AZEA BOTANICA is a RERA-registered residential project by AZEAGAIA DEVELOPMENT PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ4504). Registered with a completion deadline of 28 Jun 2021.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ4504 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 17 Sept 2014 |
| Original start | 17 Sept 2014 |
| Project duration | 82 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | 505-B & 506, 5th floor, Titanium shalimar corporate park, plot no TC/G-1/1, vibhuti khand, gomti nagar, lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
377
4 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- valid to
Permit revalidated
2873
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
- to
Extension granted
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
160/M/S AZEAGAIA /VA.NI-1 (compounding maps)
Completion certificate filed
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 29 Jul 2017 |
| Original completion | 30 Jun 2019 |
| Revised completion | 28 Jun 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 23 Jun 2021 |
| Registration fee | ₹1,32,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK476 74%
- 4 BHK131 20%
- 1 BHK15 2%
- PENTHOUSE11 2%
- SHOP8 1%
- OTHER3 <1%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 3 | 4-139 |
| 3 BHK | 476 | 85-100 |
| 4 BHK | 131 | 129 |
| PENTHOUSE | 11 | 288 |
| SHOP | 8 | 170 |
| 1 BHK | 15 | 244 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Block-A/Tower 7- 8 · OTHER, 4 BHK, PENTHOUSE | 16 | 142 | 129-288 |
| Block-A/Tower 9 · OTHER, 3 BHK | 16 | 42 | 100 |
| Block-A/Tower- 10 · OTHER, 3 BHK | 16 | 56 | 95-100 |
| Block-A/Tower- 11 · OTHER, 3 BHK | 16 | 56 | 95 |
| Block-B/Tower 1- 5 · OTHER, 3 BHK | 16 | 322 | 85 |
| tower 6 · OTHER, SHOP, 1 BHK | 6 | 26 | 4-244 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots GH-8 SECTOR-11, AWAS VIKAS VRINDAVAN YOJNA, RAIBAREILLY ROAD, LUCKNOW |
| 2 | Boundary Wall BRICK BOUNDARY WALL WITH FENCING |
| 3 | Road Work PROVIDING RUBBER MOULDED M40 GRADE INTERLOCKING PAVERS WITH DESIGN/PATTERN |
| 4 | Footpaths GRANITE FIXING IN TWO OR MORE COLOURS/SHADES WITH PATTERN/DESIGN |
| 5 | Water Supply Including Drinking Water Facilities PROVIDING RCC WATER TANK ON TERRACE IN EACH TOWER FOR DOMESTIC USES, (I.E BORING WATER INTO UGT AND FROM UGT TO TERRACE WATERTANK) |
| 6 | Sewer System BUILDING SEWAGE WILL BE DIVIDED INTO TWO PARTS I.E SOIL FITTINGS AND WASTE FITTINGS AND THEN IT WILL BE FURTHER DIVIDED INTO PARTS THAT IS SOIL DISCHARGE FROM SOIL FITTINGS AND WASTE DISCHARGE FROM WASTE FITTINGS THEN BOTH WILL BE COMBINED IN PIPE SYSTEM AND SEND TO STP FOR TREATED WATERQ |
| 7 | Drain PROVIDING SAUCER DRAIN FOR SUB-SURFACE DRAINAGE SYSTEM, WHICH PLACED TOP FINISHED LEVEL TO REMOVE EXCESS WATER AT THE ROOT LEVEL. A LARGE COLLECTOR DRAIN IS INSTALLED TO COLLECT WATER FROM THE SAUCER DRAIN. TERRACE RAIN WATER DRAINED IN HARVESTING PIT. |
| 8 | Parks PROVIDING ACUPUNCTURE GARDEN, EARTH MOUNDS, PLAY HILLS ETC. |
| 9 | Tree Planting PLANTS NAMES- CASSIA FISTULA, DELONIX REGIA, BUTEA MONOSPERMA,RAPHIS PALM,PLUMERIA ALBA, CYCAS REVOLUTA ETC. |
| 10 | Design For Electric Supply Including Street Lighting 3000 KW FROM UPPCL |
| 11 | Community Buildings CLUB BUILDING IN WHICH THERE IS SHOPS, GYM, INDOOR GAMES, PRIVATE LADIES SWIMMING POOL, ETC |
| 12 | Treatment and Disposal System of Sewage and Sullage water INSTALLED 350 KLD STP AND WTP AND TREATED WATER USED FOR FLUSHING AND HORTICULTURE ETC. |
| 13 | Solid Waste Management And Disposal System SOLID WASTE COLLECT FROM DOOR TO DOOR |
| 14 | Water Conservation System PROVIDING DUAL FLUSH TOILETS- IN WHICH TWO BUTTON OR HANDLE TO FLUSH DIFFERENT AMOUNT OF WATER (LIQUID OR SOLID WASTE) PROVIDING RAIN WATER HARVESTING PIT WHICH ALLOWS THE RAIN TO REPLENISH/REFILL GROUND WATER BY RECHARGING THE UNDERGROUND WATER LEVEL/AQUIFERS. PROVIDING LOW PRESSURE FIXTURES (LIKE TAP,OVER HEAD SHOWER, ETC). |
| 15 | Energy Management System Including Use of Renewable Energy PROVIDING SOLAR STREET LIGHTS FOR ROAD, PROVIDING LED LIGHTING IN APARTMENTS, CORRIDOR, ETC. |
| 16 | Fire Protection And Fire Safety System FIRE FIGHTING SYSTEM AS PER NORMS. |
| 17 | Emergency Evacuation Services SEPARATE FIRE STAIR CASE IN EACH TOWER WITH FIRE DOOR. |
| 18 | Other Miscellaneous Work NA |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | INVEST 101 HOMES LLP | UPRERAAGT10085 |
Permits & extensions
5 permits
An approval and the date it runs to - not proof the work matching it was done.
5 sanctioning permits are on record with UPRERA, the latest valid to 11 Feb 2025. 2 of them carry a revalidation, the latest valid to 11 Feb 2021.
Sanctioned by U.P. Awas Evam Vikas Parishad · 25,333 sqm of land · an approved plan of 6 blocks and 644 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 377 | 12 Feb 2014 | 11 Feb 2019 | 10 Feb 2022 | 29 Jun 2020 | — | |
| 377 | 12 Feb 2014 | 11 Feb 2019 | 11 Feb 2022 | 29 Jun 2020 | 12 Feb 2014 | |
| 377 | 12 Feb 2014 | 11 Feb 2019 | 11 Feb 2022 | 29 Jun 2020 | — | |
| 377 | 12 Feb 2014 | 11 Feb 2019 | 11 Feb 2021 | 29 Jun 2020 | 12 Feb 2019 valid to 11 Feb 2021 as 2873 | |
| 160/M/S AZEAGAIA /VA.NI-1 (compounding maps) | 17 Jan 2024 | 11 Feb 2025 | 11 Feb 2025 | 28 Jun 2021 | — |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 28 Jun 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2019 | 29 Jun 2020 | — |
| 2 | 29 Jun 2020 | 28 Dec 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 3 | 28 Dec 2020 | 28 Jun 2021 | — |
Land & documents
24 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 11/GH-8, SECTOR-11, VRINDAVAN YOJNA | 25333 SQMT | — |
| 11/GH-8, SECTOR-11,VRINDAVAN YOJNA, RAIBAREILLY RO | 25333 | Plot |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 29 Dec 2012.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 22501 | 29 Dec 2012 | other | — |
| 22501 | 29 Dec 2012 | other | — |
| Registry document · 22501 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · 22501 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 7214 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Sale deed · 24355 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 8 Dec 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 5 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 5 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 23 Jul 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 5 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 5 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 5 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 5 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 5 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 5 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Dec 2018 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 12 Jul 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 22 Feb 2018 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 23 Feb 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 23 Feb 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 24 Feb 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 24 Feb 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 24 Feb 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 24 Feb 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 24 Feb 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | AVAILABLE |
| Fire safety (as filed with RERA) | NOC REF NO. FS-1076/2013, DATED 01.05.2013 |
| Renewable energy | FUTURE PLANNING |
| Other facilities | ENTERTAINMENT FACILITY, HEALTH & SPORTS,CCTV, BANQUET HALL, SWIMMING POOL, CLUB |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
7 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | AZEAGAIA DEVELOPMENT PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2639 |
| PAN | AAKCA7703R |
| CIN / TAN | U70102UP2012PTC051474 |
| Name of chairman | ANIRUDH SINGH CHAUHANSUKHMINDER SINGHTANG YANG |
| Registered address | 505-B & 506, 5th floor, Titanium shalimar corporate park, plot no TC/G-1/1, vibhuti khand, gomti nagar, lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | AZEAGAIA DEVELOPMENT PRIVATE LIMITEDBankState Bank of IndiaBranch10 Rana Pratap Marg, LucknowA/C no.IFSCSBIN0004166 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about AZEA BOTANICA
Is AZEA BOTANICA RERA registered?
Yes. AZEA BOTANICA is registered with UPRERA under registration number UPRERAPRJ4504, registered on 29 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has AZEA BOTANICA been completed?
UPRERA still lists AZEA BOTANICA as Registered, so it is not shown as completed here. A completion certificate dated 23 Jun 2021 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of AZEA BOTANICA?
AZEAGAIA DEVELOPMENT PRIVATE LIMITED is the promoter entity that filed AZEA BOTANICA with UPRERA (promoter RERA ID UPRERAPRM2639). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted AZEA BOTANICA more time to complete?
UPRERA's record carries 3 completion extensions for AZEA BOTANICA, the latest running to 28 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does AZEA BOTANICA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is AZEA BOTANICA located?
AZEA BOTANICA is registered in Lucknow, as filed with UPRERA.
What configurations are available in AZEA BOTANICA?
The unit plan filed with UPRERA lists OTHER, 3 BHK, 4 BHK, PENTHOUSE, SHOP and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in AZEA BOTANICA?
The approved unit plan filed with UPRERA runs from 4 to 288 m² of carpet area (about 47 to 3,101 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in AZEA BOTANICA?
The approved unit plan describes 6 blocks and 644 units of which 636 are homes and 8 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is AZEA BOTANICA?
About 103 units per acre: 644 planned units across 6.26 acres (25,333 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗