Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
18.62%Q3'25
23.77%Q4'25
30.91%Q1'26
39.89%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ991195
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Nov 2024
Project duration60 months
AddressKHASRA NO. 254, 259, 260 , 261, 262, 263, 264, 265, 266, 306M, 307M, 354, 355, 356, 357, 358, 373, 374 & 377, NOOR NAGAR, RAJ NAGAR EXTENSION, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address206, SF, PLOT NO 9, LSC, SAVITA VIHAR, DELHI 110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/07743/GDA/BP/23-24/1317/1809224

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered13 Dec 2024
Original completion18 Oct 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,41,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors680 · 9 · 16 (units from plan)
Homes · commercial units664 · 16 (shops and offices filed in the same plan)
  • 3 BHK544 80%
  • 4 BHK56 8%
  • 2 BHK33 5%
  • 1 BHK23 3%
  • SHOP16 2%
  • OTHER8 1%
ConfigurationUnitsCarpet area
OTHER8164-682
3 BHK54488-127
4 BHK56146
SHOP1615-16
1 BHK2332-100
2 BHK3350-52
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Club/Community · OTHER65673-682
Tower A · OTHER, 3 BHK16112109-127
Tower B · OTHER, 4 BHK, 3 BHK1684109-146
Tower C · OTHER, 3 BHK1684109-127
Tower D · OTHER, 3 BHK16110109-127
Tower E · OTHER, 3 BHK165690
Tower F · OTHER, 3 BHK168489
Tower G · OTHER, 3 BHK167088-89
Tower H (Commercial+Residential) · OTHER, SHOP, 1 BHK, 2 BHK157515-280
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Anuj Agarwal
License CA/96/19503
A-244, Kaushambi, Ghaziabad
Engineer
V.D.SHARMA
B-24, SECTOR- 67, NOIDA (U.P.)
Contractor
Mavi Construction
Sector-5/1465, GF, Vasundhara, Ghaziabad
Sr.Development work declared to RERA
1Demarcation of Plots
Khasra No. 254, 259, 260, 261, 262, 263, 264, 265, 266, 306, 307, 354, 355, 356, 357, 358, 373, 374, 377 Village Noor Nagar, Raj Nagar Extension, Ghaziabad, U.P. Total Plot Area 27262.45 Sq.Mtr. Demarcation points given by patwari.
2Boundary Wall
Well Defined Plot Boundaries proposed to ensure the security and privacy of the project. development of the boundary wall (230 mm thick concrete wall with minimum height of 2.1 mtr
3Road Work
All roads in the complex will be in M25 grade concrete. roads will be laid over 225 mm water bound macadam
4Footpaths
Development of pathways for smooth pedestrian movement use of 60 mm to 80 mm thick brick type concrete/grass pavers ad per design.
5Water Supply Including Drinking Water Facilities
installation of water supply system to ensure a steady and safe domestic water supply, including provisions for landscape water requirements. the supply of water to individual flat shall be from the said overhead water tanks. underground and overhead water tanks with automatic pumps for 24 hours water supply
6Sewer System
sewer system to collect waste water generated with the project premises including treatment and dispose of waste water/sewage. use of pipe having dia 110 mm to 150 mm with adequate numbers of inspection chambers and man-holes based upon the design and site requirements.
7Drain
Drainage System within the site to manage surface water and storm water flow . in the drainage system of the project, use of pipe having dia of 110 mm to 200 mm and open drains with adequate numbers of inspection chambers and man-holes based the design and site requirements.
8Parks
Development of landscape areas including green/open spaces/recreational areas/tot-lots plantation of shrubs besides planting natural grass, landscape features etc., use of electrical poles having height upto 4 mtr in landscape areas
9Tree Planting
one tree for every 80 sq.mtr of land needs to be planted within construction sites for residential building, ensuring 10 percent green cover for total area. the tree will be planted at all suitable locations of the project and along the boundary walls
10Design For Electric Supply Including Street Lighting
Electric supply provided through 33/0.415 KV transformers and by DG Set supply for backup. use of electrical poles, as per design and site requirements with LED Lights.
11Community Buildings
Community building of the project has been proposed in the society having various activities halls, meeting rooms, gym, games, kids play area, yoga etc., details of the same are given in approved plans
12Treatment and Disposal System of Sewage and Sullage water
STP will be installed at basement for treated the sewer and treated water will be recycled for use in flushing and gardening
13Solid Waste Management And Disposal System
Solid wastes to be collected form individual flats and stored in garbage room in the complex. recyclable shall be processed in the compost machine to make compost. non recyclable waste shall be disposed of through approved agents
14Water Conservation System
rain water harvesting pits has been plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area
15Energy Management System Including Use of Renewable Energy
The main power supply will be through HT power connection, stepped down by transformer and then distributed. DG backup of suitable rating will be provided. the campus light will be a combination of solar lights and grid supplied power. the light fittings will be power saving LED fittings.
16Fire Protection And Fire Safety System
fire fighting system shall be provided for buildings as per the prevailing requirements of NBC. sprinkler shall be provided in common areas. water supply to sprinklers and hydrants shall be from fire pumps located in the basement.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not Applicable
18Emergency Evacuation Services
Fire Stair Case shall be provided as per the approvals fire drawing for evacuation to open areas.
19Other Miscellaneous Work
as per the requirement on period of time
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 19 Oct 2029.

Sanctioned by Ghaziabad Development Authority · 27,262 sqm of land · an approved plan of 9 blocks and 680 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/07743/GDA/BP/23-24/1317/180922419 Oct 202419 Oct 202915 Feb 203118 Oct 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

46 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2541140Khasra
2592400Khasra
260328Khasra
2601312Khasra
2611387.02Khasra
261101.31Khasra
26131.67Khasra
262890Khasra
263890Khasra
2641900Khasra
265168.33Khasra
265280.55Khasra
265505Khasra
26556.11Khasra
2663670Khasra
30656.40Khasra
306450Khasra
306282.60Khasra
30783.00Khasra
30713Khasra
35429Khasra
354136.10Khasra
354215Khasra
355148.30Khasra
355222.50Khasra
355445Khasra
35574.20Khasra
3563160Khasra
357,3582400Khasra
3732400Khasra
374,3772400Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 11800
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 111003
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14206
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3302
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10584
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7783
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 195
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10691
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2577
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3512
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11360
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12253
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12059
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13200
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10685
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3074
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3094
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3504
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3075
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3076
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3503
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3550
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3093
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3097
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3681
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3936
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3505
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12438
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10996
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6118
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Land Chart
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Name Change Aadesh with Letter
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Allotment letter from the authority · U70102DL2015PTC284318
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New12 Nov 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Dec 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New9 Dec 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New12 Nov 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New12 Nov 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New12 Nov 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New12 Nov 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New12 Nov 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Nov 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New12 Nov 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New12 Nov 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New12 Nov 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New12 Nov 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New10 Dec 2024 ↗

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2024-Q3 to 2026-Q1.

QuarterConstructionCertificates
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q218.62%CA ↗ · Arch ↗ · Eng ↗
2025-Q323.77%CA ↗ · Arch ↗ · Eng ↗
2025-Q430.91%CA ↗ · Arch ↗ · Eng ↗
2026-Q139.89%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameUNINAV BUILDCON PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM313111
PANAAFCK9148M
CIN / TANU70102DL2015PTC284318
Name of chairmanMR. ANOOP GARG
Registered address206, SF, PLOT NO 9, LSC, SAVITA VIHAR, DELHI 110092
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UNINAV BUILDCON PRIVATE LIMITED COLLECTION ACCOUNT FOR UNINAV RESIDENABankSTATE BANK OF INDIABranchCOLLECTORATE COMPOUNDBranch addressRAJ NAGAR GHAZIABAD-201002Branch districtGhaziabad, Uttar PradeshA/C no.IFSCSBIN0007873Branch emailsbi.0873attheratesbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UNINAV BUILDCON PRIVATE LIMITED SEPERATE ACCOUNT FOR UNINAV RESIDENABankSTATE BANK OF INDIABranchCOLLECTORATE COMPOUNDBranch addressRAJ NAGAR GHAZIABAD-201002Branch districtGhaziabad, Uttar PradeshA/C no.IFSCSBIN0007873Branch emailsbi.07873attheratesbi.co.in
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UNINAV BUILDCON PRIVATE LIMITED TRANSACTION ACCOUNT FOR UNINAV RESIDENABankSTATE BANK OF INDIABranchCOLLECTORATE COMPOUNDBranch addressRAJ NAGAR GHAZIABAD -201002Branch districtGhaziabad, Uttar PradeshA/C no.IFSCSBIN0007873Branch emailsbi.07873attheratesbi.co.in
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about UNINAV RESIDENA

Is UNINAV RESIDENA RERA registered?

Yes. UNINAV RESIDENA is registered with UPRERA under registration number UPRERAPRJ991195, registered on 13 Dec 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for UNINAV RESIDENA?

The completion date filed with UPRERA is 18 Oct 2029. No completion certificate is on record yet.

Who is the builder of UNINAV RESIDENA?

UNINAV BUILDCON PRIVATE LIMITED is the promoter entity that filed UNINAV RESIDENA with UPRERA (promoter RERA ID UPRERAPRM313111). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does UNINAV RESIDENA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is UNINAV RESIDENA located?

UNINAV RESIDENA is registered in NOOR NAGAR, RAJ NAGAR EXTENSION, Ghaziabad, as filed with UPRERA.

What configurations are available in UNINAV RESIDENA?

The unit plan filed with UPRERA lists OTHER, 3 BHK, 4 BHK, SHOP, 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in UNINAV RESIDENA?

The approved unit plan filed with UPRERA runs from 15 to 682 m² of carpet area (about 159 to 7,345 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in UNINAV RESIDENA?

The approved unit plan describes 9 blocks and 680 units of which 664 are homes and 16 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is UNINAV RESIDENA?

About 101 units per acre: 680 planned units across 6.74 acres (27,262 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗