Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ15180
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start5 Sept 2018
Project duration72 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressRegistered Office Address- Shop No. 111, Vardhman Mayur Market, CSC Kondli Ghharoli, New Delhi - 110096, Corporate Office Address- A-57, Sector-4, NOIDA - 201301, Site Address- GH-11A Sector-1, Greater NOIDA (West), UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP-4096/83

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion certificate filed

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered13 Feb 2018
Original completion4 Mar 2024
Revised completion3 Sept 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary17 Dec 2022
Registration fee₹1,05,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors880 · 7 · 25 (units from plan)
Homes · commercial units857 · 23 (shops and offices filed in the same plan)
  • 2 BHK523 59%
  • 3 BHK330 38%
  • SHOP23 3%
  • 1 BHK4 <1%
ConfigurationUnitsCarpet area
1 BHK449
2 BHK52355-78
SHOP2344-802
3 BHK33074-138
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 2 BHK, 3 BHK2514175-138
2 · 3 BHK, 2 BHK2514062-138
3 · 2 BHK, 3 BHK, 1 BHK2514449-122
4 · 1 BHK, 2 BHK, 3 BHK2514449-104
5 · 1 BHK, 2 BHK2414449-70
6 · 1 BHK, 2 BHK2414449-70
Commercial · SHOP12344-802
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
-
License -
-
Engineer
KAMAL SABHARWAL
H-25. 2ND FLOOR , LEVEL 3, KAILASH COLONY MARKET, DELHI
Sr.Development work declared to RERA
1Demarcation of Plots
YES
2Boundary Wall
YES
3Road Work
YES
4Footpaths
YES
5Water Supply Including Drinking Water Facilities
YES
6Sewer System
YES
7Drain
YES
8Parks
YES
9Tree Planting
YES
10Design For Electric Supply Including Street Lighting
YES
11Community Buildings
YES
12Treatment and Disposal System of Sewage and Sullage water
YES
13Solid Waste Management And Disposal System
YES
14Water Conservation System
YES
15Energy Management System Including Use of Renewable Energy
YES
16Fire Protection And Fire Safety System
YES
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
YES
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

10 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2INVESTOR HOMEZUPRERAAGT15046
3PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
4PROPSHOPUPRERAAGT10129
5REAL BRICKS INFRATECHUPRERAAGT13418
6REAL HOMEZUPRERAAGT11572
7RELIOBRIX CONSULTING PRIVATE LIMITEDUPRERAAGT10049
8SMC Real Estate Advisors Private LimitedUPRERAAGT10113
9SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
10WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 3 Jan 2023.

Sanctioned by Greater Noida Authority · 20,000 sqm of land · an approved plan of 7 blocks and 880 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP-4096/834 Jan 20183 Jan 20233 Jan 20284 Mar 2024
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 3 Sept 2024.

#Granted fromExtended uptoNote
14 Mar 20243 Sept 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-11A20000Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 18350
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Feb 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New7 May 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New7 May 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New7 May 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New13 Mar 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Mar 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Mar 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old16 Feb 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES PROPOSED
Fire safety (as filed with RERA)YES PROPOSED
Renewable energyYES PROPOSED

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameEnticement Infrastructure Private Limited
RolePromoter · current
RERA IDUPRERAPRM36549
PANAADCE2696L
CIN / TANU70100DL2012PTC237739
Name of chairmanKidar Nath Bansal
Registered addressRegistered Office Address- Shop No. 111, Vardhman Mayur Market, CSC Kondli Ghharoli, New Delhi - 110096, Corporate Office Address- A-57, Sector-4, NOIDA - 201301, Site Address- GH-11A Sector-1, Greater NOIDA (West), UP
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ENTICEMENT INFRASTRUCTURE PVT LTDBankAXIS BANKBranchGREATER NOIDAA/C no.IFSCUTIB0000624
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Filed document
viewprojects · 20
Water Supply Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 19
Sanctioned Layout Plan (Of Entire Project)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 18
Authentic copy of Approval of Project
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 17
ENGINEERS CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 16
ARCHITECT CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 15
CA CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 14
Affidavit (Form-B)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 13
Development Work Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 12
Electricity Supply Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 11
Water Supply Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 10
Waste Disposal Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 9
Proforma of Allotment Letter
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 8
Proforma of Application Form
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 7
Commencement Certificate
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 6
Details of Encumbrances
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 5
Other
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 4
Other
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 3
Proforma of Completion Certificate(Occupancy)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 2
Proforma of Conveyance Deed
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 1
Other Plan(If Any)
newly filed with RERA
18 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about CRC SUBLIMIS

Is CRC SUBLIMIS RERA registered?

Yes. CRC SUBLIMIS is registered with UPRERA under registration number UPRERAPRJ15180, registered on 13 Feb 2018. Estanzo reproduces that filing; it does not verify the work behind it.

Has CRC SUBLIMIS been completed?

UPRERA still lists CRC SUBLIMIS as Registered, so it is not shown as completed here. A completion certificate dated 17 Dec 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of CRC SUBLIMIS?

Enticement Infrastructure Private Limited is the promoter entity that filed CRC SUBLIMIS with UPRERA (promoter RERA ID UPRERAPRM36549). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted CRC SUBLIMIS more time to complete?

UPRERA's record carries 1 completion extension for CRC SUBLIMIS, the latest running to 3 Sept 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does CRC SUBLIMIS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CRC SUBLIMIS located?

CRC SUBLIMIS is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in CRC SUBLIMIS?

The unit plan filed with UPRERA lists 1 BHK, 2 BHK, SHOP and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CRC SUBLIMIS?

The approved unit plan filed with UPRERA runs from 44 to 802 m² of carpet area (about 473 to 8,635 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CRC SUBLIMIS?

The approved unit plan describes 7 blocks and 880 units of which 857 are homes and 23 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CRC SUBLIMIS?

About 178 units per acre: 880 planned units across 4.94 acres (20,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗