Sparsh Gateway

UPRERARegistered

Sparsh Gateway is a RERA-registered commercial project by SYMTECH DEVELOPERS in VRINDAVAN YOJNA , LUCKNOW, Lucknow (RERA ID UPRERAPRJ118943). Registered with a completion deadline of 27 Mar 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
31.57%Q3'25
41%Q4'25
51.4%Q1'26
57.52%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ118943
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start10 Dec 2024
Project duration28 months
AddressPLOT NO. 12-A/CP-8 & CP-9, VRINDAVAN YOJNA NO. 3, VRINDAVAN YOJNA , LUCKNOW, Sarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typePartnership Firm
Applicant addressShop No 5, Basement , 6A Leela Mansion Building, Hazratganj , Lucknow, Uttar Pradesh 226001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Commercial Building/08696/UPAVP/BP/23-24/1871/2182024

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered18 Feb 2025
Original completion27 Mar 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹26,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors4 · 1 · 4 (units from plan)
Homes · commercial units0 · 4 (shops and offices filed in the same plan)
ConfigurationUnitsCarpet area
SHOP4320-600
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · SHOP44320-600
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Shri Arun Kumar
License CA/76-3111
First floor Halwasiya Court, Hazratganj, Lucknow
Engineer
Brijendra Kumar Singh
Civil Engineer,N 1/65-C-6 SEVA UPVAN COLONY, SAMNEGHAT VARANASI UTTAR PRADESH
Contractor
Symtech Developers
Plot 12-A/CP-8 CP-9, VRINDAVAN YOJNA LUCKNOW
Sr.Development work declared to RERA
1Demarcation of Plots
We have one net plot area of size 1515 sqm , having 2 main entrance and 2 exit gate from the front road, Demarcated by its boundaries -North - 31.20 m , South - 31.50 m, East - 27.80 m, West - 27.50 m
2Boundary Wall
6 feet height and 230mm thick rcc/ms 1 section work which give a beautiful iconic design boundary wall to be made with 4 number of gates.
3Road Work
FROM THE MAIN ENTRANCE /EXIT GATE WE HAVE 100MM THICK , 6 MTR WIDE RCC ROAD THROUGH OUT THE PROJECT.
4Footpaths
WE WOULD PROVIDE FOOTHPATH THROUGH 5 FEET WIDE CC .
5Water Supply Including Drinking Water Facilities
OVERHEAD TANK (15000 LITRES), BOREWELL, GOVERNMENT WATER SUPPLY . EACH FLOOR WILL HAVE SEPARATE DRINKING WATER FACILITIES. WE WILL PROVIDE PUMPS FOR THE REQUIREMENTS OF BLOCKS THROUGH PIPELINES.
6Sewer System
4 INCH PVC PIPELINE CONNECTED WITH 6INCH PIPELINE TO MAN HOLES. MODULAR SEWERAGE SSYETM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND SFTER TERATMENTS RE-USE IN FLUSH AND GARDEN . OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSYTEM. WHEN COME INTO FORCE..
7Drain
RECHARGE WELL AND WASTE WATER PIPELINE TO BE CONNECT IN NEARBY GOVERNMENT PROVIDED MAIN HOLE. STORM WATER SHALL BE PROVIDED. STORM WATER FROM TERACES, ROADS, AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL E CONNECT WITH MUNICIPAL DRAIN LINE.
8Parks
NA
9Tree Planting
WE WILL PROVIDE 4 NUMBER TREES ALL ALONG THE BOUNDARY WALL AND GREEN AREA.
10Design For Electric Supply Including Street Lighting
ELECTRICITY SUPPLY WILL BE PROVIDED AS PER SERVICE DRAWINGS , STREET LIGHTING NOT REQUIRED.WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED , TRANSFORMER, HT PANEL, LT PANEL, FEEDER PILLER AND DG BACK FOR COMMON SERVICES LIKE EXTERNAL LIGHTING, FOUNTAIN, STP, PUMP ROOM ETC.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
AS PER SERVICE PLAN TO BE CONNECT INTO GOVERNMENT AVAILED SEWER LINE. MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND SFTER TREATMENT RE-USE IN FLUSH . OVERFLOW FROM STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WHEN COME INTO FORCE.
13Solid Waste Management And Disposal System
TO BE PROVIDED AS PER GOVERNMENT GUIDELINES. SOLID WASTE TO BE COLLECTED FROM STORED IN GARBAGE ROOM.
14Water Conservation System
WE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURES AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM WILL BE PROVIDED TO REDUCE THE WATER CONSUMPTION AND IMPROVE THE GROUND WATER LEVEL.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
PROVISIONAL NOC HAS BEEN RECEIVED FROM FIRE DEPARTMENT AND ALL PROVISIONS SHALL BE MADE AS PER PROVISIONAL NOC AND DRAWING SUBMITTED TO THE FIRE DEPARTMENT. FIRE FIGHTING SYSTEM, FA SYSTEM AS WILL BE PROVIDED LOCAL AUTHORITIES REQUIREMENT.
17Social Infrastructure And Other Public Amenities Including Public Health Services
TOILET BLOCK, CLENA DRINKING WATER, FIRSTAID BOX.
18Emergency Evacuation Services
WE WILL HAVE FIRE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS , SHALL BE PROVIDED AS PER FIRE DEPARTMENT PROVISIONAL NOC.
19Other Miscellaneous Work
At this stage all the development plans have already been shared above by us if there will be any further development it will be reported in future.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 27 Mar 2027.

Sanctioned by U.P. Awas Evam Vikas Parishad · 1,515 sqm of land · an approved plan of 1 block and 4 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Commercial Building/08696/UPAVP/BP/23-24/1871/218202428 Mar 202427 Mar 202727 Mar 202827 Mar 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

30 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
12-A/CP-09 CP-081515Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 14349/14345
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New3 Jan 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Dec 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Dec 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New7 Feb 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Dec 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Dec 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Dec 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Dec 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New23 Dec 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Feb 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Dec 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Dec 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New4 Feb 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New6 Feb 2025 ↗

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2024-Q3 to 2026-Q2.

QuarterConstructionCertificates
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q231.57%CA ↗ · Arch ↗ · Eng ↗
2025-Q341%CA ↗ · Arch ↗ · Eng ↗
2025-Q451.4%CA ↗ · Arch ↗ · Eng ↗
2026-Q157.52%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSYMTECH DEVELOPERS
RolePromoter · current
RERA IDUPRERAPRM294236
PANABVFS8559G
CIN / TANLKNS10559D
Registered addressShop No 5, Basement , 6A Leela Mansion Building, Hazratganj , Lucknow, Uttar Pradesh 226001
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Symtech Developers Collection Account for Sparsh GatewayBankBank Of IndiaBranchAishbagh, LucknowBranch addressAishbagh, LUcknowBranch districtLucknowA/C no.IFSCBKID0006803Branch emailAishbagh.Lucknow@bankofindia.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Symtech Developers Separate Account for Sparsh GatewayBankBank Of IndiaBranchAishbagh, LucknowBranch addressAishbagh, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCBKID0006803
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Symtech Devolpers RERA Transaction Account for Sparsh GatewayBankBank Of IndiaBranchAishbagh, LucknowBranch addressAishbagh, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCBKID0006803
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
19 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Sparsh Gateway

Is Sparsh Gateway RERA registered?

Yes. Sparsh Gateway is registered with UPRERA under registration number UPRERAPRJ118943, registered on 18 Feb 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Sparsh Gateway?

The completion date filed with UPRERA is 27 Mar 2027. No completion certificate is on record yet.

Who is the builder of Sparsh Gateway?

SYMTECH DEVELOPERS is the promoter entity that filed Sparsh Gateway with UPRERA (promoter RERA ID UPRERAPRM294236). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Sparsh Gateway have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Sparsh Gateway located?

Sparsh Gateway is registered in VRINDAVAN YOJNA , LUCKNOW, Lucknow, as filed with UPRERA.

What configurations are available in Sparsh Gateway?

The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Sparsh Gateway?

The approved unit plan filed with UPRERA runs from 320 to 600 m² of carpet area (about 3,445 to 6,461 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Sparsh Gateway?

The approved unit plan describes 1 block and 4 units of which 0 are homes and 4 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Sparsh Gateway?

About 11 units per acre: 4 planned units across 0.37 acres (1,515 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗