ASSOTECH CANOPY is a RERA-registered residential project by ASSOTECHLIMITED in Ghaziabad (RERA ID UPRERAPRJ922718). Registered with a completion deadline of 24 Oct 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ922718 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Jul 2021 |
| Project duration | 64 months |
| Address | GH-12, CROSSINGS REPUBLIK, DUNDAHERA, GHAZIABAD, GHAZIABAD, Uttar Pradesh, Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | Assotech Limited, H - 127, Sector - 63, Noida - 201301 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
GDA/LD/21-22/0127
3 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- valid to
Permit revalidated
Plotted Resi development/Plotted Housing/09040/GDA/LD/23-24/0885/23052025
- to
Extension granted
“Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 23 Sept 2021 |
| Original completion | 25 Jun 2026 |
| Revised completion | 24 Oct 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,41,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots BRICKED WALL WITH RCC COLUMNS IN BETWEEN, UPTO 1.80 METERS FROM INTERNAL ROADS |
| 2 | Boundary Wall BRICKED WALL WITH RCC COLUMNS IN BETWEEN, UPTO 1.80 METERS FROM INTERNAL ROADS |
| 3 | Road Work ROAD WIDTH 9.0 METERS AND 7.5 METERS.
100MM RCC OVER TWO LAYERS OF WBM (150+100 MM) THICKNESS |
| 4 | Footpaths 1.0 METER WIDE PEVER |
| 5 | Water Supply Including Drinking Water Facilities CPVC PIPE AS PER DESIGN PROVIDED BY MEP CONSULTANT |
| 6 | Sewer System UNDERGROUND SEWER LINE THROUGH HUME PIPES, CONNECTED WITH CROSSINGS REPUBLIK STP. |
| 7 | Drain BRICKED STRUCTURE WITH PERFORATED COVERS AS PER DESIGN PROVIDED BY MEP CONSULTANT |
| 8 | Parks LANDSCAPED GARDENS WITH KIDS PLAY AREA |
| 9 | Tree Planting BOTTLE PALMS, SHRUBS, BUSHES AND NATURAL GRASS. |
| 10 | Design For Electric Supply Including Street Lighting ARMERED CABLE AS PER DESIGN PROVIDED BY MEP CONSULTANT
MS POLE OF 6.0 METER HEIGHT WITH LED 100 WATTS |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water CONNECTED WITH CROSSINGS REPUBLIK STP. |
| 13 | Solid Waste Management And Disposal System DOOR TO DOOR COLLECTION SYSTEM |
| 14 | Water Conservation System RAIN WATER HARVESTING AS PER DESIGN PROVIDED BY MEP CONSULTANT |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System AS PER NBC NORMS |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services CONVENIENCE SHOPS |
| 18 | Emergency Evacuation Services AMBULANCE FACILITY FROM NEARBY HOSPITAL |
| 19 | Other Miscellaneous Work TEMPLE ON SITE |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 25 Jun 2026. 2 of them carry a revalidation, the latest valid to 25 Jun 2029.
Sanctioned by Ghaziabad Development Authority · 27,244 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Plotted development/01309/GDA/LD/21-22/0127/05052021 | 26 Jun 2021 | 25 Jun 2026 | 25 Jun 2027 | 25 Jun 2026 | — | |
| GDA/LD/21-22/0127 | 26 Jun 2021 | 25 Jun 2026 | 25 Jun 2030 | 25 Jun 2026 | 26 Jun 2021 valid to 25 Jun 2028 | |
| GDA/LD/21-22/0127 | 26 Jun 2021 | 25 Jun 2026 | 25 Jun 2030 | 25 Jun 2026 | 26 Jun 2025 valid to 25 Jun 2029 as Plotted Resi development/Plotted Housing/09040/GDA/LD/23-24/0885/23052025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 24 Oct 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 25 Jun 2026 | 24 Oct 2026 | Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026 |
Land & documents
34 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 334 | 1425 | Khasra |
| 343 | 1140 | Khasra |
| 615 | 1045 | Khasra |
| 620 | 3600 | Khasra |
| 623 | 115 | Khasra |
| 624 | 1140 | Khasra |
| 625 | 2400 | Khasra |
| 626 | 1260 | Khasra |
| 628 | 600 | Khasra |
| 629 | 245 | Khasra |
| 630 | 2530 | Khasra |
| 631 | 1260 | Khasra |
| 632 | 2400 | Khasra |
| 633 | 1260 | Khasra |
| 634 | 1390 | Khasra |
| 635 | 1520 | Khasra |
| 636 | 140 | Khasra |
| 637 | 230 | Khasra |
| 638 | 405 | Khasra |
| 651 | 1195 | Khasra |
| 627 | 1944.08 | Khasra |
| Registry document · 735 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 8426 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11068 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7987 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1072 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2636 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 18280 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 4787 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4787 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · Reply to Queries The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 19 Jul 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 5 Aug 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 5 Aug 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 5 Aug 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 19 Jul 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 19 Jul 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 19 Jul 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 5 Aug 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 5 Aug 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 5 Aug 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 5 Aug 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 5 Aug 2021 ↗ |
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 38.32% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 43.45% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 61.79% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 70.94% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ASSOTECHLIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM12327 |
| PAN | AABCA0909N |
| CIN / TAN | U45201DL1996PLC078063 |
| Name of chairman | SANJEEV SRIVASTVA |
| Registered address | Assotech Limited, H - 127, Sector - 63, Noida - 201301 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | Crossings Infrastructure Pvt Ltd |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM8653 |
| Applicant type | Company |
| PAN | AACCC5615Q |
| CIN / TAN | U45203DL2005PTC134505 |
| Name of chairman | Sanjeev Srivastva |
| Registered address | Crossings Republik Township, (Glass Gate), Near ABES Engg. College, NH-24, Dundahera, Ghaziabad-2010 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | ASSOTECH LIMITED CANOPY COLLECTION ACCOUNTBankState Bank of IndiaBranchCollectorate CompoundBranch addressCollectorate Compound, Rajnagar, Ghaziabad - 201002Branch districtGautam Buddha NagarA/C no.IFSCSBINO007873 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Assotech Limited Separate Account For Assotech CanopyBankState Bank of IndiaBranchCollectorate CompoundBranch addressCollectorate Compound, Rajnagar, Ghaziabad - 201002Branch districtGautam Buddha NagarA/C no.IFSCSBINO007873 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Assotech Transaction Limited Account For Assotech CanopyBankState Bank of IndiaBranchCollectorate CompoundBranch addressCollectorate Compound, Rajnagar, Ghaziabad - 201002Branch districtGautam Buddha NagarA/C no.IFSCSBINO007873 |
What has changed on this record
4 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 142 (Under Registration - 1 ) → 142 (Under Registration - 0 ) changed in Estanzo’s record | 25 Sept 2026 |
| Revised completion date on file | 2026-10-25 → 2026-10-24 changed in Estanzo’s record | 7 Sept 2026 |
| Completion extension no. 1 — extended upto | 2026-10-25 → 2026-10-24 changed in Estanzo’s record | 7 Sept 2026 |
| Revised completion date on file | 2026-06-25 → 2026-10-25 changed in Estanzo’s record | 5 Sept 2026 |
| Revised completion date on file | changed in Estanzo’s record · 7 Sept 2026 · 2 movements on record |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 25 Sept 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about ASSOTECH CANOPY
Is ASSOTECH CANOPY RERA registered?
Yes. ASSOTECH CANOPY is registered with UPRERA under registration number UPRERAPRJ922718, registered on 23 Sept 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for ASSOTECH CANOPY?
The completion date filed with UPRERA is 24 Oct 2026. No completion certificate is on record yet.
Who is the builder of ASSOTECH CANOPY?
ASSOTECHLIMITED is the promoter entity that filed ASSOTECH CANOPY with UPRERA (promoter RERA ID UPRERAPRM12327). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted ASSOTECH CANOPY more time to complete?
UPRERA's record carries 1 completion extension for ASSOTECH CANOPY, the latest running to 24 Oct 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does ASSOTECH CANOPY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ASSOTECH CANOPY located?
ASSOTECH CANOPY is registered in Ghaziabad, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗