Tulsiani and Paramjyoti Trade

UPRERARegistered

Tulsiani and Paramjyoti Trade is a RERA-registered commercial project by TULSIANI CONSTRUCTIONS AND DEVELOPERS PRIVATE LIMI in Prayagraj (RERA ID UPRERAPRJ967841). Registered with a completion deadline of 29 Jun 2024. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ967841
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAllahabad Development Authority
Proposed start1 Jan 2020
Project duration54 months
AddressAllahabad **, Prayagraj
TehsilAllahabad **
Applicant typeCompany
Applicant addressPLOT NO. 3 BLOCK N, GREEN PARK (MAIN) NEW DELHI ,110016
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    80/PRA.AA.(T.S.-2)/ZONE-1/PRASTA/2018-19

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Apr 2020
Original completion30 Dec 2023
Revised completion29 Jun 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹36,000
Sanctioning authorityAllahabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors9 · 1 · 9 (units from plan)
Homes · commercial units2 · 7 (shops and offices filed in the same plan)
  • SHOP7 78%
  • OTHER2 22%
ConfigurationUnitsCarpet area
OTHER21,160
SHOP7798-948
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · OTHER, SHOP99798-1,160
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Akhileshwar Singh
License CA/94/16740
Shop No. 49/G-7, Lotus Partment, Tashkand Marg, Civil Lines, Prayagraj-211001
Engineer
Akhilesh Kumar Singh
D-27, Indira Nagar, Lucknow-226016
Contractor
Lavkush Mishra
129 Beniganj Prayagraj
Sr.Development work declared to RERA
1Demarcation of Plots
Well Demarcated Plot With Existing Boundary At Three Side
2Boundary Wall
Boundary Wall At Three Side With Main Road At Front
3Road Work
Cement Concrete Flooring In Driveway/Setback In All Flour Sides
4Footpaths
Driveway/Setback Will Used S Footpath Also.
5Water Supply Including Drinking Water Facilities
Water Supply From Deep Borewell To U/G Water Tank As Well As To Water Tank At Terrace.
6Sewer System
Sewer Will Be Connected To Stp Therefter Discharging To Exitising Municipal Sewer Line At Main Road.
7Drain
Drain Covered With M.S. Grating In Driveway Connected Ti Exiting Drain At Main Road.
8Parks
Trees With Flower Beds And Grass Will Be Provided.
9Tree Planting
Evergreen Tress Of 27 Nos. Will Be Planted
10Design For Electric Supply Including Street Lighting
Through Transformer Installed In Campus From Exiting Govt. Electricty Supply Line.
11Community Buildings
N/A
12Treatment and Disposal System of Sewage and Sullage water
"Stp Will Be Installed For Treatment Of Sewwage And Sullage Water. "
13Solid Waste Management And Disposal System
Dustbin Will Be Provided For Collecting The Solid Waste And Same Will Be Disposed By Agency Appointed By Nagar Nigam
14Water Conservation System
Rain Water Harvesting System As Per Design Will Be Provided For Water Conservation System
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
As Per The Guidline Provided By The Fire Department
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Adequate Nos Of Fire Escapes Has Been Provided As Per Guideline By Fire Department
19Other Miscellaneous Work
Provision Of Solar Lighting In Driveway.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Earth Homes Pvt. LtdUPRERAAGT11244
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Dec 2023.

Sanctioned by Allahabad Development Authority · 2,570 sqm of land · an approved plan of 1 block and 9 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
80/PRA.AA.(T.S.-2)/ZONE-1/PRASTA/2018-1931 Dec 201830 Dec 202330 Dec 202630 Dec 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Jun 2024.

#Granted fromExtended uptoNote
130 Dec 202329 Jun 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
53/2640.17Khasra
53/3767.73Khasra
53/3152.83Khasra
53/4339.36Khasra
53/6572.46Khasra
53/797.14Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 4899
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3629
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 7
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 3029
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 2712
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3630
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New14 Mar 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New18 Feb 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New18 Feb 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Feb 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New18 Feb 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New18 Feb 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New18 Feb 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New3 Mar 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New14 Mar 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Feb 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New18 Feb 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Feb 2020 ↗

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameTULSIANI CONSTRUCTIONS AND DEVELOPERS PRIVATE LIMI
RolePromoter · current
RERA IDUPRERAPRM10383
PANAABCT6244P
CIN / TANALDT00215F
Name of chairmanANIL KUMAR TULSIANIMAHESH KUMAR TULSIANI
Registered addressPLOT NO. 3 BLOCK N, GREEN PARK (MAIN) NEW DELHI ,110016
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal namePARAM JYOTI CONSTRUCTION AND TRADE
RoleCo-promoter
Applicant typePartnership Firm
Address17 INDUSTRIAL COLONY NAINI ALLAHABAD
RERA contact

Nearby projects

Prayagraj

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
TULSIANI CONSTRUCTION AND DEVELOPERS LIMITEDBankTHE FEDERAL BANK LIMITEDBranchCIVIL LINES ALLAHABADA/C no.IFSCFDRL0001392
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)264 (Under Registration - 2 ) → 264 (Under Registration - 0 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)263 (Under Registration - 1 ) → 264 (Under Registration - 2 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)262 (Under Registration - 0 ) → 263 (Under Registration - 1 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)262 (Under Registration - 13 ) → 262 (Under Registration - 0 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 4 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Tulsiani and Paramjyoti Trade

Is Tulsiani and Paramjyoti Trade RERA registered?

Yes. Tulsiani and Paramjyoti Trade is registered with UPRERA under registration number UPRERAPRJ967841, registered on 28 Apr 2020. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Tulsiani and Paramjyoti Trade?

The completion date filed with UPRERA is 29 Jun 2024. No completion certificate is on record yet.

Who is the builder of Tulsiani and Paramjyoti Trade?

TULSIANI CONSTRUCTIONS AND DEVELOPERS PRIVATE LIMI is the promoter entity that filed Tulsiani and Paramjyoti Trade with UPRERA (promoter RERA ID UPRERAPRM10383). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Tulsiani and Paramjyoti Trade show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted Tulsiani and Paramjyoti Trade more time to complete?

UPRERA's record carries 1 completion extension for Tulsiani and Paramjyoti Trade, the latest running to 29 Jun 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Tulsiani and Paramjyoti Trade have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Tulsiani and Paramjyoti Trade located?

Tulsiani and Paramjyoti Trade is registered in Prayagraj, as filed with UPRERA.

What configurations are available in Tulsiani and Paramjyoti Trade?

The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Tulsiani and Paramjyoti Trade?

The approved unit plan filed with UPRERA runs from 798 to 1,160 m² of carpet area (about 8,591 to 12,491 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Tulsiani and Paramjyoti Trade?

The approved unit plan describes 1 block and 9 units of which 2 are homes and 7 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Tulsiani and Paramjyoti Trade?

About 14 units per acre: 9 planned units across 0.64 acres (2,570 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗