Ajit ORO County is a RERA-registered residential project by ORO REAL INFRA LLP in Lucknow (RERA ID UPRERAPRJ716796). Registered with a completion deadline of 14 Dec 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ716796 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Jan 2022 |
| Project duration | 60 months |
| Address | Bakshi Ka Talab**, Lucknow |
| Tehsil | Bakshi Ka Talab** |
| Applicant type | Partnership Firm |
| Applicant address | 801, 8th Floor, Eldeco Corporate Tower, Vibhuti Khand, Gomtinagar, Lucknow-226010, Uttar Pradesh |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
02892/LDA/LD/21-22/0865/03092021
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 27 Jan 2022 |
| Original completion | 14 Dec 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 4 Jun 2025 |
| Registration fee | ₹3,27,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot Demarcation shall be complete by the fixing of RCC pillar on each unit. (450mm height) |
| 2 | Boundary Wall Boundary wall of the entire project shall be constructed. 4 feet boundary wall |
| 3 | Road Work Semi Dense bituminous concrete (SDBC) roads shall be constructed with the base of GSB WMM. 125 mm GSB, 75mm wmm, 25mm SDBC |
| 4 | Footpaths Footpaths shall be paving by earthen footpath. |
| 5 | Water Supply Including Drinking Water Facilities Water supply by underground tank with medium density polyethylene piping system. |
| 6 | Sewer System RCC hume pipes for Sewerage System. |
| 7 | Drain RCC hume pipes for drainage System. |
| 8 | Parks Green spaces will be developed as per approved layout plan. |
| 9 | Tree Planting Total Number of trees to be planted as per Building by-laws. |
| 10 | Design For Electric Supply Including Street Lighting Electrical infrastructure will be developed as per approved electrical layout. |
| 11 | Community Buildings Membership of Club Celebrations at ORO City shall be offered on mandatory basis. |
| 12 | Treatment and Disposal System of Sewage and Sullage water MBBR-System S.T.P / or equivalent. |
| 13 | Solid Waste Management And Disposal System Collection space in STP area. The disposal will be done by Nagar Nigam vendor. |
| 14 | Water Conservation System Rain Water Harvesting system will be developed. |
| 15 | Energy Management System Including Use of Renewable Energy Solar water heating/ Solar energy system to be decided later on the basis of feasibility study. |
| 16 | Fire Protection And Fire Safety System It is a plotted development Project. Therefore, fire safety/protection system not required. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Safe evacuation Plan of the occupants is important for high-rise building whereas this is a plotted development |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 14 Dec 2026.
Sanctioned by Lucknow Development Authority · 51,204 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 02892/LDA/LD/21-22/0865/03092021 | 15 Dec 2021 | 14 Dec 2026 | 13 Dec 2029 | 14 Dec 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 678 | 1.056 | Khasra |
| 677 | 1.978 | Khasra |
| 676 | 0.678 | Khasra |
| 692 | 2.626 | Khasra |
| 675 | 0.0515 | Khasra |
| 680 | 0.0489 | Khasra |
| Sale deed · 5841 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 61 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 1028 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 992 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 526 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5385 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 748 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2368 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6825 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 146 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1423-1428 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 0000 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 30 Dec 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 17 Dec 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 17 Dec 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 17 Dec 2021 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 17 Dec 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 17 Dec 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 17 Dec 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 17 Dec 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 17 Dec 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 30 Dec 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 25 Jan 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Jan 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 25 Jan 2022 ↗ |
Quarterly progress reports
18 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
18 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ORO REAL INFRA LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM152277 |
| PAN | AAGFO6949L |
| CIN / TAN | LKNO06289D |
| Registered address | 801, 8th Floor, Eldeco Corporate Tower, Vibhuti Khand, Gomtinagar, Lucknow-226010, Uttar Pradesh |
| RERA contact | |
| Registered since | 2021 |
| Legal name | AJIT KUMAR MAURYA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | B1/5, L Park, Mahanagar S.O, Lucknow, U.P-226006 |
| RERA contact |
| Legal name | EKTA MAURYA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | B1/5, L Park, Mahanagar S.O, Lucknow, Uttar Pradesh-226006 |
| RERA contact |
| Legal name | RANI MAURYA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | B1/5, L Park, Mahanagar S.O, Lucknow. U.P- 226006 |
| RERA contact |
| Legal name | AISHWARYA MAURYA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | B1/5, L Park, Mahanagar S.O, Lucknow U.P-226006 |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | ORI Collection A/c for Ajit Oro CountyBankCanara BankBranchVipin Khand, GomtinagarBranch addressVipin Khand, GomtinagarBranch districtLucknow, Uttar PradeshA/C no.IFSCCNRB0002405 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | ORI Seperate A/c for Ajit Oro CountyBankCanara BankBranchVipin Khand, GomtinagarBranch addressVipin KHand, GomtinagarBranch districtLucknow, Uttar PradeshA/C no.IFSCCNRB0002405 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | ORI Transaction A/c for Ajit Oro CountyBankCanara BankBranchVipin Khand, GomtinagarBranch addressVipin Khand, GomtinagarBranch districtLucknow, Uttar PradeshA/C no.IFSCCNRB0002405 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Ajit ORO County
Is Ajit ORO County RERA registered?
Yes. Ajit ORO County is registered with UPRERA under registration number UPRERAPRJ716796, registered on 27 Jan 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has Ajit ORO County been completed?
UPRERA still lists Ajit ORO County as Registered, so it is not shown as completed here. A completion certificate dated 4 Jun 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Ajit ORO County?
ORO REAL INFRA LLP is the promoter entity that filed Ajit ORO County with UPRERA (promoter RERA ID UPRERAPRM152277). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Ajit ORO County have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Ajit ORO County located?
Ajit ORO County is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗