Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6531
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start28 Aug 2016
Original start28 Aug 2016
Project duration82 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressA-90, NATHU COLONY SHAHDARA DELHI-110093
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 2 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered5 Aug 2017
Original completion24 Aug 2021
Revised completion31 May 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹39,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors275 · 2 · 12 (units from plan)
Homes · commercial units268 · 7 (shops and offices filed in the same plan)
  • 2 BHK174 63%
  • 3 BHK87 32%
  • 4 BHK7 3%
  • SHOP7 3%
ConfigurationUnitsCarpet area
3 BHK8710-116
2 BHK17452-62
4 BHK7123-124
SHOP729-33
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower A · OTHER, 3 BHK, 2 BHK, 4 BHK, SHOP1214229-123
Tower B · OTHER, 3 BHK, 2 BHK, 4 BHK1113310-124
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 592.66 m² for a 2 BHK, 592.66 m² for a 2 BHK, 592.66 m² for a 2 BHK and 4 other units like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANUJ AGARAWAL
License CA/96/19503
A-244, KAUSHABMI, GHAZIABAD-201010
Engineer
SADANAND OJHA
SWATI STRUCTURE SOLUTION PVT LTD, H.O. 503, SACHDEVA CORPORATE TOWER PLOT NO.8, ROHINI, DELHI-110085
Contractor
Ram Nath
441/A, SHANKAR MARG, MANDAWALI, FAZALPUR, DELHI-110092
Sr.Development work declared to RERA
1Demarcation of Plots
Not Developed
2Boundary Wall
Not Developed
3Road Work
Not Developed
4Footpaths
Not Developed
5Water Supply Including Drinking Water Facilities
Not Developed till now
6Sewer System
Not Developed till now
7Drain
Not Developed till now
8Parks
Not Developed till now
9Tree Planting
Not Developed till now
10Design For Electric Supply Including Street Lighting
Not Developed till now
11Community Buildings
Not Developed till now
12Treatment and Disposal System of Sewage and Sullage water
Not Developed till now
13Solid Waste Management And Disposal System
Not Developed till now
14Water Conservation System
Not Developed till now
15Energy Management System Including Use of Renewable Energy
Not Developed till now
16Fire Protection And Fire Safety System
Not Developed till now
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not Developed till now
18Emergency Evacuation Services
Not Developed till now
19Other Miscellaneous Work
No
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 13 Jan 2022.

Sanctioned by Ghaziabad Development Authority · 6,741 sqm of land · an approved plan of 2 blocks and 275 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
569/Zone-8/15-1625 Jun 201613 Jan 2022—24 Aug 2021
569/Zone-8/15-1625 Jun 201624 Jun 202124 Jun 202423 Feb 2022
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 31 May 2023.

#Granted fromExtended uptoNote
124 Aug 202123 Feb 2022Six months extension in view of force majeure caused by covid-19 pandemic
223 Feb 202230 Nov 2022—
330 Nov 202231 May 2023—

Land & documents

4 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
PLOT NO. - GH-07 KOYAL ENCLAVE6740.88—
GH-7, KOELENCLAVE YOJNA, GHAZIABAD6741Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 19 Mar 2015.

Registry no.DateTypeArea
AGREEMENT19 Mar 2015other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 2066
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New9 Dec 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New20 May 2022 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterNOT REQUIRED
Fire safety (as filed with RERA)AS/FIRE DEPT NOC
Renewable energyAS/SANCTIONED DRAWING
Other facilitiesN.A.

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameANDROMIDA REAL ESTATE CONSORTIUM PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM10116
PANAAMCA7164Q
CIN / TANU70109DL2014PTC268376
Name of chairmanSHESHDHAR PABDEY
Registered addressA-90, NATHU COLONY SHAHDARA DELHI-110093
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Andromida Real state Consortium Pvt ltdBankAxisBranchVishwas Nagar DelhiA/C no.IFSCUTIB0002454
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)22 (Under Registration - 13 ) → 23 (Under Registration - 14 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)9 (Under Registration - 0 ) → 22 (Under Registration - 13 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 31 Aug 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Andromida Planet One

Is Andromida Planet One RERA registered?

Yes. Andromida Planet One is registered with UPRERA under registration number UPRERAPRJ6531, registered on 5 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Andromida Planet One?

The completion date filed with UPRERA is 31 May 2023. No completion certificate is on record yet.

Who is the builder of Andromida Planet One?

ANDROMIDA REAL ESTATE CONSORTIUM PVT. LTD. is the promoter entity that filed Andromida Planet One with UPRERA (promoter RERA ID UPRERAPRM10116). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Andromida Planet One more time to complete?

UPRERA's record carries 3 completion extensions for Andromida Planet One, the latest running to 31 May 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Andromida Planet One have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Andromida Planet One located?

Andromida Planet One is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Andromida Planet One?

The unit plan filed with UPRERA lists OTHER, 3 BHK, 2 BHK, 4 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Andromida Planet One?

The approved unit plan filed with UPRERA runs from 10 to 124 m² of carpet area (about 111 to 1,339 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Andromida Planet One?

The approved unit plan describes 2 blocks and 275 units of which 268 are homes and 7 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Andromida Planet One?

About 165 units per acre: 275 planned units across 1.67 acres (6,741 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗