
6Sewer System
Sewerage and sullage will be treated in multistage process at STP of approx. 320 KLD Capacity for the project. The process includes screening and grit removal, primary settling of the solids, bilogical breakdown of organic matters and disinfection along with advanced filtration treatment. Sludge will be separated and disposed off or reused, while the final treated water (effluent) will be reused in horticulture and AC system or discharge. The MBBR Technology will be most appropriate to be used.
7Drain
Overflow of rain water harvesting pit to strom water drain of GNIDA is being proposed. Peak hourly discharge has been taken 108.87 NU Meter. Three number of rain water harvesting pit is also proposed to be installed to recharge the ground water.
8Parks
Green area is being provided as per GNIDA norms. The green area required as total site area is 12091.610 sq. mtrs. However the proposed green area is 4500.310 sq.mtrs. approx.
9Tree Planting
Evergreen tree planting as per GNIDA norms. 89 Nos of tree are required as per the development authority norms. Keeping the commitment of Green Noida, 92 Nos of evergreen trees are proposed for better and developed green area. The details of trees are mentioned in the attached proposed landscape plan.
10Design For Electric Supply Including Street Lighting
Electrical load calculated as per requirement and prevailing norms. street lightening with energy saving LED Street Lights are proposed. Total electrical is approx- 1720 KVA with 0.90 power factor. The proposed transformer capacity is 1171 KVA with 0.85 loading around three DG Set 1 nos 750 KVA+ 1 nos 380 KVA+ 1nos 320 KVA. KVA is also proposed 0.8 loading factor.
11Community Buildings
Community/Club Area of 676.984 sq,mt. is provided on the ground and first floor of Tower C which is for the use of all residents of the entire township, i.e., Skytech Colours Avenue.
12Treatment and Disposal System of Sewage and Sullage water
Sewage and sullage will be treated in a multistage process at STP with advanced filteration system. Sullage is separated and will be used/disposed off, while the final treated water will be used in flush, in gardening and AC System. Separate Kitchen waste line connected to ETP through greased trap.
13Solid Waste Management And Disposal System
Separating waste into different categories at the source to facilitate reuse, recycling as per norms. The reused waste will be sent for processing or disposal sites.
14Water Conservation System
Techniques and technologies to manage the water resources efficiently, aiming to reduce waste rain water harvesting, reduction wastage of water by using low flow fixture.
15Energy Management System Including Use of Renewable Energy
Optimize energy distribution system to reduce wastage and overall energy usage by installing low energy consuming light fixture etc. Install solar panels and install heat efficient glass to reduce heat.
16Fire Protection And Fire Safety System
Combination of strategies, equipment and protocols designated to prevent, detect control and suppress fire, ensuring the safety of people and property. It consists fire safety system- active and passive components. Active components such as fire alarm, sprinklers and extinguishers, while passive system like fire resistant material, fire barriers, contain and limit fire spread. All installation will as per NBC norms to prevent the fire incidence effective fire detection and fire fighting system.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Physical facilities and services that support public well being such as handicapped toilet, public toilet, drinking water facilities etc. The Total no. of toilets are given as per statutory requirements.
18Emergency Evacuation Services
To move people from a high risk location to safe areas like refugee balconies, fire escape stair cases have benen provided as per NBC norms. Eleventh floor refugee balcony area= 59.710 sq. mtrs. approx.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 4 Dec 2030.

Sanctioned by Greater Noida Authority · 2,662 sqm of land · an approved plan of 1 block and 74 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP SM-16-Apr-2025 244975 Dec 20254 Dec 20303 Dec 20334 Dec 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-01/C2661.77Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 18AA 045579
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · Builders/BRS05-2010-11/555
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · 1377
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New10 Jul 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 Aug 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 Aug 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New8 Aug 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Aug 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New14 Aug 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New22 Aug 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New14 Aug 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Sept 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New19 Aug 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New28 Jul 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Aug 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New2 Sept 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New23 Sept 2026 ↗
Affidavit on FORM RA-8 for credit availed/ to be availed along with CA certificate regarding disbursementNew8 Sept 2026 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameJatasya promoters Pvt ltd
RolePromoter · current
RERA IDUPRERAPRM12490
PANAACCJ9143N
CIN / TANU70200DL2012PTC240599
Name of chairmanMayank Chawla
Registered address385 kohat Enclave Pitam pura Delhi
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
JPPL COLLECTION ACCOUNT FOR SKYTECH COLOURS AVENUE TOWER CBankHDFC BANKBranchANSALS ARCADE SECTOR 18 NOIDABranch addressANSALS FORTUNE ARCADE, K - BLOCK, SECTOR - 18, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088Branch emailpreeti.ganguly@hdfc.bank.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
JPPL SEPARATE ACCOUNT FOR SKYTECH COLOURS AVENUE TOWER CBankHDFC BANKBranchANSALS ARCADE SECTOR 18 NOIDABranch addressANSALS FORTUNE ARCADE, K - BLOCK, SECTOR - 18, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
JPPL TRANSACTION ACCOUNT FOR SKYTECH COLOURS AVENUE TOWER CBankHDFC BANKBranchANSALS ARCADE SECTOR 18 NOIDABranch addressANSALS FORTUNE ARCADE, K - BLOCK, SECTOR - 18, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SKYTECH COLOURS AVENUE TOWER C

Is SKYTECH COLOURS AVENUE TOWER C RERA registered?

Yes. SKYTECH COLOURS AVENUE TOWER C is registered with UPRERA under registration number UPRERAPRJ251610, registered on 26 Sept 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SKYTECH COLOURS AVENUE TOWER C?

The completion date filed with UPRERA is 4 Dec 2030. No completion certificate is on record yet.

Who is the builder of SKYTECH COLOURS AVENUE TOWER C?

Jatasya promoters Pvt ltd is the promoter entity that filed SKYTECH COLOURS AVENUE TOWER C with UPRERA (promoter RERA ID UPRERAPRM12490). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SKYTECH COLOURS AVENUE TOWER C have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SKYTECH COLOURS AVENUE TOWER C located?

SKYTECH COLOURS AVENUE TOWER C is registered in Greater Noida, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SKYTECH COLOURS AVENUE TOWER C?

The unit plan filed with UPRERA lists 3 BHK, 4 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SKYTECH COLOURS AVENUE TOWER C?

The approved unit plan filed with UPRERA runs from 92 to 141 m² of carpet area (about 994 to 1,517 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SKYTECH COLOURS AVENUE TOWER C?

The approved unit plan describes 1 block and 74 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SKYTECH COLOURS AVENUE TOWER C?

About 112 units per acre: 74 planned units across 0.66 acres (2,662 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗