Trigold Shubhkamana

UPRERAAbeyance

Trigold Shubhkamana is a RERA-registered residential project by TRIGOLD INFRA DEVELOPERS PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ15116). RERA status: Abeyance.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Abeyance.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ15116
Project categoryResidential
Registration typeNew
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Proposed start5 Nov 2017
Project duration66 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant addressD/1012/15 Indira Nagar, Lucknow- 226016, Uttar Pradesh
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Abeyance. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered5 Feb 2018
Original completion4 Nov 2022
Revised completion3 May 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹30,000

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sunil Gaur
License UPS28704372
C-360, Sector-B, Mahanagar, Lucknow-226006, Uttar Pradesh
Engineer
NA
NA
Contractor
Sunil
C-360, Sector-B, Mahanagar, Lucknow-226006, Uttar Pradesh

Permits & extensions

0 permits

An approval and the date it runs to - not proof the work matching it was done.

4,910 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 3 May 2023.

#Granted fromExtended uptoNote
14 Nov 20223 May 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

4 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
385135520.9—
392617329.8—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 5 Oct 2016.

Registry no.DateTypeArea
1646914 Oct 2016self—
160305 Oct 2016self—
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old5 Feb 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old5 Feb 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterNo
Fire safety (as filed with RERA)No
Health serviceNo
Renewable energyNo
Other facilitiesNo

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameTRIGOLD INFRA DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM34154
PANAAFCT8298M
CIN / TANU70109UP2016PTC084724
Name of chairmanAnuj Srivastava
Registered addressD/1012/15 Indira Nagar, Lucknow- 226016, Uttar Pradesh
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Trigold Infra Developers Private LimitedBankICICI BankBranchGomtinagarA/C no.IFSCICIC000214
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about Trigold Shubhkamana

Is Trigold Shubhkamana RERA registered?

Yes. Trigold Shubhkamana is registered with UPRERA under registration number UPRERAPRJ15116, registered on 5 Feb 2018. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Trigold Shubhkamana?

The completion date filed with UPRERA is 3 May 2023. No completion certificate is on record yet.

Who is the builder of Trigold Shubhkamana?

TRIGOLD INFRA DEVELOPERS PRIVATE LIMITED is the promoter entity that filed Trigold Shubhkamana with UPRERA (promoter RERA ID UPRERAPRM34154). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Trigold Shubhkamana more time to complete?

UPRERA's record carries 1 completion extension for Trigold Shubhkamana, the latest running to 3 May 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Trigold Shubhkamana have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Trigold Shubhkamana located?

Trigold Shubhkamana is registered in Lucknow, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗