THE GRAND EMPORIO

UPRERARegistered

THE GRAND EMPORIO is a RERA-registered commercial project by SHRINATH JI PROMOTERS AND DEVELOPERS in VILLAGE NOOR NAGAR, RAJ NAGAR EXTENSION, Ghaziabad (RERA ID UPRERAPRJ257958). Registered with a completion deadline of 26 Feb 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ257958
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start8 May 2026
Project duration58 months
AddressKHASRA NO. 1216,1217,1218/1392, VILLAGE NOOR NAGAR, RAJ NAGAR EXTENSION, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typePartnership Firm
Applicant addressR-13/72, RAJ NAGAR, GHAZIABAD, UP-201002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    HOTEL/10194/GDA/BP/25-26/0579/27022026

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered8 Jul 2026
Original completion26 Feb 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹51,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors472 · 1 · 18 (units from plan)
Homes · commercial units355 · 117 (shops and offices filed in the same plan)
  • OTHER355 75%
  • SHOP117 25%
ConfigurationUnitsCarpet area
OTHER35517-43
SHOP1178-34
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
HOTEL BUILDING · OTHER, SHOP184728-43
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANUJ AGARWAL
License CA/96/19503
A-244, KAUSHAMBI, GHAZIABAD
Engineer
NNC DESIGN INTERNATIONAL CONSULTING STRUCTURAL ENGINEERS
G-70, 2ND FLOOR, JASWANT PLAZA, NEAR KALINDI KUNJ MAIN SARITA VIHAR ROAD, OKHLA, NEW DELHI -110025
Contractor
SHRINATH JI PROMOTERS AND DEVELOPERS
R-13/72, RAJ NAGAR, GHAZIABAD, 201002
Sr.Development work declared to RERA
1Demarcation of Plots
OUTER SITE BOUNDARY WITH PRECAST BOUNDARY WALL WITH 150x150x2700mm HIGH COLUMNS AND PANELS OF SIZE 2100x300x50MM, BOTH OF M30GRADE. COLUMNS AND PANELS BOTH WILL BE REINFORCED WITH 4MM DIA OF HIGH CARBON HTPS WIRE. PRECAST CONCRETE COLUMNS IS TO BE EMBEDDED INTO CEMENT CONCRETE COLUMN.
2Boundary Wall
LENGTH 278.72M , HEIGHT-2.4M, MATERIAL USED-RCC,BRICK,STONE, METAL,TYPE(BRICK,RCC , FENCING) RCC WALL/ COLOUMN AND BRICK WORK AS PER DRAWINGS
3Road Work
12MTR BLACKTOP ROAD WORK WITH WBM AND BITUMINS CONCRETE ROAD AS PER CPWD SPECIFICATION. THE ROAD SHALL BE MADE AFTER COMPACTING THE EARTH TO THE REUISITE DENSITY.
4Footpaths
FOOTHPATHS WILL BE MADE OF INTERLOCKING PAVERS OF 100x200mm AND 200x200MM AND 50mm THICKNESS HAVING M3 GRADE CONCRETE.
5Water Supply Including Drinking Water Facilities
NO OF WATER CONNECTION 01, TAN CAPACITY 450KLD, NO OF HYDRANTS 34, SOURCE OF WATER MUNICIPAL, TREATMWNT METHOD-FIILTRATION METHOD, COMPLIANCE WITH QUALITY STANDARDS -YES
6Sewer System
LENGTH OF SEWER LINE 130M, PIPE SIZE 150 DIA, DESIGN- MANNING FORMULA, GRAVITY SYSTEM NETWORK PROVIDED.MAIN SEWER LINE HAS BEEN DESIGNED ASPER NORMS AND PARTIALLY LAY IN BASEMENT CEILING AND WILL FINALLY CONNECT TO STP.
7Drain
LENGTH OF DRAIN 180M, WIDTH 300MM AND 200MM, DIA TYPE-STORM/SURFACE, MANNING FORMULA/ DISPOSAL MEHTHOD UNDERGROUND PIPE DRAIN WITH CHAMBER
8Parks
233.973 SQM GREEN AREA IN PARKS AND OTHER DIFFERENT PLACES, 46 TREES AND OTHER LANDSCAPING FEATURES LIKE BENCHES, LIGHT ETC. LANDSCAPE AND TREE PLANTING HAS BEEN DESIGNED AS PER AUTHORITY GUIDELINES
9Tree Planting
46 TREES, TYPE/SPICES-CHAMPA 2.5M C/C, NEEM 5M C/C , PILKHAN 5M C/C , SAPTPRANI 5M C/C , MAULSHRI 5M C/C, CONOCORPUS 2.5M C/C, BPTTLE BRUSH 3M C/C, LANDSCAPE AND TREE PLANTING HAS BEEN DESIGNED BY AS PER AUTHORITY GUIDELINES
10Design For Electric Supply Including Street Lighting
ONE TRANSFORMER OF 1000KVA WILL BE INSTALLED AS PER LOAD REQUIREMENT AND AS PER APPROVED LAYOUT ALONG WITH FEDER PILLARS AND DISTRIBUTION NETWORK. THE SAME SHALL BE AS PER UP ELECTRICITY BOARD GUIDELINES
11Community Buildings
THE APPROXIMATE AREA OF COMMUNITY FACILITIES WILL BE DESIDE AS PER LAYOUT DRAWING , THE COMMUNITY BUILDING SHALL BE CONSTRUCTED AS PER SANCTION MAP WHICH INCLUDE HALL, CHILDREN PLAY AREA , GYM, WATER BODY ENTRANCE LOBBY ETC.COMMUNITIY FACILITIES AREA HAS BEEN DESIGNED AS PER AUTHORITY NORMS AND FACILITIES
12Treatment and Disposal System of Sewage and Sullage water
SEWER WILL BE TREATED IN STP165 KLD AND TREATED WATER WILL BE RECYCED FOR USE IN FLUSHING AND GARDENING
13Solid Waste Management And Disposal System
DOOR TO DOOR COLLECTION AND WILL BE DISPOSED UP TO GARBAGE POINT OF THE AUTHORITY
14Water Conservation System
THE RAIN WATER HARVESTING (2 NUMBER OF 5.65 CUM) SHALL BE DONE AS PER EC NORMS TO RECHARGE GROUND WATER TABLE. THE LOW FLOW WATER FIXURES WILL BE USED FOR LESS WATER CONSUMPTION. RECYCLINHG OF WATER AND RAIN WATER SYSTEM TO BE PROVIDE
15Energy Management System Including Use of Renewable Energy
THE ENERGY MANAGEMENT SHALL BE DONE AS PER ECBC REGULATIONS INCLUDING ONLINE ROOF TOP SOLAR SYSTEM (80KW) FOR BASEMENT LIGHTING ,SOLAR PANEL HAS BEEN PROVIDED AS PER NORMS AT SUITABLE PLACE
16Fire Protection And Fire Safety System
NO OF HYDRANT 34, FIRE EXITS PROVIDED AS PER NBC 2016, AUTOMATIC SPRINKLER SYSTEM, NBC COMPLIANCE-YES FIRE SAFTEY TRAINING WILL BE PROVIDED, SYSTEM WILL BE PROVIDED AS PER THE FIRE DEPARTMENT GUIDELINES
17Social Infrastructure And Other Public Amenities Including Public Health Services
PUBLIC TOILET, HEALTH FACILITY , FIRST AID KIT ETC, AS PER SANCTION PLAN
18Emergency Evacuation Services
AS PER SANCTION PLAN FOR THE FIRE DEPARTMENT
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Feb 2031.

Sanctioned by Ghaziabad Development Authority · 4,082 sqm of land · an approved plan of 1 block and 472 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
HOTEL/10194/GDA/BP/25-26/0579/2702202627 Feb 202626 Feb 203125 Feb 203226 Feb 2031
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1216,1217,1218/13924082.56Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · BAHI NO. 1, JILD NO. 22344, PG NO. 289-348 ON Sr. No. 1520
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · LAND AREA CHART
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · CERTIFY KHATAUNI
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New23 May 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New7 Apr 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New7 Apr 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New7 Apr 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New23 May 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New23 May 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New23 May 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New23 May 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Apr 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New11 Jun 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 May 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New10 Jun 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New9 Jun 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New1 Jun 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2026-Q1 to 2026-Q2.

QuarterConstructionCertificates
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSHRINATH JI PROMOTERS AND DEVELOPERS
RolePromoter · current
RERA IDUPRERAPRM351508
PANAFEFS1775D
CIN / TANMRTS33953D
Registered addressR-13/72, RAJ NAGAR, GHAZIABAD, UP-201002
RERA contact
Registered since2025
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SHRINATHJI PROMOTERS AND DEVELOPERS COLLECTION A/C THE GRAND EMPORIOBankICICI BANKBranchRAJ NAGAR EXTENSION GHAZIABADBranch addressGR FLOOR, VVIP STYLE MALL, RAJ NAGAR EXTENSION, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0007546Branch emailshailendrakumar.dwivedi@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SHRINATHJ JI PROMOTERS AND DEVELOPERS SEPERATE BANK A/C THE GRAND EMPORIOBankICICI BANKBranchRAJ NAGAR EXTENSION-GHAZIABADBranch addressGR. FLOOR, VVIP STYLE MALL, RAJ NAGAR EXTENSION, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0007546
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SHRINATH JI PROMOTERS AND DEVELOPERS RERA TRANSACTION A/C THE GRAND EMPORIOBankICICI BANKBranchRAJ NAGAR EXTENSION- GHAZIABADBranch addressGR. FLOOR, VVIP STYLE MALL, RAJ NAGAR EXTENSION, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0007546
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
19 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about THE GRAND EMPORIO

Is THE GRAND EMPORIO RERA registered?

Yes. THE GRAND EMPORIO is registered with UPRERA under registration number UPRERAPRJ257958, registered on 8 Jul 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for THE GRAND EMPORIO?

The completion date filed with UPRERA is 26 Feb 2031. No completion certificate is on record yet.

Who is the builder of THE GRAND EMPORIO?

SHRINATH JI PROMOTERS AND DEVELOPERS is the promoter entity that filed THE GRAND EMPORIO with UPRERA (promoter RERA ID UPRERAPRM351508). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does THE GRAND EMPORIO have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is THE GRAND EMPORIO located?

THE GRAND EMPORIO is registered in VILLAGE NOOR NAGAR, RAJ NAGAR EXTENSION, Ghaziabad, as filed with UPRERA.

What configurations are available in THE GRAND EMPORIO?

The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in THE GRAND EMPORIO?

The approved unit plan filed with UPRERA runs from 8 to 43 m² of carpet area (about 81 to 461 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in THE GRAND EMPORIO?

The approved unit plan describes 1 block and 472 units of which 355 are homes and 117 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is THE GRAND EMPORIO?

About 468 units per acre: 472 planned units across 1.01 acres (4,082 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗