Aradhyam Plot C

UPRERARegistered

Aradhyam Plot C is a RERA-registered residential project by Aradhyam Builders in Village Pasonda, Ghaziabad (RERA ID UPRERAPRJ794498). Registered with a completion deadline of 30 Jul 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jan–Mar 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'24
—Q3'24
—Q4'24
—Q1'25
—Q2'25
47.2%Q3'25
56.81%Q4'25
64.76%Q1'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ794498
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Apr 2023
Project duration40 months
AddressKhasna No. 290, 291, 294, Village Pasonda, Ghaziabad, 201001, Village Pasonda, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typePartnership Firm
Applicant addressMange Ram Bhatta Company, Khasra No. 988 and 989, NH 58, Opposite Jain Tube Company, Meerut Road, Ghaziabad, Uttar Pradesh- 201001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    230, MAP NO. 09/PMAYGDA/M.P./2018

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 Aug 2024
Original completion31 Mar 2026
Revised completion30 Jul 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary18 Aug 2026
Registration fee₹25,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors316 · 2 · 14 (units from plan)
  • 1 BHK251 79%
  • 2 BHK65 21%
ConfigurationUnitsCarpet area
2 BHK6543-45
1 BHK25123-25
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block-A (Part-A) · 2 BHK136543-45
Block-A (Part-X-EWS) · 1 BHK1425123-25
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Anuj Agarwal
License CA/96/19503
A-244, Kaushambi, Ghaziabad
Engineer
Akhilesh Singh
Pkt.-8, Plot No. 245, Sector-23, Rohini, New Delhi-85
Contractor
Naveen Tiwari
J-2 Mahendra enclave, Shastri Nagar, Ghaziabad, U.P.
Sr.Development work declared to RERA
1Demarcation of Plots
Plot-C Kh. no. 290m, 291m and 294m Village pasonda, Ghaziabad
2Boundary Wall
230mm wide and 2.1 metre high earthquake resistant boundary wall of RCC/ Mild steel/ brick filled.
3Road Work
All roads in the complex will in combination of concrete pavers of different colors, shape thickness. Roads will be laid over 225 mm water bound macadam.
4Footpaths
All footpaths in the complex will be in combiantion of concrete pavers of different colors, shape and thickness of 65mm and 80mm laid over 150mm water bound macadam surface.
5Water Supply Including Drinking Water Facilities
Potable water supply from Muncipal Water supply shall be collected in underground collection tank and pumped to overhead water tank. The supply of water to individual flats shall be from said overhead and tanks.
6Sewer System
The sewage will be collected through a soil pipeline arrangement, bends and inspection chambers lending to the sewage water treatment plan (STP) of the project and treated water be used to irrigation and flushing purpose.
7Drain
Drains having a minimum width of 150 mm will be provided for collection and channelisation rain water (surface runoff)
8Parks
Internal park will be provided and maintained.
9Tree Planting
The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted a manner to ensure that there is no hindance in the services/ usage in the Project.
10Design For Electric Supply Including Street Lighting
Electric supply provided through 11/0.433 KV transformers and by DG set supply for backup.
11Community Buildings
Community facilities area has been designed as per authority norms and facilities.
12Treatment and Disposal System of Sewage and Sullage water
Sewage shall be reated in Sewage Treatment Plan (STP) and thereafter treated water to be used for flushing and irrigation.
13Solid Waste Management And Disposal System
Solid waste to be collected from individual flats and stored in garbage room. Recylable shall be processed in the Discharges in the municipal drains. Treated sewage shall be used for irrigation and flushing.
14Water Conservation System
Rain water harvesting pitsshall be provided for ground water recharging and overflow to be discharges in the municipal drains. Treated sewage shall be used for irrigation and flushing.
15Energy Management System Including Use of Renewable Energy
Single/ Multi point metering will be there for energy purchased from the gird/ power supply company.
16Fire Protection And Fire Safety System
Sprinkler, fire doors, yard hydrants, smoke detector and fire alarm system will be provided as applicable.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not applicable
18Emergency Evacuation Services
Fire staircases shall be provided as per the approved fire drawing for evacuatin to open areas.
19Other Miscellaneous Work
Not applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 31 Aug 2026.

Sanctioned by Ghaziabad Development Authority · 4,085 sqm of land · an approved plan of 2 blocks and 316 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
230, MAP NO. 09/PMAYGDA/M.P./201831 Aug 202131 Aug 202631 Aug 202931 Mar 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jul 2026.

#Granted fromExtended uptoNote
131 Mar 202630 Jul 2026Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2903016Khasra
2911069.59Khasra
294218Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 43468
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 575
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 17020
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 909
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 19920
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New12 Aug 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New15 Jun 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New15 Jun 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New15 Jun 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New15 Jun 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New15 Jun 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New15 Jun 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New15 Jun 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New12 Jul 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New23 Jul 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New15 Jun 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New15 Jun 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New12 Jul 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New15 Jun 2024 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2025-Q4.

QuarterConstructionCertificates
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q247.2%CA ↗ · Arch ↗ · Eng ↗
2025-Q356.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q464.76%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAradhyam Builders
RolePromoter · current
RERA IDUPRERAPRM190650
PANABMFA7797H
CIN / TANMRTA16948B
Registered addressMange Ram Bhatta Company, Khasra No. 988 and 989, NH 58, Opposite Jain Tube Company, Meerut Road, Ghaziabad, Uttar Pradesh- 201001
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameVIJAY KUMAR
RoleCo-promoter
Applicant typeIndividual
AddressR-2/ 177 Raj Nagar, Ghaziabad, Uttar Pradesh- 201002
RERA contact

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ARADHYAM BUILDERS COLLECTION AC FOR ARADHYAM PLOT CBankSTATE BANK OF INDIABranchNavyug Market, GhaziabadBranch addressNavyug Market, Ghaziabad, 201001Branch districtUttar PradeshA/C no.IFSCSBIN0009298Branch emailsbi.09298@sbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ARADHYAM BUILDERS SEPARATE BANK AC FOR ARADHYAM PLOT CBankSTATE BANK OF INDIABranchNavyug Market, GhaziabadBranch addressNavyug Market, Ghaziabad, 201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCSBIN0009298
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ARADHYAM BUILDERS- RERA TRANSACTION AC FOR ARADHYAM PLOT CBankSTATE BANK OF INDIABranchNavyug Market, GhaziabadBranch addressNavyug Market, Ghaziabad, 201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCSBIN0009298
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Revised completion date on file2026-07-31 → 2026-07-30
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2026-07-31 → 2026-07-30
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-03-31 → 2026-07-31
changed in Estanzo’s record
5 Sept 2026
Actual completion2026-08-18
first recorded by Estanzo
23 Aug 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Aradhyam Plot C

Is Aradhyam Plot C RERA registered?

Yes. Aradhyam Plot C is registered with UPRERA under registration number UPRERAPRJ794498, registered on 26 Aug 2024. Estanzo reproduces that filing; it does not verify the work behind it.

Has Aradhyam Plot C been completed?

UPRERA still lists Aradhyam Plot C as Registered, so it is not shown as completed here. A completion certificate dated 18 Aug 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Aradhyam Plot C?

Aradhyam Builders is the promoter entity that filed Aradhyam Plot C with UPRERA (promoter RERA ID UPRERAPRM190650). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Aradhyam Plot C more time to complete?

UPRERA's record carries 1 completion extension for Aradhyam Plot C, the latest running to 30 Jul 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Aradhyam Plot C have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Aradhyam Plot C located?

Aradhyam Plot C is registered in Village Pasonda, Ghaziabad, as filed with UPRERA.

What configurations are available in Aradhyam Plot C?

The unit plan filed with UPRERA lists 2 BHK and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Aradhyam Plot C?

The approved unit plan filed with UPRERA runs from 23 to 45 m² of carpet area (about 243 to 481 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Aradhyam Plot C?

The approved unit plan describes 2 blocks and 316 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Aradhyam Plot C?

About 313 units per acre: 316 planned units across 1.01 acres (4,085 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗