Gold Coast City Walk

UPRERARegistered

Gold Coast City Walk is a RERA-registered commercial project by GOLD COAST DEVELOPERS PVT. LTD. in Ghaziabad (RERA ID UPRERAPRJ892294). Registered with a completion deadline of 23 Jul 2026. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ892294
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Jan 2022
Project duration55 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressRegd. Office A-106, Pkt-4 Pandav Nagar Mayur Vihar East Delhi DL 110091 Corporate Office Khasra no. 976, 975 Plot no .Commerical Center - 05, Ansal Sushant Aquapolis Crossing Republic, Ghaziabad-201001 Site Office Khasra no. 976, 975 Plot no. Commerical Center - 05, Ansal Sushant Aquapolis Crossing Republic, Ghaziabad-201001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Commercial Building/01314/GDA/BP/21-22/0111/10052021

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Dec 2021
Original completion23 Jul 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹40,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors180 · 1 · 4 (units from plan)
Homes · commercial units0 · 180 (shops and offices filed in the same plan)
ConfigurationUnitsCarpet area
SHOP1808-88
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Commercial · SHOP41808-88
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Amit Kumar
License CA/98/22706
Modarch India, B- 99, First Floor, Sector 63, NOIDA
Engineer
Hari Om Gera
3rd Floor, Abhishek Plaza, Part-1, Pocket B, Mayur Vihar, Phase-2, East Delhi, Delhi, PIN- 110091
Contractor
Raghuveer Singh
53, Basement, Vinoba Puri, Lajpat Nagar-II, New Delhi, DL- PIN 110024
Sr.Development work declared to RERA
1Demarcation of Plots
Khasra No. 976,975 Plot No. Commercial Center , 05-Ansal Sushant Aquapolis Crossing Republic, Ghaziabad
2Boundary Wall
Left, Right, and Rear Side Boundary Wall 2.4 M. High and Front Boundary Wall of 1.8 M High Provided.
3Road Work
6 Mt. Wide Fire Tender Path with filling From under and Concrete Work.
4Footpaths
Interlocking Pavers on The Edges of Internal Road Provided and on Specific Green Area.
5Water Supply Including Drinking Water Facilities
100 Dia Municipal Water Line to Fill Ugt, Water Supply From UG / oh Tanks Supplied From Water Centres.
6Sewer System
PVC Pipes for Sewer Line Relating to the Project shall be connected with the main line of Ansal API Township
7Drain
250 Dia PVC pipes for Underground Drain Pipes with Chamber
8Parks
Not Applicable
9Tree Planting
Tree Planting has been Designed as per Authority Guidelines and also provided with 21 Evergreen Trees and soft Landscaping Including Grass and Small Plants.
10Design For Electric Supply Including Street Lighting
PVC Coated Copper Wiring from ANSAL API and others, armoured Cable From Meter Board to Panels. Street Lights with Pole, CFL, Lights with Fixtures in Lobby, Tube Lights in Basement Pump Room.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
STP Capacity provided (by adding 20 percent as per MOEF) of 26 KLD
13Solid Waste Management And Disposal System
Door to Door Collection and will be Disposed.
14Water Conservation System
Recycling Treated Water and Provided 02 No. Sets of Recharge Pit and Desilting Tank.
15Energy Management System Including Use of Renewable Energy
Not Applicable
16Fire Protection And Fire Safety System
150 Dia Fire Hydrant Ring Running at Basement Ceiling, 150 Dia 4 way Fire Brigade inlet Connection for Internal Risers, 100 Dia 2 way Fire Brigade Draw out Connection, 150 Dia 4 Way Fire Brigade inlet Connection for U.G. Tank Filling , Fire and plumbing Tanks Provided at Basement with Adequate Fir Tanks
17Social Infrastructure And Other Public Amenities Including Public Health Services
Circulation Area of Driveway and Ramp, Ventilation shafts with Blower Room for Basement , Fire Escape, Staircases and MEP Services etc.
18Emergency Evacuation Services
Fire Escape Staircase Provided with Adequate Escapes to the Open Ground and Open Corridors , Balcony for Refuge Areas can be used and Rest All Measures have been Taken as per Fire Department.
19Other Miscellaneous Work
Misc. Work done as per Requirement
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 23 Jul 2026.

Sanctioned by Ghaziabad Development Authority · 3,000 sqm of land · an approved plan of 1 block and 180 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Commercial Building/01314/GDA/BP/21-22/0111/1005202124 Jul 202123 Jul 202623 Jul 202923 Jul 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
976,9753000Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 381
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2532
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · Affidavit
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Reply Letter to UPRERA for Project Registration
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Land Share Certificate
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · 3746
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New13 Nov 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New9 Dec 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New9 Dec 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New9 Dec 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New13 Nov 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New13 Nov 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New13 Nov 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New13 Nov 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New13 Nov 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Dec 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Nov 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Nov 2021 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2024-Q1.

QuarterConstructionCertificates
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGOLD COAST DEVELOPERS PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM150013
PANAAGCG1629J
CIN / TANMRTG10529B
Name of chairmanVIKAS PUNDIR
Registered addressRegd. Office A-106, Pkt-4 Pandav Nagar Mayur Vihar East Delhi DL 110091 Corporate Office Khasra no. 976, 975 Plot no .Commerical Center - 05, Ansal Sushant Aquapolis Crossing Republic, Ghaziabad-201001 Site Office Khasra no. 976, 975 Plot no. Commerical Center - 05, Ansal Sushant Aquapolis Crossing Republic, Ghaziabad-201001
RERA contact
Registered since2021
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameANSAL PROPERTIES & INFRASTRUCTURE LIMITED
RoleCo-promoter · current
RERA IDUPRERAPRM6378
Applicant typeCompany
PANAAACA0006D
CIN / TANL45101DL1967PLC004759
Name of chairmanSUSHIL ANSAL
Registered address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
RERA contact
Registered since2017
Legal nameRAJENDRA KUMAR TYAGI
RoleCo-promoter
Applicant typeIndividual
AddressRDC,123,Raj Nagar, Ghaziabad- 201002
RERA contact
Legal nameRAJMUNI TYAGI
RoleCo-promoter
Applicant typeIndividual
AddressWard No. 7, Niwari Dehat, Ghaziabad -201204
RERA contact
Legal nameDAULATRAM AND SONS INFRASTRUCURE PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressRegd. Office H.NO:-122, RDC RAJNAGAR GHAZIABAD Ghaziabad UP,201002 Corporate Office 05 Ansal Sushant aquapolis, crossing republic Gzb.
RERA contact
Legal nameBHUPENDRA KUMAR TYAGI
RoleCo-promoter
Applicant typeIndividual
AddressR-14/21 , Raj Nagar, Ghaziabad- 201001
RERA contact

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Gold Coast Developers Pvt. Ltd. Collection Account for Gold Coast City WalkBankPunjab National BankBranchCrossing Republic, GhaziabadBranch addressPNB, Crossing Republic, Ghaziabad, Uttar Pradesh, PIN- 201016Branch districtGhaziabadA/C no.IFSCPUNB0778900
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Gold Coast Developers Pvt. Ltd. Separate Bank Account for Gold Coast City WalkBankPunjab National BankBranchCrossing Republic, GhaziabadBranch addressPNB, Crossing Republic, Ghaziabad, Uttar Pradesh, PIN- 201016Branch districtGhaziabadA/C no.IFSCPUNB0778900
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Gold Coast Developers Pvt. Ltd. RERA Transaction Account for Gold Coast City WalkBankPunjab National BankBranchCrossing Republic, GhaziabadBranch addressPNB, Crossing Republic, Ghaziabad, Uttar Pradesh, PIN- 201016Branch districtGhaziabadA/C no.IFSCPUNB0778900
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Gold Coast City Walk

Is Gold Coast City Walk RERA registered?

Yes. Gold Coast City Walk is registered with UPRERA under registration number UPRERAPRJ892294, registered on 21 Dec 2021. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Gold Coast City Walk?

The completion date filed with UPRERA is 23 Jul 2026. No completion certificate is on record yet.

Who is the builder of Gold Coast City Walk?

GOLD COAST DEVELOPERS PVT. LTD. is the promoter entity that filed Gold Coast City Walk with UPRERA (promoter RERA ID UPRERAPRM150013). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Gold Coast City Walk show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Does Gold Coast City Walk have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Gold Coast City Walk located?

Gold Coast City Walk is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Gold Coast City Walk?

The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Gold Coast City Walk?

The approved unit plan filed with UPRERA runs from 8 to 88 m² of carpet area (about 89 to 949 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Gold Coast City Walk?

The approved unit plan describes 1 block and 180 units of which 0 are homes and 180 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Gold Coast City Walk?

About 243 units per acre: 180 planned units across 0.74 acres (3,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗