AZURE SHOP ONE is a RERA-registered commercial project by AZURE INFRATECH PRIVATE LIMITED in SECTOR 11 VRINDAVAN YOJNA LUCKNOW, Lucknow (RERA ID UPRERAPRJ764090). Registered with a completion deadline of 1 Nov 2029.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ764090 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Jun 2025 |
| Project duration | 54 months |
| Address | 11 COMM/103, SECTOR 11 VRINDAVAN YOJNA LUCKNOW, Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | D 2/122 VIBHUTI KHAND GOMTI NAGAR LUCKNOW |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
HIGH RISK/UPAVP/BP/24-25/0901/021124
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 24 Jun 2025 |
| Original completion | 1 Nov 2029 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹16,620 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- SHOP180 99%
- OTHER1 1%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 1 | 309 |
| SHOP | 180 | 17-27 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| AZURE SHOP ONE · OTHER, SHOP | 5 | 181 | 17-27 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots OUR PLOT IS SINGLE PLOT MEASURING 831.60 SQMT. THE LENGHT OF PLOT IS 38.50MTR AND WIDTH IS 21.60 MTR . THE SAID PROPERTY IS DEVELOPED BY UTTAR PRADESH AWAS EVAM VIKAS PARISHAD. THERE IS ALREADY DEMARCATION DONE BY PARISHAD . |
| 2 | Boundary Wall THE SAID PROJECT IS COMMERCIAL AND THE PLOT IS COVERED WITH ROADS BY THREE SIDES. SO BRICK BOUNDARY WALL OF 1.5 MTR HEIGHT WILL BE CONSTRUCTED IN LENGHT SIDE WITH OTHERS PLOT WHICH LENGTH WILL BE 38.50 MTR. AT THE ROAD SIDES 1.5 HEIGHT MILD STEEL RAILING WILL BE PROVIDED WHICH LENGH WILL BE 81.7 MTR. |
| 3 | Road Work THERE ARE ALREADY ROADS EXIST FROM ALL THREE SIDES OF THE PLOT. FRONT ROAD IS 45MTR WIDE, SIDE ROAD IS 18MTR WIDE AND BACK ROAD IS 9 MTR WIDE. IT IS SUFFICIENT FOR APPROACH THE BUILDING FOR SHOPPING AND FIRE VEHICLES. |
| 4 | Footpaths THE SAID PLOT AREA IS 831.60 SQMT AND GROUND FLOOR COVERED AREA IS 330.15 SQMT. IN REST AREAS AROUND 500 SQMT. INTERLOCKING WILL BE PROVIDED WITH PLAIN CONCRETE. |
| 5 | Water Supply Including Drinking Water Facilities ALL WATER SUPPLY FOR DRINKING WILL BE PROVED THROUGH CPVC PIPE CONNECTED FROM OVER HEAD TANK CAPACITY WITH 30KL. |
| 6 | Sewer System THE SEWERAGE SYSTEM WILL BE PROVIDED BY INSTALLING 200 MM PVC PIPE AROUND THE BUILDING DULY EMBEDED IN CEMENT CONCRETE OF RATIO 1.5.10 WITH CEMENT , COURSE SAND AND 40MM GRITT MANHOLE AND CHAMBERS AT REGULAR INTERVALS LAID IN WITH GRADIENT OF 1 ;100. THE ULTIMATE DISCHARGE WILL BE CONNECTED TO THE MAIN SEWER LINE PROVIDED BY UTTAR PRADESH AWAS EVAM VIKAS PARISHAD. |
| 7 | Drain THE DRAINAGE SYSTEM WILL BE PROVIDED AROUND THE BUILDING FOR PROPER DRAIN OF WATER. WASTE WATER FROM THE BATHROOMS WILL BE DIRECTED TO THE WATER DRAINAGE CHANNEL THROUGH 100 MM DIA PVC PIPE DULY EMBEDED IN CEMENT CONCRETE WITH GULLY TRAP AND INSPECTION CHAMBERS AT REGULAR INTERVALS WITH GRADIENT OF 1;100. THE ULTIMATE DISCHARGE WILL BE CONNECTED TO THE MAIN DRAINAGE LINE PROVIDED BY UTTAR PRADESH AWAS EVAM VIKAS PARISHAD. |
| 8 | Parks NOT APPLICABLE. |
| 9 | Tree Planting TO ENHANCE THE OVERALL COMMERCIAL LOOK OF THE PROJECT AREA, WE WILL PLANT 28 NOS OF LARGE TREES. WE WILL PLANT SMALL PLANTS ALSO AS PER BUILDING BYE LAWS AND LOOK. |
| 10 | Design For Electric Supply Including Street Lighting WE WILL DESIGN AND EMPLEMENT THE SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS SET BY THE LOCAL ELECTRICITY BOARD . 10 NOS OF STREETLIGHT AND EXTERNAL LIGHTS WILL BE INSTALLED ALONGH WITH ROADS AND FOOTPATHS . ADDITIONALY , WE WILL PROVIDE TRANSFORMER (CAPACITY 250 KVA) AND DIESEL GENERATOR SET TO MEET THE ELECTRICITY DEMAND OF THE BUILDING. |
| 11 | Community Buildings NOT APPLICABLE |
| 12 | Treatment and Disposal System of Sewage and Sullage water NOT APPLICABLE |
| 13 | Solid Waste Management And Disposal System NOT APPLICABLE |
| 14 | Water Conservation System RAIN WATER HARVESTING SYSTEM WILL BE PROVIDED FOR WATER CONSERVATION . THE ROOFTOP RAINWATER WILL BE HARVESTED TO RECHARGE THE GROUND WATER LEVEL. THE SYSTEM SHALL HAVE PROVISION FOR PRE FILTERATION OF RAINWATER BEFORE IT IS DISCHARGED FOR RECHARGING. THE RECHARGE WILL BE DESIGNED FOR 350 SQMT. ROOFTOP AREA. |
| 15 | Energy Management System Including Use of Renewable Energy SOLAR PANELS AND SOLAR WATER HEATERS WILL BE PROVIDED FOR ENERGY MANAGEMENT. THIS WILL HELP WITH ENERGY SAVING AND REDUCE CARBON FOOTPRINTS. |
| 16 | Fire Protection And Fire Safety System ALL FIRE SAFETY NORMS WILL FOLLOWED ACCORDING TO THE NATIONAL BUILDING CODE AND WITH THE APPROVALS FROM THE FIRE DEPARTMENT WILL BE TAKEN. PROVISION OF 02 FIRE EXTINGUISERS , FIRST HOSE REEL, WET RISER SYSTEM , SPRINKLER SYSTEM , MANUALLY OPERATED FIRE ALARM SYSTEM , AUTOMATIC DETECTION SYSTEM HAS BEEN MADE FOR FIRE SAFETY AND ALSO A 10KL OVERHEAD TANK WILL BE CONSTRUCTED. 01 NOS OF 100KL UNDER GROUND TANK WILL BE CONSTRUCTED WITH YARD HYDRANT FOR FIRE SAFETY . |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NOT APPLICABLE |
| 18 | Emergency Evacuation Services STAIRCASE IS PROVIDED FOR THE EMERGENCY EVACUATION SERVICES. THE BUILDING HAS A 1.5 MTR WIDE STAICASE DIRECTLY CONNECTED TO THE GROUND LEVEL AT THE GROUND LEVEL 3.0 MTR WIDE PASSAGE ARE PROPOSED AROUND ALL SIDES OF BUILDING FOR PROPER EVACUATION. |
| 19 | Other Miscellaneous Work NOT APPLICABLE |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 21 Nov 2029.
Sanctioned by U.P. Awas Evam Vikas Parishad · 831 sqm of land · an approved plan of 1 block and 181 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| HIGH RISK/UPAVP/BP/24-25/0901/021124 | 22 Nov 2024 | 21 Nov 2029 | 20 Nov 2031 | 1 Nov 2029 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 11/COM-103 | 831.60 | Plot |
| Sale deed · 21624 The registered deed by which the promoter bought the land. | PDF ↗ |
| Allotment letter from the authority · 1701 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · IN UP55582320949896X The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 24 May 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 14 Apr 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 14 Apr 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 30 Apr 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 14 Apr 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 14 Apr 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 25 Apr 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 14 Apr 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 14 Apr 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 14 Apr 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 14 Apr 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 14 Apr 2025 ↗ |
| General body resolution The resolution authorising an apartment owners’ association to act as the registering entity. | New | 28 Apr 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 24 May 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 30 Apr 2025 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 18.09% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 23% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 30% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 36% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | AZURE INFRATECH PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM348034 |
| PAN | ABACA4774D |
| CIN / TAN | LKNA20082G |
| Name of chairman | BRIJ BEHARI LAL |
| Registered address | D 2/122 VIBHUTI KHAND GOMTI NAGAR LUCKNOW |
| RERA contact | |
| Registered since | 2025 |
| Legal name | SHAHJAHAN KHATOON |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 12/668 SECTOR-12 INDIRA NAGAR LUCKNOW |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | AZURE INFRATECH PVT LTD COLLECTION ACCOUNT FOR AZURE SHOP ONEBankICICI BANKBranchMAHANAGAR LUCKNOWBranch addressB-340 SECTOR B MAHANAGAR LUCKNOWBranch districtLucknowA/C no.IFSCICIC0001048Branch emailku.sharma@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | AZURE INFRATECH PVT LTD SEPERATE ACCOUNT FOR AZURE SHOP ONEBankICICI BANKBranchMAHANAGAR LUCKNOWBranch addressB-340 SECTOR B MAHANAGAR LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0001048 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | AZURE INFRATECH PVT LTD TRANSACTION ACCOUNT FOR AZURE SHOP ONEBankICICI BANKBranchMAHANAGAR LUCKNOWBranch addressB-340 SECTOR B MAHANAGAR LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0001048 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about AZURE SHOP ONE
Is AZURE SHOP ONE RERA registered?
Yes. AZURE SHOP ONE is registered with UPRERA under registration number UPRERAPRJ764090, registered on 24 Jun 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for AZURE SHOP ONE?
The completion date filed with UPRERA is 1 Nov 2029. No completion certificate is on record yet.
Who is the builder of AZURE SHOP ONE?
AZURE INFRATECH PRIVATE LIMITED is the promoter entity that filed AZURE SHOP ONE with UPRERA (promoter RERA ID UPRERAPRM348034). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does AZURE SHOP ONE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is AZURE SHOP ONE located?
AZURE SHOP ONE is registered in SECTOR 11 VRINDAVAN YOJNA LUCKNOW, Lucknow, as filed with UPRERA.
What configurations are available in AZURE SHOP ONE?
The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in AZURE SHOP ONE?
The approved unit plan filed with UPRERA runs from 17 to 309 m² of carpet area (about 186 to 3,328 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in AZURE SHOP ONE?
The approved unit plan describes 1 block and 181 units of which 1 are homes and 180 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is AZURE SHOP ONE?
About 881 units per acre: 181 planned units across 0.21 acres (831 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗