AMBESHWARI BUILD CON is a RERA-registered residential project by AMBESHWARI BUILD CON in Gorakhpur (RERA ID UPRERAPRJ9405). Registered with a completion deadline of 11 Jun 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9405 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Gorakhpur Development Authority |
| Proposed start | 13 Feb 2014 |
| Original start | 13 Feb 2014 |
| Project duration | 88 months |
| Address | Gorakhpur, Gorakhpur |
| Tehsil | Gorakhpur |
| Applicant type | Proprietorship Firm |
| Applicant address | 7, CIVIL LINES GOLGHAR GORAKHPUR UP-273001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
219/2013
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- valid to
Permit revalidated
219/2013
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Aug 2017 |
| Original completion | 13 Dec 2019 |
| Revised completion | 11 Jun 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹18,500 |
| Sanctioning authority | Gorakhpur Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK37 55%
- 4 BHK21 31%
- 2 BHK9 13%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 37 | 96-145 |
| 4 BHK | 21 | 114-221 |
| 2 BHK | 9 | 80-127 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| D · 3 BHK, 4 BHK, 2 BHK, OTHER | 14 | 67 | 80-221 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Completed |
| 2 | Boundary Wall Completed |
| 3 | Road Work Ongoing |
| 4 | Footpaths Ongoing |
| 5 | Water Supply Including Drinking Water Facilities Ongoing |
| 6 | Sewer System Ongoing |
| 7 | Drain Ongoing |
| 8 | Parks NA |
| 9 | Tree Planting Ongoing |
| 10 | Design For Electric Supply Including Street Lighting Ongoing |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Ongoing |
| 13 | Solid Waste Management And Disposal System Ongoing |
| 14 | Water Conservation System Ongoing |
| 15 | Energy Management System Including Use of Renewable Energy Ongoing |
| 16 | Fire Protection And Fire Safety System Ongoing |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Ongoing |
| 18 | Emergency Evacuation Services Ongoing |
| 19 | Other Miscellaneous Work Ongoing |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 17 Jan 2019. All 2 carry a revalidation, the latest valid to 6 Jul 2022.
Sanctioned by Gorakhpur Development Authority · 2,603 sqm of land · an approved plan of 1 block and 67 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 219/2013 | 18 Jan 2014 | 17 Jan 2019 | 6 Jul 2025 | 13 Dec 2019 | 7 Jul 2017 valid to 6 Jul 2022 | |
| 219/2013 | 18 Jan 2014 | 17 Jan 2019 | 6 Jul 2025 | 13 Dec 2019 | 18 Jan 2014 valid to 6 Jul 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 11 Jun 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 13 Dec 2019 | 12 Dec 2020 | — |
| 2 | 12 Dec 2020 | 11 Jun 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
36 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 4/1 | 19.5 dismil | — |
| 466/1/4 | 13.5 dismil | — |
| 14/2 | 21.0 dismil | — |
| 466/1/5 | 10.0 dismil | — |
| 13/2/2 | 10.47 dismil | — |
| 4/1 | 790.15 | Khasra |
| 466/1/4 | 547.02 | Khasra |
| 14/2 | 850.92 | Khasra |
| 466/1/5 | 405.20 | Khasra |
| 13/2/2 | 424.2 | Khasra |
5 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 2 Feb 2001.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 5930 | 13 Oct 2006 | self | — |
| 3897 | 23 May 2001 | self | — |
| 385 | 2 Feb 2001 | self | — |
| 3906 | 20 Aug 2002 | self | — |
| 715 | 22 Feb 2001 | self | — |
| Registry document · 5930 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3297 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 385 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3906 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 715 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Aug 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 11 Aug 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 11 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 11 Aug 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 11 Aug 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 11 Aug 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 11 Aug 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 11 Aug 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 11 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | AS PER NBC |
| Health service | YES |
| Renewable energy | YES |
| Other facilities | COMMON SITTING IN OPEN, HANDICAP FACILITY |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2020-Q3 to 2021-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q3 | — | CA ↗ |
| 2021-Q1 | — | CA ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | AMBESHWARI BUILD CON |
| Role | Promoter · current |
| RERA ID | UPRERAPRM18973 |
| PAN | AEDPC2997P |
| CIN / TAN | ALDA02897G |
| Registered address | 7, CIVIL LINES GOLGHAR GORAKHPUR UP-273001 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gorakhpur
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | AMBESHWARI BUILD CONBankUNION BANK OF INDIABranchMAIN BRANCHA/C no.IFSCUBIN0530514 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about AMBESHWARI BUILD CON
Is AMBESHWARI BUILD CON RERA registered?
Yes. AMBESHWARI BUILD CON is registered with UPRERA under registration number UPRERAPRJ9405, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for AMBESHWARI BUILD CON?
The completion date filed with UPRERA is 11 Jun 2021. No completion certificate is on record yet.
Who is the builder of AMBESHWARI BUILD CON?
AMBESHWARI BUILD CON is the promoter entity that filed AMBESHWARI BUILD CON with UPRERA (promoter RERA ID UPRERAPRM18973). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does AMBESHWARI BUILD CON show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Has UPRERA granted AMBESHWARI BUILD CON more time to complete?
UPRERA's record carries 2 completion extensions for AMBESHWARI BUILD CON, the latest running to 11 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does AMBESHWARI BUILD CON have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is AMBESHWARI BUILD CON located?
AMBESHWARI BUILD CON is registered in Gorakhpur, as filed with UPRERA.
What configurations are available in AMBESHWARI BUILD CON?
The unit plan filed with UPRERA lists 3 BHK, 4 BHK, 2 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in AMBESHWARI BUILD CON?
The approved unit plan filed with UPRERA runs from 80 to 221 m² of carpet area (about 862 to 2,374 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in AMBESHWARI BUILD CON?
The approved unit plan describes 1 block and 67 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is AMBESHWARI BUILD CON?
About 104 units per acre: 67 planned units across 0.64 acres (2,603 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗