SURAT RESIDENCY is a RERA-registered residential project by SURAT INFRATECH PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ11777). Registered with a completion deadline of 27 Jun 2024.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ11777 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 30 Jun 2017 |
| Project duration | 82 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | D 81 VIBHUTI KHAND GOMTI NAGAR LUCKNOW 226 010 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
2729
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Permit revalidated (4)
4 building permits sanctioned
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
- valid to
Permit revalidated
169
2 completion certificates filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 17 Aug 2017 |
| Original completion | 29 Jun 2022 |
| Revised completion | 27 Jun 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 10 Jul 2025 |
| Registration fee | ₹30,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK85 62%
- 2 BHK52 38%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 85 | 90-140 |
| 2 BHK | 52 | 67-69 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 3 BHK | 11 | 66 | 90-111 |
| B · 2 BHK, 3 BHK | 9 | 71 | 67-140 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
Permits & extensions
5 permits
An approval and the date it runs to - not proof the work matching it was done.
5 sanctioning permits are on record with UPRERA, the latest valid to 22 Jul 2026. All 5 carry a revalidation, the latest valid to 22 Jul 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 4,906 sqm of land · an approved plan of 2 blocks and 137 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 2729 | 16 Sept 2016 | 15 Sept 2021 | 15 Sept 2024 | 28 Dec 2022 | 23 Jul 2021 valid to 15 Sept 2024 as 1645 | |
| 2729 | 23 Jul 2021 | 22 Jul 2026 | 22 Jul 2026 | 24 Apr 2024 | 23 Jul 2021 valid to 22 Jul 2026 | |
| 2729 | 23 Jul 2021 | 22 Jul 2026 | 22 Jul 2026 | 24 Apr 2024 | 23 Jul 2021 valid to 22 Jul 2026 | |
| 2729 | 23 Jul 2021 | 22 Jul 2026 | 19 Jan 2028 | 24 Apr 2024 | 23 Jul 2021 valid to 20 Jan 2025 | |
| 2729 | 23 Jul 2021 | 22 Jul 2026 | 19 Jan 2028 | 24 Apr 2024 | 20 Jan 2025 valid to 20 Jan 2025 as 169 |
| Document | File |
|---|---|
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 27 Jun 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 29 Jun 2022 | 28 Dec 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 28 Dec 2022 | 27 Jun 2024 | — |
Land & documents
2 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-4 | 4905.68 Sqm | — |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 4 Aug 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 29966 | 4 Aug 2015 | self | — |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 29966 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 16 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | Complete as per Fire Department |
| Health service | As per norms |
| Renewable energy | YES |
| Other facilities | Swimmimg pool, Club, Shop |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2022-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SURAT INFRATECH PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM13357 |
| PAN | AAOCS6373D |
| CIN / TAN | U70102UP2010PTC041710 |
| Name of chairman | RAMESH MISHRA |
| Registered address | D 81 VIBHUTI KHAND GOMTI NAGAR LUCKNOW 226 010 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | SURAT INFRATECH PRIVATE LIMITEDBankOriental Bank of CommerceBranchGOMTI NAGAR, LUCKNOWA/C no.IFSCORBC0100687 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about SURAT RESIDENCY
Is SURAT RESIDENCY RERA registered?
Yes. SURAT RESIDENCY is registered with UPRERA under registration number UPRERAPRJ11777, registered on 17 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has SURAT RESIDENCY been completed?
UPRERA still lists SURAT RESIDENCY as Registered, so it is not shown as completed here. A completion certificate dated 10 Jul 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of SURAT RESIDENCY?
SURAT INFRATECH PRIVATE LIMITED is the promoter entity that filed SURAT RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM13357). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted SURAT RESIDENCY more time to complete?
UPRERA's record carries 2 completion extensions for SURAT RESIDENCY, the latest running to 27 Jun 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SURAT RESIDENCY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SURAT RESIDENCY located?
SURAT RESIDENCY is registered in Lucknow, as filed with UPRERA.
What configurations are available in SURAT RESIDENCY?
The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SURAT RESIDENCY?
The approved unit plan filed with UPRERA runs from 67 to 140 m² of carpet area (about 716 to 1,507 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SURAT RESIDENCY?
The approved unit plan describes 2 blocks and 137 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SURAT RESIDENCY?
About 113 units per acre: 137 planned units across 1.21 acres (4,906 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗