Stellar Okas Golf View is a RERA-registered residential project by LUCKNOW GOLF VIEW PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ138199). Registered with a completion deadline of 31 Dec 2022.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ138199 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 29 Dec 2019 |
| Project duration | 37 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | 61-63,Panchkuian Road,Second Floor,New Delhi-110001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
MAP20190816163439187
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 16 Feb 2021 |
| Original completion | 31 Dec 2022 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 12 Sept 2021 |
| Registration fee | ₹3,73,500 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots By putting demarcation pegs |
| 2 | Boundary Wall Side and Rear Boundary walls are made in Pre-cast Concrete Post and Slats.The front Compound Wall is in Brick Masonary as per Architects design with MS Enamel painted Grills as per Architects design near Main Entrance only and balance part in Pre-Cast Concrete Post and slats.The Main Gate is MS,as per Architects design |
| 3 | Road Work 2 Layers of Granualr Sub Base(GSB) provided duly compacted with vibratory roller of min.10MT after dressing of soil by removing top layer and finished with 60mm thickness concrete pavers of M40 grade with weight carrying capacity of 80Tonnes |
| 4 | Footpaths One Layer of 100mm thickness GSB under layer after due compaction of earth and 75mm PCC with finishing of 40mm concrete Pavers of M30 grade demarcated with M40 concrete grade Curb stone |
| 5 | Water Supply Including Drinking Water Facilities UPVC based water lines with UPVC pipes of schedule 40 used as per ASTM standard D-1785. Main Water supply from Ansal Township. Under Ground Tank Facility also provided. |
| 6 | Sewer System DWC piping system used for connecting Masonary Manholes as per IS Code 16098. The road cross over pipes used are in HDP pipes as per IS code 4984.All pipes are lay to slope as per IS codes 1742 |
| 7 | Drain DWC piping system used for connecting Masonary Manholes as per IS Code 16098. The Road cross over pipes used are in HDP pipes as per IS code 4984.All pipes are lay to slope as per IS Codes 1742. |
| 8 | Parks Are being developed as per the approved plan with children play area,Herb Graden etc. |
| 9 | Tree Planting Tree planting as per the approved plan |
| 10 | Design For Electric Supply Including Street Lighting Under Ground Electric Supply cable through under ground RCC drains.HT Cables-3core x 120mm Armoured Aluminium
Cables
LT cable 3.5corex300mm and 3.5 core x 150mm,Aluminium armoured cables(From Transformer to Feeder)
From Feeder to Plots 4core x10mm and 4 core x16mm armoured Aluminium cables
Street light Main feeder to sub feeder 3.5Core x25mm and Corex16mm.
LED based Street lights -The Poles are Mild steel PU painted poles as per bespoke design to match the overall design intent. |
| 11 | Community Buildings NA- Part of Sushant Hi-tech township |
| 12 | Treatment and Disposal System of Sewage and Sullage water Connection being done to Ansal sushant HitechTownship connected to STP Provided by Sushant Hitech township |
| 13 | Solid Waste Management And Disposal System Area has been demarcated and collection and disposal will be as per the act |
| 14 | Water Conservation System Roof Top Rainwater harvesting system has been planned with dedicated strom water sytsem for the plots connected to Rain water harvesting pits |
| 15 | Energy Management System Including Use of Renewable Energy Solar Power Street lights provided |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per the Sushant Hitech Township provisions |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Registered agents
8 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Abhay Shukla | UPRERAAGT18855 |
| 2 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 3 | BRIXWELL REALTY & CONSTRUCTION LLP | UPRERAAGT15068 |
| 4 | Clicbrics Technologies Private Limited. Formerly Redbrics ITES India Pvt Ltd | UPRERAAGT10906 |
| 5 | JITENDRA KUMAR YADAV | UPRERAAGT15636 |
| 6 | Pankaj Mittal | UPRERAAGT13523 |
| 7 | Shailendra Kumar Singh | UPRERAAGT19422 |
| 8 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 20 Oct 2025.
Sanctioned by Lucknow Development Authority · 73,669 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MAP20190816163439187 | 21 Oct 2020 | 20 Oct 2025 | 20 Oct 2025 | 31 Dec 2022 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH4,SEC-H,Pocket-1 | 74020.15 | Plot |
| Sale deed · 7357 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11836 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 8 Feb 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 8 Jan 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 8 Jan 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 8 Jan 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 8 Jan 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 8 Jan 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 8 Jan 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 8 Jan 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 8 Jan 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 9 Jan 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 8 Jan 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 8 Jan 2021 ↗ |
Quarterly progress reports
10 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
10 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | LUCKNOW GOLF VIEW PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM131979 |
| PAN | AADCL5608D |
| CIN / TAN | DELL07999F |
| Name of chairman | Akshay Mohan Sethi |
| Registered address | 61-63,Panchkuian Road,Second Floor,New Delhi-110001 |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | LUCKNOW GOLF VIEW PRIVATE LIMITEDBankKOTAK MAHINDRA BANK LTDBranchNOIDAA/C no.IFSCKKBK0005032 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Stellar Okas Golf View
Is Stellar Okas Golf View RERA registered?
Yes. Stellar Okas Golf View is registered with UPRERA under registration number UPRERAPRJ138199, registered on 16 Feb 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Stellar Okas Golf View been completed?
UPRERA still lists Stellar Okas Golf View as Registered, so it is not shown as completed here. A completion certificate dated 12 Sept 2021 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Stellar Okas Golf View?
LUCKNOW GOLF VIEW PRIVATE LIMITED is the promoter entity that filed Stellar Okas Golf View with UPRERA (promoter RERA ID UPRERAPRM131979). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Stellar Okas Golf View have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Stellar Okas Golf View located?
Stellar Okas Golf View is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗