ANEE SHAKTI APARTMENT PHASE-2 is a RERA-registered residential project by SHRI SAI REAL INFRA PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ10393). RERA status: Abeyance.
RERA status as reported: Abeyance.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ10393 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | AbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary |
| Proposed start | 10 Oct 2016 |
| Original start | 10 Oct 2016 |
| Project duration | 36 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | 3/608,Vastu Khand Gomti Nagar Lucknow UP 226010 IN |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 15 Aug 2017 |
| Original completion | 9 Oct 2019 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹7,480 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
Permits & extensions
0 permits
An approval and the date it runs to - not proof the work matching it was done.
748 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
Land & documents
9 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 215, 217 | 747.20 | — |
3 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 25 Feb 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 4253 | 15 Mar 2016 | self | — |
| 4256 | 15 Mar 2016 | self | — |
| 2607 | 25 Feb 2015 | self | — |
| Document | Status | Uploaded |
|---|---|---|
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 14 Aug 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 14 Aug 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 14 Aug 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 14 Aug 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 14 Aug 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 14 Aug 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 14 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 14 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Tanks is erected. submersible installed; local authority NOC received.. |
| Fire safety (as filed with RERA) | fire extinguisher installed at each floor, emergency exit by stairs provided..and other fire fighting facility added. |
| Health service | details of public health service-near to Civil hospital lucknow, almost 100 meter away.. |
| Renewable energy | awareness program to the the allottess and local authority support require for this.. |
| Other facilities | all the facility of lucknow would be accrue to the inhabitant, coz of in the lucknow itself. |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SHRI SAI REAL INFRA PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM20512 |
| PAN | AAQCS3317K |
| CIN / TAN | U70102UP2011PTC046000 |
| Name of chairman | Shakti Singh |
| Registered address | 3/608,Vastu Khand Gomti Nagar Lucknow UP 226010 IN |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | SHRI SAI REAL INFRA PVT LTDBankCORPORATION BANKBranchMANKHEDA, CHINHAT, LUCKNOWA/C no.IFSCCORP0001650 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about ANEE SHAKTI APARTMENT PHASE-2
Is ANEE SHAKTI APARTMENT PHASE-2 RERA registered?
Yes. ANEE SHAKTI APARTMENT PHASE-2 is registered with UPRERA under registration number UPRERAPRJ10393, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for ANEE SHAKTI APARTMENT PHASE-2?
The completion date filed with UPRERA is 9 Oct 2019. No completion certificate is on record yet.
Who is the builder of ANEE SHAKTI APARTMENT PHASE-2?
SHRI SAI REAL INFRA PRIVATE LIMITED is the promoter entity that filed ANEE SHAKTI APARTMENT PHASE-2 with UPRERA (promoter RERA ID UPRERAPRM20512). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does ANEE SHAKTI APARTMENT PHASE-2 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ANEE SHAKTI APARTMENT PHASE-2 located?
ANEE SHAKTI APARTMENT PHASE-2 is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗