SHRIRAM NORTH VIEW APPARTMENTS is a RERA-registered residential project by ROCKFORT DEVELOPERS PVT LTD in Ghaziabad (RERA ID UPRERAPRJ320381). Registered with a completion deadline of 14 Dec 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ320381 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Mar 2023 |
| Project duration | 58 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | 106,SASCO BHAWAN, AZADPUR COMMERCIAL COMPLEX, AZADPUR, DELHI-110033 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
15/PMAY/GDA/MP/2018-19
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 Jun 2023 |
| Original completion | 14 Dec 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹38,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 1 BHK171 40%
- 2 BHK164 39%
- 3 BHK72 17%
- SHOP18 4%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 72 | 60-70 |
| 1 BHK | 171 | 22-44 |
| 2 BHK | 164 | 37-82 |
| SHOP | 18 | 10-48 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK-A · 3 BHK, 1 BHK, 2 BHK, SHOP | 17 | 279 | 10-82 |
| BLOCK-B EWS · 1 BHK | 17 | 146 | 22-29 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots SITE LOCATED AT KHASRA NO 1174(P) VILLAGE NOOR NAGAR PARGANA TEHSIL LONI GHAZIABAD FACING OF TOWERS EAST IS ROAD 6MTR WIDE,WEST ROAD 6MTR WIDE,NORTH 6M ROAD AND SOUTH 6MTR ROAD ALONG BOUNDARY WALL, NORTH WEST SIDE MAIN ENTRY ROAD 45 MTRS. |
| 2 | Boundary Wall ALL SIDES 3 MTR HEIGHT BRICK WORK BOUNDARY WALL WITH FENCING. |
| 3 | Road Work INTERLOCKING BLOCK HAVE BEEN PROVIDED AT RAOD AREA, EAST IS 6MTR WIDE,WEST ROAD 6MTR WIDE, NORTH IS 6MTR WIDE AND SOUTH 6MTR ROAD ALONG BOUNDARY WALL NORTH WEST SIDE MAIN ENTRY ROAD 45 MTRS. INTERLOCKING BLOCK HAVE BEEN PROVIDED AT ROAD AREA. |
| 4 | Footpaths INTER LOCKING PAVER HAVE BEEN PROVIDED AT PROJECT ENTRY FOOTPATH. |
| 5 | Water Supply Including Drinking Water Facilities 323 KLD WATER TANK FOR SUPPLY FOR STORAGE TANK AND TERRACE TANK CAPACITY. |
| 6 | Sewer System UNDER GROUND SYSTEM USING SEWER PIPES WITH 300KLD CAPACITY. |
| 7 | Drain UNDERGROUND SYSTEM USING UPVC PIPE |
| 8 | Parks AS PER BYE LAWS OF GDA 10 GREEN AREA PROVIDED WITH TREES. ARE AS PER APPROVED MAP OF GREEN AREA 661.321 MTR. |
| 9 | Tree Planting TREE PLANTING AS PER APPROVED DRAWINGS BY GDA. ALSO PROVIDED IN PARKS AND FRONT OF PROJECT ENTRY GATE. AS PER APPROVED LAYOUT REQUIRED NO. OF TREE 38. |
| 10 | Design For Electric Supply Including Street Lighting TRANSFORMERS (COMPACT SUB STATION) SHALL BE USED ALONG WITH NECESSARY SWITCH GEAR FOR DISTRIBUTING ELECTRICITY AT LT VOLTAGE. TOTAL POWER REQUIRED 778 KVA AND PROVIDE DG SET.
ALL STREET LIGHT SHALL BE LED BASED FOR ENERGY SAVING. |
| 11 | Community Buildings COMMUNITY SPACE AS PER APPROVED DRAWINGS BY GDA. |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP OF 300 KLD CAPACITY SHALL BE PROVIDED. TREATMENT WATER SHALL BE USED FOR FLUSHING,IRRIGATION, CAR WASHING,PATHWAYS CLEANING AND EXCESS WATER SHALL BE DISCHARGED INTO THE MINICIPAL SEWER AS PER SITE. |
| 13 | Solid Waste Management And Disposal System SOLID WASTE COLLECTION DUSTBINS PROPOSED IN EACH TOER. RECYCLE AND NON RECYCLE WASTE WILL BE DISPOSED THROUGH A LOCAL APPROVED AGENCY. |
| 14 | Water Conservation System 2 NOS RAINWATER HARVESTING FACILITIES SHALL BE PROVIDED AND TREATED SEWRAGE WATER SHALL BE RECYCLED TO THE EXTENT FEASIBLE. |
| 15 | Energy Management System Including Use of Renewable Energy SOLAR PANEL SHALL BE PROVIDED FOR STREET LIGHTS. |
| 16 | Fire Protection And Fire Safety System FIRE TENDER PATH SHALL BE PROVIDED AS PER NBC. FIRE FIGHTING SYSTEM ALONG WITH PUMP AND WATER STORAGE TANKS SHALL BE PROVIDED AS PER NBC AND NOC UPES/2021/40712/GZB/GHAZIABAD/2888/CFO FROM FIRE DEPTT. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services COMMUNITY SPACE AS PER APPROVED DRAWING BY GDA |
| 18 | Emergency Evacuation Services FIRE STAIR CASE HAVE BEEN PROVIDED AS PER APPROVED FIRE NOC UPFS/2021/40712/GZB/GHAZIABAD/2888/CFO FOR EVACUATION. |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 14 Dec 2027.
Sanctioned by Ghaziabad Development Authority · 6,578 sqm of land · an approved plan of 2 blocks and 425 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 15/PMAY/GDA/MP/2018-19 | 15 Dec 2022 | 14 Dec 2027 | 14 Dec 2030 | 14 Dec 2027 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
24 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1174 | 6578 | Khasra |
| Registry document · 8463 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 348 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 19 Apr 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 14 Apr 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Mar 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Mar 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 26 Apr 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 26 Apr 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 27 Apr 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 13 May 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 19 Apr 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 21 May 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 14 Apr 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 14 Apr 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 10 May 2023 ↗ |
Quarterly progress reports
14 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
14 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 79.87% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 62.79% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 78.39% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 91% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ROCKFORT DEVELOPERS PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM16447 |
| PAN | AADCR2038R |
| CIN / TAN | U70101DL2004PTC127749 |
| Name of chairman | ARUN KUMAR AGGARWAL |
| Registered address | 106,SASCO BHAWAN, AZADPUR COMMERCIAL COMPLEX, AZADPUR, DELHI-110033 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | GSA ENTERPRISES PVT LTD |
| Role | Co-promoter |
| Applicant type | Company |
| Address | HOUSE NO 65, 2ND FLOOR MODEL TOWN NORTH EXTN. DELHI North Delhi DL 110009 |
| RERA contact |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | ROCKFORT DEVELOPERS PVT LTD COLLECTION A/C FOR SHRIRAM NORTH VIEW APTSBankIDBI BANKBranchVASUNDHRABranch addressSEC-9 VASUNDHRA GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCIBKL0001990Branch emailIBKL0001990IDBI.CO.IN |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | ROCKFORT DEVELOPERS PVT LTD SEPARATE BANK A/C FOR SHRIRAM NORTH VIEW APTSBankIDBI BANK LTDBranchVASUNDHRABranch addressSEC-9 VASUNDHRABranch districtGhaziabad, Uttar PradeshA/C no.IFSCIBKL0001990 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | ROCKFORT DEVELOPERS PVT LTD TRANSACTION A/C FOR SHRIRAM NORTH VIEW APTSBankIDBI BANKBranchVASUNDHRABranch addressSEC-9 VASUNDHRA GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCIBKL0001990Branch emailIBKL0001990IDBI.CO.IN |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about SHRIRAM NORTH VIEW APPARTMENTS
Is SHRIRAM NORTH VIEW APPARTMENTS RERA registered?
Yes. SHRIRAM NORTH VIEW APPARTMENTS is registered with UPRERA under registration number UPRERAPRJ320381, registered on 10 Jun 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SHRIRAM NORTH VIEW APPARTMENTS?
The completion date filed with UPRERA is 14 Dec 2027. No completion certificate is on record yet.
Who is the builder of SHRIRAM NORTH VIEW APPARTMENTS?
ROCKFORT DEVELOPERS PVT LTD is the promoter entity that filed SHRIRAM NORTH VIEW APPARTMENTS with UPRERA (promoter RERA ID UPRERAPRM16447). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does SHRIRAM NORTH VIEW APPARTMENTS have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SHRIRAM NORTH VIEW APPARTMENTS located?
SHRIRAM NORTH VIEW APPARTMENTS is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in SHRIRAM NORTH VIEW APPARTMENTS?
The unit plan filed with UPRERA lists 3 BHK, 1 BHK, 2 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SHRIRAM NORTH VIEW APPARTMENTS?
The approved unit plan filed with UPRERA runs from 10 to 82 m² of carpet area (about 107 to 882 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SHRIRAM NORTH VIEW APPARTMENTS?
The approved unit plan describes 2 blocks and 425 units of which 407 are homes and 18 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SHRIRAM NORTH VIEW APPARTMENTS?
About 261 units per acre: 425 planned units across 1.63 acres (6,578 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗