Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q1'25
—Q2'25
1%Q3'25
8%Q4'25
0%Q1'26
23%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ913692
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start1 Mar 2025
Project duration50 months
AddressPLOT NO GH-01, IN PLOT NO TS-01, SECTOR 22A, YAMUNA EXPRESSWAY, SECTOR-22A, YAMUNA EXPRESSWAY, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address63, 3rd Floor, Poorvi Marg, Vasant Vihar Phase-1, New Delhi 110057
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 3 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Mar 2025
Original completion30 Apr 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,66,500
Sanctioning authorityYamuna Expressway Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,287 · 7 · 26 (units from plan)
  • 3 BHK526 41%
  • STUDIO392 30%
  • 1 BHK357 28%
  • 2 BHK12 1%
ConfigurationUnitsCarpet area
2 BHK1275-104
3 BHK52693-126
1 BHK35730-49
STUDIO39224
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER-1 · 2 BHK, 3 BHK1970104-126
TOWER-2 · 2 BHK, 3 BHK1970104-126
TOWER-5 · 2 BHK, 3 BHK2510075-93
TOWER-6 · 2 BHK, 3 BHK259875-93
TOWER-7 · 2 BHK, 3 BHK2510075-93
TOWER-8 · 2 BHK, 3 BHK2510075-93
TOWER-9 · 1 BHK, STUDIO2674924-49
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
VISHAL SHARMA
License CA/1998/23261
F-1, FIRST FLOOR, MEERA CORPORATE SUITS, FRIENDS COLONY, NEW DELHI
Engineer
V D SHARMA
B-27, SECTOR 67, NOIDA
Contractor
MUBARAK ALI
VILL AIRANJONGLA, PART 1, P.O. A.M. ROAD, P.S. DHUBRI, ASSAM
Sr.Development work declared to RERA
1Demarcation of Plots
The plot will be demarcated as per the sanction and survey drawing.
2Boundary Wall
Boundary wall of RCC/ brick with plaster and railing will be prepared.
3Road Work
Access road to all towers will be provided and the road will be designed to take up live load as per approvals and NBC.
4Footpaths
Designed footpath in the central green as walkway and jogging track.
5Water Supply Including Drinking Water Facilities
Authority shall supply water for the entire society and it shell be treated and pumped to all the houses.
6Sewer System
Centralised STP to treat the sewage will be designed and provided.
7Drain
Rain water drains will be provided as per the design.
8Parks
Beautiful parks will be made for all residents to enjoy.
9Tree Planting
As per approved building plan, apt number of trees will be provided.
10Design For Electric Supply Including Street Lighting
Power supply from electricity board and street lighting as per approved building plan.
11Community Buildings
Club will be made as per approved building plan and it will be a state of the art building with all modern facilities.
12Treatment and Disposal System of Sewage and Sullage water
Centralised STP to treat the sewage.
13Solid Waste Management And Disposal System
Collection, storage and disposal will be done as per sanctions and NBC.
14Water Conservation System
Rain water harvesting system is being provided to conserve rain water and dual flush system will also be provided with water saving fittings.
15Energy Management System Including Use of Renewable Energy
Usage of LED lights will be used all over the project and use of solar lights will also be explored.
16Fire Protection And Fire Safety System
As per approved building plan we will design best fire protection system consisting of sprinklers, smoke detectors and fire alarm.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social gathering places in the club are being provided such as community hall.
18Emergency Evacuation Services
As per approved building plan and fire approvals, fire staircase are being provided.
19Other Miscellaneous Work
As per approved building plans.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Amit kumar kaushikUPRERAAGT18627
2BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 10 Dec 2029.

Sanctioned by Yamuna Expressway Authority · 32,273 sqm of land · an approved plan of 7 blocks and 1287 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

26 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No GH-01, in Plot No TS-01, Sector-22A, Yamuna Expressway, District gautam Budha Nagar, U.P.32273.00Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · Book No 1, Jild No 8687, Page No 1 to 30, S. No 10287
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · 25/YEA-RT-02/2011
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · YEA/PLANNING/783/2024
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · IBBI/IPA-001/IP-P00209/2017-18/10409
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Sajra Plan
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Payment Plan
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · Dated 4/2/2013, S No 2553, book-1, page 293 to 870 Jild 2553
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New19 Mar 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New1 Jan 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New21 Dec 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New15 Jan 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Dec 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Dec 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Dec 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New21 Dec 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Dec 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New5 Mar 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New1 Jan 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 Jan 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New6 Jan 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New21 Dec 2024 ↗

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2024-Q4 to 2026-Q2.

QuarterConstructionCertificates
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q21%CA ↗ · Arch ↗ · Eng ↗
2025-Q38%CA ↗ · Arch ↗ · Eng ↗
2025-Q40%CA ↗ · Arch ↗ · Eng ↗
2026-Q123%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameTHREE C HOMES PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM324273
PANAADCT7045E
CIN / TANDELT09441F
Name of chairmanAJAY KUMAR
Registered address63, 3rd Floor, Poorvi Marg, Vasant Vihar Phase-1, New Delhi 110057
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Three C Homes Pvt Ltd RERA Collection A/C ACE VERDEBankHDFC Bank LtdBranchSector 18 NOIDABranch addressAnsal Fortune Arcade, K-Block, Sector 18 NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088Branch emailNeeraj.kumar36@hdfc.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Three C Homes Pvt Ltd RERAA Seprate A/C ACE VERDEBankHDFC Bank LtdBranchSecor 18 NOIDABranch addressAnsal Fortune Arcade, K-Block, Sector 18 NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Three C Homes PVT Ltd RERA Transaction A/C ACE VERDEBankHDFC Bank LtdBranchSector 18 NOIDABranch addressAnsal Fortune Arcade, K - Block Sector 18, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about ACE VERDE

Is ACE VERDE RERA registered?

Yes. ACE VERDE is registered with UPRERA under registration number UPRERAPRJ913692, registered on 21 Mar 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ACE VERDE?

The completion date filed with UPRERA is 30 Apr 2029. No completion certificate is on record yet.

Who is the builder of ACE VERDE?

THREE C HOMES PVT. LTD. is the promoter entity that filed ACE VERDE with UPRERA (promoter RERA ID UPRERAPRM324273). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does ACE VERDE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ACE VERDE located?

ACE VERDE is registered in SECTOR-22A, YAMUNA EXPRESSWAY, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in ACE VERDE?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK, 1 BHK and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in ACE VERDE?

The approved unit plan filed with UPRERA runs from 24 to 126 m² of carpet area (about 258 to 1,358 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in ACE VERDE?

The approved unit plan describes 7 blocks and 1,287 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ACE VERDE?

About 161 units per acre: 1,287 planned units across 7.97 acres (32,273 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.