ATS RHAPSODY is a RERA-registered residential project by ATS Township Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ4115). Registered with a completion deadline of 30 Mar 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ4115 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Oct 2017 |
| Original start | 1 Oct 2017 |
| Project duration | 90 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | ATS Tower, Plot-16, Sector-135, Noida-201305 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
PLG/BP - 3804/249
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 1 Oct 2024 |
| Revised completion | 30 Mar 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 21 Aug 2024 |
| Registration fee | ₹1,21,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK328 57%
- 4 BHK234 40%
- SHOP17 3%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 234 | 146-240 |
| 3 BHK | 328 | 103-112 |
| SHOP | 17 | 10-48 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| COMMERCIAL · OTHER, SHOP | 3 | 17 | 10-48 |
| TOWER-1, 2 & 5 · OTHER, 4 BHK, 3 BHK | 32 | 334 | 103-240 |
| TOWER-3,4,6 & 7 · OTHER, 4 BHK | 32 | 228 | 146-146 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots YES |
| 2 | Boundary Wall YES |
| 3 | Road Work YES |
| 4 | Footpaths YES |
| 5 | Water Supply Including Drinking Water Facilities YES |
| 6 | Sewer System YES |
| 7 | Drain YES |
| 8 | Parks YES |
| 9 | Tree Planting YES |
| 10 | Design For Electric Supply Including Street Lighting YES |
| 11 | Community Buildings YES |
| 12 | Treatment and Disposal System of Sewage and Sullage water YES |
| 13 | Solid Waste Management And Disposal System YES |
| 14 | Water Conservation System YES |
| 15 | Energy Management System Including Use of Renewable Energy YES |
| 16 | Fire Protection And Fire Safety System YES |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services YES |
| 19 | Other Miscellaneous Work NA |
Registered agents
16 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | Addressofchoice Realty Pvt Ltd | UPRERAAGT14990 |
| 3 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 4 | ANIL RAWAT | UPRERAAGT13580 |
| 5 | EMPOWER REALTECH PRIVATE LIMITED | UPRERAAGT10623 |
| 6 | GATEWAY PROPMART PVT LTD | UPRERAAGT10384 |
| 7 | JAI AMBEY CONSULTANTS | UPRERAAGT11064 |
| 8 | PC MANTRA INFOSYSTEM PVT. LTD. | UPRERAAGT10580 |
| 9 | PROPONOMICS (Prop-Praveen Kumar) | UPRERAAGT14976 |
| 10 | PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED) | UPRERAAGT10032 |
| 11 | REALTY WORLD INFRATECH PVT. LTD. | UPRERAAGT10531 |
| 12 | REDMAPLE BUILDIKO PRIVATE LIMITED | UPRERAAGT14395 |
| 13 | RELIOBRIX CONSULTING PRIVATE LIMITED | UPRERAAGT10049 |
| 14 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 15 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 16 | star estate | UPRERAAGT10202 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 5 Mar 2022.
Sanctioned by Greater Noida Authority · 23,144 sqm of land · an approved plan of 3 blocks and 579 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| PLG/BP - 3804/249 | 6 Mar 2017 | 5 Mar 2022 | 5 Mar 2027 | 1 Oct 2024 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Mar 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 1 Oct 2024 | 30 Mar 2025 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
27 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| PLOT NO. GH-12/1, SECTOR-01, GREATER NOIDA, UP | 23144 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 16 Sept 2014.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 29688 | 16 Sept 2014 | self | — |
| Lease deed · 29688 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 20 Jun 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 29 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Jan 2018 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 11 Jan 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 11 Jan 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 11 Jan 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 11 Jan 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 11 Jan 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 11 Jan 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 11 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 11 Jan 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES PROPOSED |
| Fire safety (as filed with RERA) | YES PROPOSED |
| Renewable energy | YES PROPOSED |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ATS Township Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2414 |
| PAN | AAHCA6981C |
| CIN / TAN | U45300DL2008PTC177429 |
| Name of chairman | Mr. Getamber Anand |
| Registered address | ATS Tower, Plot-16, Sector-135, Noida-201305 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | ATS TOWNSHIP PRIVATE LIMITED-RETENTION ACCOUNTBankICICI BANKBranchICICI BANK K-1,SENIOR MALL,SECTOR-18,NOIDA,UP-201301A/C no.IFSCICIC0000031 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 12 (Under Registration - 1 ) → 12 (Under Registration - 0 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 16 Aug 2026 |
Common questions about ATS RHAPSODY
Is ATS RHAPSODY RERA registered?
Yes. ATS RHAPSODY is registered with UPRERA under registration number UPRERAPRJ4115, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has ATS RHAPSODY been completed?
UPRERA still lists ATS RHAPSODY as Registered, so it is not shown as completed here. A completion certificate dated 21 Aug 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of ATS RHAPSODY?
ATS Township Private Limited is the promoter entity that filed ATS RHAPSODY with UPRERA (promoter RERA ID UPRERAPRM2414). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted ATS RHAPSODY more time to complete?
UPRERA's record carries 1 completion extension for ATS RHAPSODY, the latest running to 30 Mar 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does ATS RHAPSODY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ATS RHAPSODY located?
ATS RHAPSODY is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in ATS RHAPSODY?
The unit plan filed with UPRERA lists OTHER, 4 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in ATS RHAPSODY?
The approved unit plan filed with UPRERA runs from 10 to 240 m² of carpet area (about 109 to 2,585 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in ATS RHAPSODY?
The approved unit plan describes 3 blocks and 579 units of which 562 are homes and 17 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is ATS RHAPSODY?
About 101 units per acre: 579 planned units across 5.72 acres (23,144 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗