SOBHA RIVANA

UPRERARegistered

SOBHA RIVANA is a RERA-registered residential project by SOBHA LIMITED in GREATER NOIDA, Gautam Budh Nagar (RERA ID UPRERAPRJ313638). Registered with a completion deadline of 7 Feb 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ313638
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Apr 2026
Project duration59 months
AddressGH-12, SECTOR-01, GREATER NOIDA, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant addressSobha Limited, Sarjapur-Marthahalli Outer Ring Road, Bellandur Post, Bangalore - 560103
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP-SM-21-JAN-2026-27232

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered20 Mar 2026
Original completion7 Feb 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,43,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,367 · 9 · 45 (units from plan)
  • 3 BHK1,010 74%
  • 2 BHK181 13%
  • 4 BHK175 13%
  • OTHER1 <1%
ConfigurationUnitsCarpet area
3 BHK1,01087-101
2 BHK18169-101
OTHER11,012
4 BHK175123-137
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Commercial Block · OTHER111,012
Tower 1 · 3 BHK, 2 BHK, OTHER4416769-101
Tower 2 · 2 BHK, 3 BHK, OTHER4517169-101
Tower 3 · 3 BHK, 2 BHK, OTHER4517279-101
Tower 4 · 4 BHK, 3 BHK, 2 BHK, OTHER4517079-137
Tower 5 · 2 BHK, 3 BHK, 4 BHK, OTHER4517179-124
Tower 6 · 4 BHK, 3 BHK, 2 BHK, OTHER4517179-123
Tower 7 · 3 BHK, 2 BHK, OTHER4517169-101
Tower 8 · 2 BHK, 4 BHK, 3 BHK, OTHER4517369-137
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
VENKATESH GUDI
License CA/2005/36913
SARJAPUR-MARTHAHALLI, OUTER RING ROAD, BELLANDUR POST, BANGLORE-KARNATAKA-560103
Engineer
SRINIVAS SATHYANARAYAN
SARJAPUR-MARHAHALLI, OUTER RING ROAD, BELLANDUR POST, BANGLORE, KARNATAKA-560103
Contractor
SOBHA LIMITED
SARJAPUR-MARTHAHALLI, OUTER RING ROAD, BALLANDUR POST, BANGLORE-KARNATAKA-560103
Sr.Development work declared to RERA
1Demarcation of Plots
Projects site is located in Sector-01, Greater Noida, Plot No.GH-12, 47605 sqm plot area, as per the site plan and possession letter.
2Boundary Wall
Length 1192.3 Rmt, Height -2.1 Rmt, Material Used - Brick Solid Block - 200mm Thick Super Structure, Material Used -RCC, RCC Substructure, Appearance Painting
3Road Work
Total Road Length with width -865m Length x 9m Width Diver way roads, No of Lanes 1 No, Type of Pavements-Paver, type of Drainage-storm and surface.
4Footpaths
Total Length with width 930m Length x 1.8m Width, Wake Way length Crossings - Material Used -Paver+ Granite, Wake Way finish.
5Water Supply Including Drinking Water Facilities
No of Water Connections - 2 , Municipal water and Tanker supply, Tank Capacity - 2460 KL (UG Sump, OHT, Service floor Tanks), No of Hydrants-484, Hydrant Water Source -Bore Water, Hydrant - Compliance with Quality Standards. The fire hydrant system is designed, Supplied and installed in compliance with NBC 2016 and relevant Indian Standards, using approved and ISI-marked materials.
6Sewer System
Length of sewer lines -280 meters, Farthest point to STP Running through the external and basement, Pipe Size-250 mm, No of Manholes-29 Nos (Soil-9 Nos, Waste-5 Nos, Storm water-15 Nos), Manhole Type - Gravity, Manhole Material Used -Brick Work, Manhole Network Design-Gravity
7Drain
Length and Width 1150x600, No of Open/ Covered drains -1 Covered trench Drain Type-Storm and Surface, Drain Material Used -Concrete Trench, Drain Disposal Method -Percolation pit and overflow to municipal drain
8Parks
Area-21109 Sq.m, No of Parks-1 Nos, No of Trees/ Plants -412 Nos, As per Landscaping dwg., Landscaping Features-Grass+ Granite pathway, Type of Parks - Pet Park
9Tree Planting
No of Trees / Plants -412, Types / Species-Chukrasia Tubularis, Plumeria Alba, Alstonia Scholaries, Bauhinea Blakeana, Tabibia Avellande, Plumeria Rubra, Solanum Macerantum, Plumeria Lutea, gravillea Robusta Delonix regia, Spacing -3.6 - 4 meter, Native / Exotic Trees - Native / Exotic, x Maintenance Plan-Treated Waste Water and Bore well
10Design For Electric Supply Including Street Lighting
No of Poles -184 Nos, No of Lights -184 Nos, No of Transformer Units -2500kVA, 4 nos, and 2000 kVA, 2 nos. Type of lighting -LED
11Community Buildings
No of Buildings -1, Building Area -3000 Sq.m, Capacity- 1600 PPL, Construction Type -Conventional - RCC, Facilitie-Multipurpose Hall, Community Hall, squash court, Indoor Games, Badminton Court.
12Treatment and Disposal System of Sewage and Sullage water
STP capacity (KLD)-1350 KLD, Treatment Units-11 Nos, STP Type-Activated Sludge Process (ASP) technology and ultra filtration. Treated Water Usage -558 KLD. The surplus treated water will be discharged into the municipal sewer line after adequate assurance from the municipal authority.
13Solid Waste Management And Disposal System
Estimated waste (kg/day) -4,174 kg/day, Segregation Method- separate-colored bins for dry recyclables and biodegradable waste. For waste collection, an adequate number of colored bins, Composting/recycling method-Bio-degradable waste will be treated by OWC, Collection method -Colored bins
14Water Conservation System
Number and size of harvesting pits-recharge Wells 10 Nos, 600mm wide storm water drain with perforated cover on top, and access with grating at every 10 m interval. Water-efficient fixtures-Terrace Rain water and Surface water reuse Reuse/recharge strategy -Recharge Pits, System efficiency -Optimization of water usage, Technology Fixtures
15Energy Management System Including Use of Renewable Energy
(Renewable Energy) Solar capacity (kW)-191.1 kW, No of Panels -324 Nos, Type of renewable energy used-SOLAR, Grid Integration - YES, Backup Provisions - NO
16Fire Protection And Fire Safety System
Number of hydrants -484, Number of Fire exits-24, Number of sprinklers 30,835, System Type -Automatic, NBC Compliance - As per NBC , Fire Safety Training - Yes
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Number of evacuation points -24 Nos, Road Width 9 Meter, Signage Count - 2,476 Nos, Route Plan-Yes, Safety Measures-Yes, Public Awareness System - Public Address system, Emergency lighting and Exit signages.
19Other Miscellaneous Work
Work based on the nature of work (e.g., number of CCTV units, benches) Beautification efforts-Landscape and Trees, Signage elements-In entrance Structure, and One tower Terrace Level
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

3 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Ajeet KumarUPRERAAGT26090
2CHANDANIUPRERAAGT21015
3DIVYA AGARWALUPRERAAGT20823
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 9 Feb 2031.

Sanctioned by Greater Noida Authority · 47,605 sqm of land · an approved plan of 9 blocks and 1367 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP-SM-21-JAN-2026-2723210 Feb 20269 Feb 20318 Feb 20337 Feb 2031
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-12, SECTOR-01, GREATER NOIDA47605Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 19907
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · 58129-JOINT DEVELOPMENT AGREEMENT
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · PROP/BRS-03/2010/1717
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · CLARIFICATION DATED 10-03-2026, FOR LAND PREMIUM
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · AFFIDAVIT FOR NO LIEN, CHARGE ON RERA BANK ACCOUNT
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · LETTER TIME EXTENSION FOR LAND PREMIUM UNTILL 15-05-2026
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · AFFIDAVITS IN COMPLIANCE
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New23 Feb 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Feb 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New10 Feb 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New10 Feb 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New10 Feb 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New10 Feb 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New10 Feb 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New10 Feb 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Feb 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Feb 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New10 Feb 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New10 Feb 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New10 Feb 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New10 Mar 2026 ↗

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2026-Q1.

QuarterConstructionCertificates
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSOBHA LIMITED
RolePromoter · current
RERA IDUPRERAPRM361331
PANAABCS7723E
CIN / TANBLRS03591A
Name of chairmanRavi P N C Menon
Registered addressSobha Limited, Sarjapur-Marthahalli Outer Ring Road, Bellandur Post, Bangalore - 560103
RERA contact
Registered since2025
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameATLASPUR CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressC-28/121, TELIYABAGH, VARANASI-221002, U.P.
RERA contact

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SOBHA LIMITED COLLECTION ACCOUNT FOR SOBHA RIVANABankFEDERAL BANKBranchNOIDABranch addressFEDERAL TOWERS, H-362, SHOPPING COMPLEX, SECTOR-22, NOIDA, G B NAGAR, U.P.-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCFDRL0001340Branch emailNDA@federalbank.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SOBHA LIMITED SEPARATE BANK ACCOUNT FOR SOBHA RIVANABankFEDERAL BANKBranchNOIDABranch addressFEDERAL TOWERS, H-362, SHOPPING COMPLEX, SECTOR-22, NOIDA, G B NAGAR, U.P. -201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCFDRL0001340
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SOBHA LIMITED RERA TRANSACTION ACCOUNT FOR SOBHA RIVANABankFEDERAL BANKBranchNOIDABranch addressFEDERAL TOWERS, H-362, SHOPPING COMPLEX, SECTOR-22, NOIDA, G B NAGAR, U.P.-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCFDRL0001340
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SOBHA RIVANA

Is SOBHA RIVANA RERA registered?

Yes. SOBHA RIVANA is registered with UPRERA under registration number UPRERAPRJ313638, registered on 20 Mar 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SOBHA RIVANA?

The completion date filed with UPRERA is 7 Feb 2031. No completion certificate is on record yet.

Who is the builder of SOBHA RIVANA?

SOBHA LIMITED is the promoter entity that filed SOBHA RIVANA with UPRERA (promoter RERA ID UPRERAPRM361331). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SOBHA RIVANA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SOBHA RIVANA located?

SOBHA RIVANA is registered in GREATER NOIDA, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SOBHA RIVANA?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK, OTHER and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SOBHA RIVANA?

The approved unit plan filed with UPRERA runs from 69 to 1,012 m² of carpet area (about 742 to 10,893 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SOBHA RIVANA?

The approved unit plan describes 9 blocks and 1,367 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SOBHA RIVANA?

About 116 units per acre: 1,367 planned units across 11.76 acres (47,605 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗