Spring Grand

UPRERACompleted

Spring Grand is a RERA-registered mixed project by SPRING INFRASTRUCTURES in Lucknow (RERA ID UPRERAPRJ127617). RERA status: Completed on 20 Jan 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Completed.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ127617
Project categoryMixed
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start12 Jan 2022
Project duration48 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typePartnership Firm
Applicant addressCP-138 3rd Floor Viraj Khand Gomti Nagar Lucknow Uttar Pradesh 226010
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Plotted Resi development/Plotted Housing/02379/LDA/LD/21-22/0252/22062021

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Feb 2022
Original completion31 Dec 2024
Revised completion31 Dec 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary20 Jan 2026
Registration fee₹1,69,500
Sanctioning authorityLucknow Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Deepankar Sharma
License CA/2014/64728
4/119, Virat Khand, Gomti Nagar, Lucknow-226010
Engineer
Satya Nam Sharan
1/353, Vinamra Khand, Gomti Nagar, Lucknow-226010
Contractor
Development by promoter itself
Kh. No. 430 and 431, Vill Ahmamau, Gomti Nagar, Sector-7, Lucknow, UP-226010
Sr.Development work declared to RERA
1Demarcation of Plots
Plot demarcation is one of the earliest activity it defines property boundaries, parcel shapes and plot location. That the owner of the property is interested to know concerns the boundaries of his/her plot/property. In this project all plots are well demarcated as per approved plan and easy for physical handing over the plots.
2Boundary Wall
A boundary wall is "any wall constructed on, above, or over the physical border between two properties so that is stands on or occupies space on both properties at least partially". The boundary wall offers the property and its occupants a sense of protection and security. Height Specification of the boundary wall of this project is "height of the boundary wall will be 2100MM and width of the boundary wall will be 230MM.
3Road Work
Project has 9 mtrs 7.5 mtrs internal road. the approach to the plot in throughout of the site is well managed for vehicle/pedestrian movement has been designed to minimize conflicts between vehicles and pedestrians. Maximum utilization of the site has been planned. Every plot is provided with approach from vehicular road. Pedestrian pathways which are traffic free connect the plots with the road as well as make the movement uninterrupted. In this project we provide metal road with bituminous cove/ high strength concrete pavers/tiles will be used as per designed by the architect for internal road. In this project one entry gate from 45 mtrs wide road and one exit gate from 12 mtrs wide road (including nala).
4Footpaths
Comfort, Continuity, and safety are the governing criteria for the design and construction of pedestrian facilities. A footpath is a type of route designed just for pedestrians and not for other types of traffic such as cars or bicycles. We will provide footpath as per design and the requirement .
5Water Supply Including Drinking Water Facilities
Safe drinking water, sanitation, and hygiene are fundamental to improving standards of living for people. In our project ground water will be used. End user shall use their individual RO system as per their requirement. All plot owners will mandatory, have ball cock in their water tank to stop overflow and avoid wastage of water.
6Sewer System
The sewerage system is an essential part of every human settlement. Since combined sewerage system invariably suffers from main disadvantage of sluggish flow during most period of the year leading to deposition of sewage solids creating foul and offensive conditions, hence sewerage and drainage systems shall be proposed separately. Since, it is both difficult and uneconomical to augment the capacity of the sewerage system later, the proposed sewers shall be designed for maximum expected discharge to cater the requirement of the ultimate development of the said project. Sewage Treatment plant shall be proposed for the treatment of sewage that would generate in the Normal housing. Sewage treatment plants process and treat wastewater/sewage, breaking it down into a cleaner "effluent" that can be returned back to nature in a safer, eco-friendly form. they help restore groundwater balance, curb diseases and stop degradation and pollution of the environment. Centralized sewerage system shall be provided to reduce the fresh water demand of the project, waste water from the Normal Housing units will be treated in a STP and recycled for landscaping.
7Drain
A detailed storm water drainage system and water harvesting procedures are proposed to recharge groundwater. The prime activities for providing Drainage System comprise of; Internal Drainage System. Ultimate Disposal Norms Adopted. In order to determine total run off, Rational formula shall be used . Underground water recharge pits with perforated filter media shall be used for rain water harvesting. Coefficient of run off shall be adopted as per Manual on Rain harvesting and conservation.
8Parks
There is four lush green parks, green space and open space in the form of park and garden for every age group as per architect plan. There are several instances where the green cover has been reported the ambient temperatures.
9Tree Planting
There will be various types of plants as per architect plan. Evergreen plants are proposed to be planted inside the site. Parks shall be developed by the project prominent. Variety of plants shall be provided for the project for along with the roads/ walkway and also in green area.
10Design For Electric Supply Including Street Lighting
We have designed the system as per local electricity board along with transformer, HT Panel, LT Panel, Feeder pillar and DG back for common service like external lighting, STP, Pump room etc.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
Sewage treatment plant (STP) will be provided as per architect plan. An sewage network shall collect the sewage and flow by gravity to the proposed sewage treatment plant. Sludge generated from STP shall be rich in organic content and act as excellent fertilizer.
13Solid Waste Management And Disposal System
There is proper garbage collection area as per architect plan for the solid waste management. Project will adopt a systematic approach for solid waste collection and disposal. The solid waste shall be first segregated as per plastic, glass. paper and other waste separately.
14Water Conservation System
A well designed rain water harvesting system as per architect plan shall be provided for parks to conserve water. The project is also committed towards conservation of water, this includes use of treated water, rainwater harvesting, provision of low water flow fixtures and raising awareness on means of water conservation.
15Energy Management System Including Use of Renewable Energy
Not Applicable
16Fire Protection And Fire Safety System
Not Applicable
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not Applicable
18Emergency Evacuation Services
Not Applicable
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 11 Jan 2027.

Sanctioned by Lucknow Development Authority · 21,577 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Plotted Resi development/Plotted Housing/02379/LDA/LD/21-22/0252/2206202112 Jan 202211 Jan 202711 Jan 203031 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 31 Dec 2025.

#Granted fromExtended uptoNote
131 Dec 202431 Dec 2025—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Kh. 430, 431 Vill Ahmamau21577Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 24959
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 24954
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 25956
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 16533
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2906
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4946
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9498
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13614
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 20390
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 21133
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4041
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 242
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New9 Feb 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New9 Feb 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New13 Jan 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New13 Jan 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New14 Jan 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New14 Jan 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Jan 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New31 Jan 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New31 Jan 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Jan 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Jan 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New14 Jan 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New31 Jan 2022 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2025-Q3.

QuarterConstructionCertificates
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q296%CA ↗ · Arch ↗ · Eng ↗
2025-Q397%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSPRING INFRASTRUCTURES
RolePromoter · current
RERA IDUPRERAPRM160272
PANACJFS1880M
CIN / TANLKNS14177C
Registered addressCP-138 3rd Floor Viraj Khand Gomti Nagar Lucknow Uttar Pradesh 226010
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Spring Infrastructures - Collection Account for Spring GrandBankHDFC BankBranchVibhuti KhandBranch addressTC-13-2-A, Vibhuti Khand, Gomti Nagar, Lucknow-226010Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0004805
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Spring Infrastructures - Separate Bank Account for Spring GrandBankHDFC BankBranchVibhuti KhandBranch addressTC-V-13-2-A, Vibhuti Khand, Gomti Nagar, Lucknow-226010Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0004805
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Spring Infrastructures - RERA Transaction Account for Spring GrandBankHDFC BankBranchVibhuti KhandBranch addressTC-V-13-2-A, Vibhuti khand, Gomti Nagar, Lucknow-226010Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0004805
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Spring Grand

Is Spring Grand RERA registered?

Yes. Spring Grand is registered with UPRERA under registration number UPRERAPRJ127617, registered on 21 Feb 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has Spring Grand been completed?

UPRERA lists Spring Grand as completed, with a completion certificate dated 20 Jan 2026, against a filed deadline of 31 Dec 2025.

Who is the builder of Spring Grand?

SPRING INFRASTRUCTURES is the promoter entity that filed Spring Grand with UPRERA (promoter RERA ID UPRERAPRM160272). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Spring Grand more time to complete?

UPRERA's record carries 1 completion extension for Spring Grand, the latest running to 31 Dec 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Spring Grand have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Spring Grand located?

Spring Grand is registered in Lucknow, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗