Srishti is a RERA-registered residential project by Renowned Buildtech Private Limited in Ghaziabad (RERA ID UPRERAPRJ7939). Registered with a completion deadline of 28 Dec 2020.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ7939 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Jul 2017 |
| Original start | 1 Jul 2017 |
| Project duration | 42 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | H-95, 2nd Floor, Sector-63, Noida |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
590/Zone5/2016
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 15 Aug 2017 |
| Original completion | 30 Jun 2019 |
| Revised completion | 28 Dec 2020 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 12 Jul 2021 |
| Registration fee | ₹1,25,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK283 46%
- VILLA147 24%
- 3 BHK93 15%
- SHOP69 11%
- 1 BHK12 2%
- 4 BHK6 1%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 6 | 70 |
| 3 BHK | 93 | 56-82 |
| 2 BHK | 283 | 36-56 |
| 1 BHK | 12 | 27 |
| VILLA | 147 | 22-60 |
| SHOP | 69 | 7-22 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Avantika Retail Street · SHOP | 4 | 69 | 7-22 |
| Building No. 100 · 2 BHK | 3 | 3 | 41 |
| Building No. 101 · 2 BHK | 3 | 3 | 45 |
| Building No. 102 · 2 BHK | 3 | 4 | 49 |
| Building No. 103 · 2 BHK | 3 | 3 | 49-50 |
| Building No. 104 · 2 BHK | 3 | 3 | 49 |
| Building No. 105 · 2 BHK | 3 | 3 | 49 |
| Building No. 106 · 2 BHK | 3 | 3 | 49 |
| Building No. 107 · 2 BHK | 3 | 3 | 49 |
| Building No. 108 · 2 BHK | 3 | 3 | 49 |
| Building No. 111 · 2 BHK | 3 | 3 | 49 |
| Building No. 112 · 2 BHK | 3 | 3 | 49 |
| Building No. 113 · 2 BHK | 3 | 3 | 49 |
| Building No. 114 · 2 BHK | 3 | 3 | 49 |
| Building No. 115 · 2 BHK | 3 | 3 | 49 |
| Building No. 116 · 2 BHK | 3 | 3 | 49 |
| Building No. 117 · 2 BHK | 3 | 3 | 49 |
| Building No. 118 · 2 BHK | 3 | 3 | 49 |
| Building No. 119 · 2 BHK | 3 | 3 | 49 |
| Building No. 120 · 2 BHK | 3 | 3 | 49 |
| Building No. 121 · 2 BHK | 3 | 3 | 49 |
| Building No. 122 · 2 BHK | 3 | 3 | 49 |
| Building No. 123 · 2 BHK | 3 | 3 | 49 |
| Building No. 124 · 2 BHK | 3 | 3 | 49 |
| Building No. 125 · 2 BHK | 3 | 3 | 49 |
| Building No. 126 · 2 BHK | 3 | 3 | 41 |
| Building No. 133 · 2 BHK | 3 | 3 | 49 |
| Building No. 134 · 2 BHK | 3 | 3 | 53 |
| Building No. 135 · 2 BHK | 3 | 3 | 54 |
| Building No. 136 · 2 BHK | 3 | 3 | 54 |
| Building No. 137 · 3 BHK | 3 | 3 | 56 |
| Building No. 138 · 3 BHK | 3 | 3 | 56 |
| Building No. 139 · 3 BHK | 3 | 3 | 56 |
| Building No. 140 · 2 BHK | 3 | 3 | 52 |
| Building No. 146 · 1 BHK | 3 | 3 | 27 |
| Building No. 147 · 2 BHK | 3 | 3 | 36 |
| Building No. 148 · 2 BHK | 3 | 3 | 36 |
| Building No. 149 · 2 BHK | 3 | 3 | 36 |
| Building No. 150 · 2 BHK | 3 | 3 | 36 |
| Building No. 151 · 2 BHK | 3 | 3 | 36 |
| Building No. 152 · 2 BHK | 3 | 3 | 36 |
| Building No. 153 · 2 BHK | 3 | 3 | 36 |
| Building No. 154 · 2 BHK | 3 | 3 | 36 |
| Building No. 155 · 2 BHK | 3 | 3 | 36 |
| Building No. 156 · 1 BHK | 3 | 3 | 27 |
| Building No. 157 · 1 BHK | 3 | 3 | 27 |
| Building No. 158 · 2 BHK | 3 | 3 | 36 |
| Building No. 159 · 2 BHK | 3 | 3 | 36 |
| Building No. 160 · 2 BHK | 3 | 3 | 36 |
| Building No. 161 · 2 BHK | 3 | 3 | 36 |
| Building No. 162 · 2 BHK | 3 | 3 | 36 |
| Building No. 163 · 2 BHK | 3 | 3 | 36 |
| Building No. 164 · 2 BHK | 3 | 3 | 36 |
| Building No. 165 · 2 BHK | 3 | 3 | 36 |
| Building No. 166 · 2 BHK | 3 | 3 | 36 |
| Building No. 167 · 1 BHK | 3 | 3 | 27 |
| Building No. 168 · 2 BHK | 3 | 3 | 49 |
| Building No. 169 · 2 BHK | 3 | 3 | 47 |
| Building No. 170 · 2 BHK | 3 | 3 | 47 |
| Building No. 171 · 2 BHK | 3 | 3 | 47 |
| Building No. 172 · 2 BHK | 3 | 3 | 47 |
| Building No. 173 · 2 BHK | 3 | 3 | 47 |
| Building No. 174 · 2 BHK | 3 | 3 | 47 |
| Building No. 175 · 2 BHK | 3 | 3 | 47 |
| Building No. 176 · 2 BHK | 3 | 3 | 47 |
| Building No. 177 · 2 BHK | 3 | 3 | 45 |
| Building No. 178 · 2 BHK | 3 | 3 | 45 |
| Building No. 179 · 2 BHK | 3 | 3 | 47 |
| Building No. 180 · 2 BHK | 3 | 3 | 47 |
| Building No. 181 · 2 BHK | 3 | 3 | 47 |
| Building No. 182 · 2 BHK | 3 | 3 | 47 |
| Building No. 183 · 2 BHK | 3 | 3 | 47 |
| Building No. 184 · 2 BHK | 3 | 3 | 45-47 |
| Building No. 185 · 2 BHK | 3 | 3 | 47 |
| Building No. 186 · 2 BHK | 3 | 3 | 47 |
| Building No. 187 · 2 BHK | 3 | 3 | 49 |
| Building No. 44 · 4 BHK | 3 | 3 | 70 |
| Building No. 45 · 3 BHK | 3 | 3 | 64 |
| Building No. 46 · 3 BHK | 3 | 3 | 64 |
| Building No. 47 · 3 BHK | 3 | 3 | 64 |
| Building No. 48 · 3 BHK | 3 | 3 | 64 |
| Building No. 49 · 3 BHK | 3 | 3 | 64 |
| Building No. 50 · 3 BHK | 3 | 3 | 64 |
| Building No. 51 · 3 BHK | 3 | 3 | 82 |
| Building No. 52 · 3 BHK | 3 | 3 | 71 |
| Building No. 53 · 3 BHK | 3 | 3 | 64 |
| Building No. 54 · 3 BHK | 3 | 3 | 64 |
| Building No. 55 · 3 BHK | 3 | 3 | 64 |
| Building No. 56 · 3 BHK | 3 | 3 | 64 |
| Building No. 57 · 3 BHK | 3 | 3 | 64 |
| Building No. 58 · 3 BHK | 3 | 3 | 64 |
| Building No. 59 · 4 BHK | 3 | 3 | 70 |
| Building No. 60 · 3 BHK | 3 | 3 | 59 |
| Building No. 61 · 3 BHK | 3 | 3 | 64 |
| Building No. 62 · 3 BHK | 3 | 3 | 64 |
| Building No. 63 · 3 BHK | 3 | 3 | 64 |
| Building No. 64 · 3 BHK | 3 | 3 | 64-65 |
| Building No. 65 · 3 BHK | 3 | 3 | 64 |
| Building No. 66 · 3 BHK | 3 | 3 | 64 |
| Building No. 67 · 3 BHK | 3 | 3 | 64 |
| Building No. 68 · 3 BHK | 3 | 3 | 56 |
| Building No. 69 · 3 BHK | 3 | 3 | 64 |
| Building No. 70 · 3 BHK | 3 | 3 | 64 |
| Building No. 71 · 3 BHK | 3 | 3 | 64 |
| Building No. 72 · 3 BHK | 3 | 3 | 64 |
| Building No. 73 · 3 BHK | 3 | 3 | 64 |
| Building No. 74 · 2 BHK | 3 | 3 | 55 |
| Building No. 75 · 2 BHK | 3 | 3 | 45 |
| Building No. 76 · 2 BHK | 3 | 3 | 49 |
| Building No. 77 · 2 BHK | 3 | 3 | 49 |
| Building No. 78 · 2 BHK | 3 | 3 | 49 |
| Building No. 79 · 2 BHK | 3 | 3 | 49 |
| Building No. 80 · 2 BHK | 3 | 3 | 49 |
| Building No. 81 · 2 BHK | 3 | 3 | 49 |
| Building No. 82 · 2 BHK | 3 | 3 | 45 |
| Building No. 83 · 2 BHK | 3 | 3 | 41 |
| Building No. 84 · 2 BHK | 3 | 3 | 56 |
| Building No. 85 · 2 BHK | 3 | 3 | 56 |
| Building No. 86 · 2 BHK | 3 | 3 | 56 |
| Building No. 87 · 2 BHK | 3 | 3 | 56 |
| Building No. 88 · 2 BHK | 3 | 3 | 56 |
| Building No. 89 · 2 BHK | 3 | 3 | 56 |
| Building No. 90 · 2 BHK | 3 | 3 | 56 |
| Building No. 91 · 2 BHK | 3 | 3 | 41 |
| Building No. 92 · 2 BHK | 3 | 3 | 41 |
| Building No. 93 · 2 BHK | 3 | 3 | 56 |
| Building No. 94 · 2 BHK | 3 | 3 | 56 |
| Building No. 95 · 2 BHK | 3 | 3 | 56 |
| Building No. 96 · 2 BHK | 3 | 3 | 56 |
| Building No. 97 · 2 BHK | 3 | 3 | 56 |
| Building No. 98 · 2 BHK | 3 | 3 | 56 |
| Building No. 99 · 2 BHK | 3 | 3 | 56 |
| Villa No. 1 · VILLA | 3 | 3 | 30-44 |
| Villa No. 10 · VILLA | 3 | 3 | 30-44 |
| Villa No. 11 · VILLA | 3 | 3 | 30-44 |
| Villa No. 12 · VILLA | 3 | 3 | 30-44 |
| Villa No. 127 · VILLA | 3 | 3 | 30-35 |
| Villa No. 128 · VILLA | 3 | 3 | 30-35 |
| Villa No. 129 · VILLA | 3 | 3 | 33-35 |
| Villa No. 13 · VILLA | 3 | 3 | 30-44 |
| Villa No. 130 · VILLA | 3 | 3 | 33-36 |
| Villa No. 131 · VILLA | 3 | 3 | 34-38 |
| Villa No. 132 · VILLA | 3 | 3 | 29-40 |
| Villa No. 14 · VILLA | 3 | 3 | 30-44 |
| Villa No. 15 · VILLA | 3 | 3 | 30-44 |
| Villa No. 16 · VILLA | 3 | 3 | 41-60 |
| Villa No. 17 · VILLA | 3 | 3 | 30-44 |
| Villa No. 18 · VILLA | 3 | 3 | 30-44 |
| Villa No. 19 · VILLA | 3 | 3 | 30-44 |
| Villa No. 2 · VILLA | 3 | 3 | 30-44 |
| Villa No. 20 · VILLA | 3 | 3 | 30-44 |
| Villa No. 21 · VILLA | 3 | 3 | 30-44 |
| Villa No. 22 · VILLA | 3 | 3 | 30-44 |
| Villa No. 23 · VILLA | 3 | 3 | 30-44 |
| Villa No. 24 · VILLA | 3 | 3 | 30-44 |
| Villa No. 25 · VILLA | 3 | 3 | 33-48 |
| Villa No. 26 · VILLA | 3 | 3 | 22-35 |
| Villa No. 27 · VILLA | 3 | 3 | 30-38 |
| Villa No. 28 · VILLA | 3 | 3 | 30-38 |
| Villa No. 29 · VILLA | 3 | 3 | 30-38 |
| Villa No. 3 · VILLA | 3 | 3 | 30-44 |
| Villa No. 30 · VILLA | 3 | 3 | 30-38 |
| Villa No. 31 · VILLA | 3 | 3 | 30-38 |
| Villa No. 32 · VILLA | 3 | 3 | 30-38 |
| Villa No. 33 · VILLA | 3 | 3 | 30-38 |
| Villa No. 34 · VILLA | 3 | 3 | 30-38 |
| Villa No. 35 · VILLA | 3 | 3 | 22-36 |
| Villa No. 36 · VILLA | 3 | 3 | 30-38 |
| Villa No. 37 · VILLA | 3 | 3 | 30-38 |
| Villa No. 38 · VILLA | 3 | 3 | 30-38 |
| Villa No. 39 · VILLA | 3 | 3 | 30-38 |
| Villa No. 4 · VILLA | 3 | 3 | 30-44 |
| Villa No. 40 · VILLA | 3 | 3 | 30-38 |
| Villa No. 41 · VILLA | 3 | 3 | 30-38 |
| Villa No. 42 · VILLA | 3 | 3 | 30-38 |
| Villa No. 43 · VILLA | 3 | 3 | 22-35 |
| Villa No. 5 · VILLA | 3 | 3 | 30-44 |
| Villa No. 6 · VILLA | 3 | 3 | 30-44 |
| Villa No. 7 · VILLA | 3 | 3 | 30-40 |
| Villa No. 8 · VILLA | 3 | 3 | 30-44 |
| Villa No. 9 · VILLA | 3 | 3 | 30-44 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per sale deed |
| 2 | Boundary Wall As per approved plan |
| 3 | Road Work As per approved plan |
| 4 | Footpaths As per approved plan |
| 5 | Water Supply Including Drinking Water Facilities As per approved plan |
| 6 | Sewer System As per approved plan |
| 7 | Drain As per approved plan |
| 8 | Parks As per approved plan |
| 9 | Tree Planting As per approved plan |
| 10 | Design For Electric Supply Including Street Lighting As per approved plan |
| 11 | Community Buildings As per approved plan |
| 12 | Treatment and Disposal System of Sewage and Sullage water As per approved plan |
| 13 | Solid Waste Management And Disposal System As per approved plan |
| 14 | Water Conservation System As per approved plan |
| 15 | Energy Management System Including Use of Renewable Energy As per approved plan |
| 16 | Fire Protection And Fire Safety System As per approved plan |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per approved plan |
| 18 | Emergency Evacuation Services As per approved plan |
| 19 | Other Miscellaneous Work As per approved plan |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 15 Mar 2022.
Sanctioned by Ghaziabad Development Authority · 24,069 sqm of land · an approved plan of 181 blocks and 610 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 590/Zone5/2016 | 16 Mar 2017 | 15 Mar 2022 | 15 Mar 2022 | 29 Jun 2020 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 28 Dec 2020.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2019 | 31 Dec 2019 | — |
| 2 | 31 Dec 2019 | 29 Jun 2020 | — |
| 3 | 29 Jun 2020 | 28 Dec 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
38 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1200 | 2020 | — |
| 1201 | 760 | — |
| 1202 | 2480.79 | — |
| 1205 | 1621 | — |
| 1206 | 937 | — |
| 1207 | 1422 | — |
| 1208 | 1209 | — |
| 1211 | 1946 | — |
| 1209/2 | 1390 | — |
| 1166 | 1140 | — |
| 1167 | 1140 | — |
| 1170 | 890 | — |
| 1172 | 1390 | — |
| 1173/2 | 1520 | — |
| 1168 | 741.6 | — |
| 1169 | 741.6 | — |
| 1219 | 510 | — |
| 1250 | 890 | — |
| 1251 | 1320 | — |
| 1200, 1209/2,1205M,1206M,1207M,1208M,1211M | 4105 | Khasra |
| 1205M,1206M,1207M,1208M,, 1211M | 860 | Khasra |
| 1172M | 695 | Khasra |
14 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 23 May 2016.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 7818 | 28 Dec 2016 | self | — |
| 909 | 1 Mar 2017 | self | — |
| 761 | 20 Feb 2017 | self | — |
| 760 | 20 Feb 2017 | self | — |
| 910 | 1 Mar 2017 | self | — |
| 911 | 1 Mar 2017 | self | — |
| 818 | 22 Feb 2017 | self | — |
| 4991 | 15 Jul 2016 | self | — |
| 4621 | 14 Jul 2016 | self | — |
| 4660 | 15 Jul 2016 | self | — |
| 3373 | 23 May 2016 | self | — |
| 966 | 3 Mar 2017 | self | — |
| 967 | 3 Mar 2017 | self | — |
| 287 | 2 Mar 2017 | self | — |
| Sale deed · UP-029538531040446P The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 967 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3373 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 31 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 31 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 3 Aug 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 11 Nov 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Underground water tank |
| Fire safety (as filed with RERA) | N/R |
| Renewable energy | N/R |
| Other facilities | N/R |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
3 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
3 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2020-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Renowned Buildtech Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM16006 |
| PAN | AAGCR4240Q |
| CIN / TAN | U42400UP2013PTC057242 |
| Name of chairman | Shalender Sharma |
| Registered address | H-95, 2nd Floor, Sector-63, Noida |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | RENOWNED BUILDTECH PRIVATE LIMITEDBankDCB BANKBranchDCB BANK NEW DELHIA/C no.IFSCDCBL0000046 |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 73 (Under Registration - 1 ) → 74 (Under Registration - 2 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 72 (Under Registration - 0 ) → 73 (Under Registration - 1 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 5 Oct 2026 · 2 movements on record |
Common questions about Srishti
Is Srishti RERA registered?
Yes. Srishti is registered with UPRERA under registration number UPRERAPRJ7939, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Srishti been completed?
UPRERA still lists Srishti as Registered, so it is not shown as completed here. A completion certificate dated 12 Jul 2021 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Srishti?
Renowned Buildtech Private Limited is the promoter entity that filed Srishti with UPRERA (promoter RERA ID UPRERAPRM16006). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Srishti more time to complete?
UPRERA's record carries 3 completion extensions for Srishti, the latest running to 28 Dec 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Srishti have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Srishti located?
Srishti is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in Srishti?
The unit plan filed with UPRERA lists 4 BHK, 3 BHK, 2 BHK, 1 BHK, VILLA and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Srishti?
The approved unit plan filed with UPRERA runs from 7 to 82 m² of carpet area (about 78 to 886 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Srishti?
The approved unit plan describes 181 blocks and 610 units of which 541 are homes and 69 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Srishti?
About 103 units per acre: 610 planned units across 5.95 acres (24,069 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗