Surya Shyam

UPRERARegistered

Surya Shyam is a RERA-registered residential project by Raj Ganga Builders in Lucknow (RERA ID UPRERAPRJ4454). Registered with a completion deadline of 15 Aug 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ4454
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start17 Feb 2014
Original start17 Feb 2014
Project duration90 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typePartnership Firm
Applicant address13/20, Indira Nagar, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    506

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Aug 2017
Original completion16 Feb 2021
Revised completion15 Aug 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,01,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors215 · 4 · 9 (units from plan)
  • 2 BHK111 52%
  • 3 BHK104 48%
ConfigurationUnitsCarpet area
2 BHK11182-86
3 BHK104104-110
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 2 BHK, 3 BHK95182-110
B · 2 BHK, 3 BHK94583-104
E · 2 BHK, 3 BHK96883-106
F · 2 BHK, 3 BHK95184-109
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Rajat Kant Mittal
License CA/90/13242
M/s Udbhav, 3rd Floor, Rohit Bhawan, Sapru Marg, Lucknow
Engineer
Ashok Kumar Gupta
2/127, Vijay Khand, Gomnti Nagar, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
COMPLETED
2Boundary Wall
COMPLETED
3Road Work
WORK IN PROGRESS
4Footpaths
WORK IN PROGRESS
5Water Supply Including Drinking Water Facilities
WORK IN PROGRESS
6Sewer System
WORK IN PROGRESS
7Drain
WORK IN PROGRESS
8Parks
WORK IN PROGRESS
9Tree Planting
WORK IN PROGRESS
10Design For Electric Supply Including Street Lighting
COMPLETED
11Community Buildings
WORK IN PROGRESS
12Treatment and Disposal System of Sewage and Sullage water
WORK IN PROGRESS
13Solid Waste Management And Disposal System
WORK IN PROGRESS
14Water Conservation System
WORK IN PROGRESS
15Energy Management System Including Use of Renewable Energy
WORK IN PROGRESS
16Fire Protection And Fire Safety System
WORK IN PROGRESS
17Social Infrastructure And Other Public Amenities Including Public Health Services
WORK IN PROGRESS
18Emergency Evacuation Services
WORK IN PROGRESS
19Other Miscellaneous Work
WORK IN PROGRESS
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Jun 2018.

Sanctioned by U.P. Awas Evam Vikas Parishad · 19,219 sqm of land · an approved plan of 4 blocks and 215 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
50611 Jun 201310 Jun 201810 Jun 202116 Feb 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 15 Aug 2021.

#Granted fromExtended uptoNote
116 Feb 202115 Aug 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

26 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
38111499—
38111499—
389660—
3905060—
381s11499Khasra
3905060Khasra
3902660Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

9 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 27 Aug 2010.

Registry no.DateTypeArea
1/11928/337/376/1549330 Aug 2010self—
1/14637/325/340/1568824 Aug 2012self—
1/11923/1/10/1541027 Aug 2010self—
1/11927/359/376/1548030 Aug 2010self—
1/36/317/*324/146324 Aug 2012self—
1/14552/1/38/1439128 Jul 2012self—
1/14552/39/94/1439228 Jul 2012self—
1/14552/95/116/1439328 Jul 2012self—
1/11928/261/300/1549130 Aug 2010self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1422-1427
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1422-1427
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1422-1427
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 1/14552/1/38/14391
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/11923/1/10/15410
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/11928/337/376/15493
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/11927/359/376/15480
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/14637/325/340/15688
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/14637/325/340/15688
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/14637/307/324/15687
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/11923/41/64/15411
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/11923/41/64/15411
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Yes
Renewable energyYes (Partial)

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

6 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

6 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameRaj Ganga Builders
RolePromoter · current
RERA IDUPRERAPRM10288
PANAAOFR8878B
CIN / TANLKNR07560A
Registered address13/20, Indira Nagar, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Raj Ganga BuildersBankHDFC BankBranchAshiyanaA/C no.IFSCHDFC0001943
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Surya Shyam

Is Surya Shyam RERA registered?

Yes. Surya Shyam is registered with UPRERA under registration number UPRERAPRJ4454, registered on 3 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Surya Shyam?

The completion date filed with UPRERA is 15 Aug 2021. No completion certificate is on record yet.

Who is the builder of Surya Shyam?

Raj Ganga Builders is the promoter entity that filed Surya Shyam with UPRERA (promoter RERA ID UPRERAPRM10288). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Surya Shyam show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted Surya Shyam more time to complete?

UPRERA's record carries 1 completion extension for Surya Shyam, the latest running to 15 Aug 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Surya Shyam have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Surya Shyam located?

Surya Shyam is registered in Lucknow, as filed with UPRERA.

What configurations are available in Surya Shyam?

The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Surya Shyam?

The approved unit plan filed with UPRERA runs from 82 to 110 m² of carpet area (about 886 to 1,181 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Surya Shyam?

The approved unit plan describes 4 blocks and 215 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Surya Shyam?

About 45 units per acre: 215 planned units across 4.75 acres (19,219 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗