Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ4504
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start17 Sept 2014
Original start17 Sept 2014
Project duration82 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address505-B & 506, 5th floor, Titanium shalimar corporate park, plot no TC/G-1/1, vibhuti khand, gomti nagar, lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    377

  2. 4 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. valid to

    Permit revalidated

    2873

  6. to

    Extension granted

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  9. to

    Extension granted

  10. Completion certificate filed

  11. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  12. Building permit sanctioned

    160/M/S AZEAGAIA /VA.NI-1 (compounding maps)

  13. Completion certificate filed

  14. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered29 Jul 2017
Original completion30 Jun 2019
Revised completion28 Jun 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary23 Jun 2021
Registration fee₹1,32,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors644 · 6 · 16 (units from plan)
Homes · commercial units636 · 8 (shops and offices filed in the same plan)
  • 3 BHK476 74%
  • 4 BHK131 20%
  • 1 BHK15 2%
  • PENTHOUSE11 2%
  • SHOP8 1%
  • OTHER3 <1%
ConfigurationUnitsCarpet area
OTHER34-139
3 BHK47685-100
4 BHK131129
PENTHOUSE11288
SHOP8170
1 BHK15244
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block-A/Tower 7- 8 · OTHER, 4 BHK, PENTHOUSE16142129-288
Block-A/Tower 9 · OTHER, 3 BHK1642100
Block-A/Tower- 10 · OTHER, 3 BHK165695-100
Block-A/Tower- 11 · OTHER, 3 BHK165695
Block-B/Tower 1- 5 · OTHER, 3 BHK1632285
tower 6 · OTHER, SHOP, 1 BHK6264-244
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SPACE DESIGNERS
License CA/2006/38039
112/281, SWAROOP NAGAR, KANPUR
Engineer
SPAN STRUCTURES
8/14, INDIRA NAGAR, LUCKNOW
Contractor
VENSA INFRASTRUCTURE LIMITED
6-3-252/2/6, 1ST & 2ND FLOOR, ERRAMANZIL,HYDERABAD-500082
Sr.Development work declared to RERA
1Demarcation of Plots
GH-8 SECTOR-11, AWAS VIKAS VRINDAVAN YOJNA, RAIBAREILLY ROAD, LUCKNOW
2Boundary Wall
BRICK BOUNDARY WALL WITH FENCING
3Road Work
PROVIDING RUBBER MOULDED M40 GRADE INTERLOCKING PAVERS WITH DESIGN/PATTERN
4Footpaths
GRANITE FIXING IN TWO OR MORE COLOURS/SHADES WITH PATTERN/DESIGN
5Water Supply Including Drinking Water Facilities
PROVIDING RCC WATER TANK ON TERRACE IN EACH TOWER FOR DOMESTIC USES, (I.E BORING WATER INTO UGT AND FROM UGT TO TERRACE WATERTANK)
6Sewer System
BUILDING SEWAGE WILL BE DIVIDED INTO TWO PARTS I.E SOIL FITTINGS AND WASTE FITTINGS AND THEN IT WILL BE FURTHER DIVIDED INTO PARTS THAT IS SOIL DISCHARGE FROM SOIL FITTINGS AND WASTE DISCHARGE FROM WASTE FITTINGS THEN BOTH WILL BE COMBINED IN PIPE SYSTEM AND SEND TO STP FOR TREATED WATERQ
7Drain
PROVIDING SAUCER DRAIN FOR SUB-SURFACE DRAINAGE SYSTEM, WHICH PLACED TOP FINISHED LEVEL TO REMOVE EXCESS WATER AT THE ROOT LEVEL. A LARGE COLLECTOR DRAIN IS INSTALLED TO COLLECT WATER FROM THE SAUCER DRAIN. TERRACE RAIN WATER DRAINED IN HARVESTING PIT.
8Parks
PROVIDING ACUPUNCTURE GARDEN, EARTH MOUNDS, PLAY HILLS ETC.
9Tree Planting
PLANTS NAMES- CASSIA FISTULA, DELONIX REGIA, BUTEA MONOSPERMA,RAPHIS PALM,PLUMERIA ALBA, CYCAS REVOLUTA ETC.
10Design For Electric Supply Including Street Lighting
3000 KW FROM UPPCL
11Community Buildings
CLUB BUILDING IN WHICH THERE IS SHOPS, GYM, INDOOR GAMES, PRIVATE LADIES SWIMMING POOL, ETC
12Treatment and Disposal System of Sewage and Sullage water
INSTALLED 350 KLD STP AND WTP AND TREATED WATER USED FOR FLUSHING AND HORTICULTURE ETC.
13Solid Waste Management And Disposal System
SOLID WASTE COLLECT FROM DOOR TO DOOR
14Water Conservation System
PROVIDING DUAL FLUSH TOILETS- IN WHICH TWO BUTTON OR HANDLE TO FLUSH DIFFERENT AMOUNT OF WATER (LIQUID OR SOLID WASTE) PROVIDING RAIN WATER HARVESTING PIT WHICH ALLOWS THE RAIN TO REPLENISH/REFILL GROUND WATER BY RECHARGING THE UNDERGROUND WATER LEVEL/AQUIFERS. PROVIDING LOW PRESSURE FIXTURES (LIKE TAP,OVER HEAD SHOWER, ETC).
15Energy Management System Including Use of Renewable Energy
PROVIDING SOLAR STREET LIGHTS FOR ROAD, PROVIDING LED LIGHTING IN APARTMENTS, CORRIDOR, ETC.
16Fire Protection And Fire Safety System
FIRE FIGHTING SYSTEM AS PER NORMS.
17Emergency Evacuation Services
SEPARATE FIRE STAIR CASE IN EACH TOWER WITH FIRE DOOR.
18Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1INVEST 101 HOMES LLPUPRERAAGT10085
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

5 permits

An approval and the date it runs to - not proof the work matching it was done.

5 sanctioning permits are on record with UPRERA, the latest valid to 11 Feb 2025. 2 of them carry a revalidation, the latest valid to 11 Feb 2021.

Sanctioned by U.P. Awas Evam Vikas Parishad · 25,333 sqm of land · an approved plan of 6 blocks and 644 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
37712 Feb 201411 Feb 201910 Feb 202229 Jun 2020—
37712 Feb 201411 Feb 201911 Feb 202229 Jun 202012 Feb 2014
37712 Feb 201411 Feb 201911 Feb 202229 Jun 2020—
37712 Feb 201411 Feb 201911 Feb 202129 Jun 202012 Feb 2019
valid to 11 Feb 2021
as 2873
160/M/S AZEAGAIA /VA.NI-1 (compounding maps)17 Jan 202411 Feb 202511 Feb 202528 Jun 2021—
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 28 Jun 2021.

#Granted fromExtended uptoNote
130 Jun 201929 Jun 2020—
229 Jun 202028 Dec 2020Six months extension in view of force majeure caused by covid-19 pandemic
328 Dec 202028 Jun 2021—

Land & documents

24 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
11/GH-8, SECTOR-11, VRINDAVAN YOJNA25333 SQMT—
11/GH-8, SECTOR-11,VRINDAVAN YOJNA, RAIBAREILLY RO25333Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 29 Dec 2012.

Registry no.DateTypeArea
2250129 Dec 2012other—
2250129 Dec 2012other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 22501
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · 22501
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · 7214
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Sale deed · 24355
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New8 Dec 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New23 Jul 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Dec 2018 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New12 Jul 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old22 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old23 Feb 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old23 Feb 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old24 Feb 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old24 Feb 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old24 Feb 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old24 Feb 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old24 Feb 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAVAILABLE
Fire safety (as filed with RERA)NOC REF NO. FS-1076/2013, DATED 01.05.2013
Renewable energyFUTURE PLANNING
Other facilitiesENTERTAINMENT FACILITY, HEALTH & SPORTS,CCTV, BANQUET HALL, SWIMMING POOL, CLUB

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAZEAGAIA DEVELOPMENT PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM2639
PANAAKCA7703R
CIN / TANU70102UP2012PTC051474
Name of chairmanANIRUDH SINGH CHAUHANSUKHMINDER SINGHTANG YANG
Registered address505-B & 506, 5th floor, Titanium shalimar corporate park, plot no TC/G-1/1, vibhuti khand, gomti nagar, lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
AZEAGAIA DEVELOPMENT PRIVATE LIMITEDBankState Bank of IndiaBranch10 Rana Pratap Marg, LucknowA/C no.IFSCSBIN0004166
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about AZEA BOTANICA

Is AZEA BOTANICA RERA registered?

Yes. AZEA BOTANICA is registered with UPRERA under registration number UPRERAPRJ4504, registered on 29 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has AZEA BOTANICA been completed?

UPRERA still lists AZEA BOTANICA as Registered, so it is not shown as completed here. A completion certificate dated 23 Jun 2021 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of AZEA BOTANICA?

AZEAGAIA DEVELOPMENT PRIVATE LIMITED is the promoter entity that filed AZEA BOTANICA with UPRERA (promoter RERA ID UPRERAPRM2639). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted AZEA BOTANICA more time to complete?

UPRERA's record carries 3 completion extensions for AZEA BOTANICA, the latest running to 28 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does AZEA BOTANICA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is AZEA BOTANICA located?

AZEA BOTANICA is registered in Lucknow, as filed with UPRERA.

What configurations are available in AZEA BOTANICA?

The unit plan filed with UPRERA lists OTHER, 3 BHK, 4 BHK, PENTHOUSE, SHOP and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in AZEA BOTANICA?

The approved unit plan filed with UPRERA runs from 4 to 288 m² of carpet area (about 47 to 3,101 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in AZEA BOTANICA?

The approved unit plan describes 6 blocks and 644 units of which 636 are homes and 8 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is AZEA BOTANICA?

About 103 units per acre: 644 planned units across 6.26 acres (25,333 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗