ATTALIKA

UPRERARegistered

ATTALIKA is a RERA-registered residential project by RAMPRASTHA REAL ESTATE PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ149247). Registered with a completion deadline of 31 Dec 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
27.5%Q3'25
30.77%Q4'25
34.46%Q1'26
40.29%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ149247
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Feb 2023
Project duration59 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressD-194, BASEMENT, GATE-1 (FRONT SIDE) OKHLA INDUSTRIAL AREA PHASE 1, NEW DELHI - 110020
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (2)

  2. 3 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered24 Feb 2023
Original completion31 Dec 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹87,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors349 · 4 · 30 (units from plan)
Homes · commercial units341 · 8 (shops and offices filed in the same plan)
  • 4 BHK228 65%
  • 3 BHK112 32%
  • SHOP8 2%
  • 2 BHK1 <1%
ConfigurationUnitsCarpet area
4 BHK228152-168
3 BHK112121
SHOP813
2 BHK1181
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A · 4 BHK29114152-168
TOWER B · 3 BHK28112121
TOWER C · 4 BHK29114152-168
TOWER D · SHOP, 2 BHK2913
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
RD DESIGN ATRIUM - ROHIT DABAS - RAHUL GUPTA
License CA/2016/76810, CA/2010/48921
D - 1, FIRST FLOOR, SECTOR - 7, NOIDA, U.P - 201301
Engineer
OPTIMUM DESIGN PVT. LTD.
B - 24, SECTOR - 67,NOIDA - 201301
Contractor
AYUSH CONSTRUCTIONS
FLAT NO.32, 3 FLOOR, T-1, G.C EMERALD HEIGHTS, RAMPRASTHA GREENS, VAISHALI, U.P
Sr.Development work declared to RERA
1Demarcation of Plots
EAST SIDE - 180.878, WEST SIDE - 184.248, NORTH SIDE - 91.321, SOUTH SIDE - 88.350
2Boundary Wall
RCC COLUMN AND BEAM STR. WITH BRICK WORK MS RAILING (150 MM RCC OR 230 MM BRICK WORK)
3Road Work
CEMENT CONCRETE/ CONCRETE PAVERS WITH AVERAGE THICKNESS OF 150MM
4Footpaths
CEMENT CONCRETE/ CONCRETE PAVERS WITH 60 - 80 MM THICKNESS
5Water Supply Including Drinking Water Facilities
UNDERGROUND AND OVERHEAD WATER TANKS ARE PROVIDED AND CONNECTION TO EACH AND EVERY TOILET AND KITCHEN
6Sewer System
WELL - LAID INTERCONNECTED SEWER LINES WILL BE PROVIDED WHICH ARE FURTHER CONNECTED TO THE SEWER LINE LAID BY THE GDA FURTHER TREATMENT IN THE STP LOCATED IN INDIRAPURAM
7Drain
DRAINAGE SYSTEM WILL BE PROVIDED ON THE BASIS OF COMPLIANCE OF NBC WITH CALCULATION OF DISCHARGE
8Parks
15 PERCENT GREEN AREA PROVIDED WITH OUTDOOR AMENITIES OF PLAY AREA
9Tree Planting
TREE PLANTATIONS WITH EVERGREEN AND SEASONAL CATEGORY
10Design For Electric Supply Including Street Lighting
ELECTRICAL SUPPLY SYSTEM WILL BE PROVIDED ACCORDING TO THE ELECTRICAL LOAD CALCULATION ON THE DATA PROVIDED BY THE MULTI METERING SYSTEM/ SINGLE POINT METERING SYSTEM WERE THE CONNECTION SHOULD BE PROVIDED BY THE PVVNL DIRECT TO THE FLAT OWNER AT THE TIME OF COMPLETION.
11Community Buildings
COMMUNITY HALL WITH INDOOR FACILITY AND RECREATIONAL ACTIVITY IS PROVIDED
12Treatment and Disposal System of Sewage and Sullage water
SEWAGE AND SULLAGE SHALL BE DISCHARGED TO THE STP PROVIDED BY GDA IN INDIRAPURAM
13Solid Waste Management And Disposal System
ORGANIC WASTE COMPOSER IS PROVIDED WITH DRY AND WET SEGREGATION MECHANISM
14Water Conservation System
RAIN WATER HARVESTING AND RECHARGE WELL BASED ON TOTAL SURFACE RUN AND FURTHER OVERFLOW IS TO BE CONNECTED TO THE RECHARGE WELL
15Energy Management System Including Use of Renewable Energy
PROVISION OF V.F.D (VARIABLE FREQUENCY DRIVE) IN PUMP ROOM FOR PUMPING THE DOMESTIC AND FLUSHING WATER TO MINIMIZE THE ENERGY REQUIREMENT.
16Fire Protection And Fire Safety System
FIRE FIGHTING SYSTEM AND PROTECTION SYSTEM WILL BE PROVIDED AS PER NBC AND NOC FROM UP FIRE SERVICE. INSTALLATION OF SPRINKLES SHALL BE DONE IN EACH FLATS
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
FIRE TENDER ROAD AND FIRE ESCAPE STAIRCASE WILL BE PROVIDED
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

3 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1DIVAKAR YADAVUPRERAAGT25843
2PRAVEEN ARYAUPRERAAGT13652
3SHAURYA REALTY LLPUPRERAAGT20350
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 2 Jan 2028. 2 of them carry a revalidation, the latest valid to 5 Oct 2028.

Sanctioned by Ghaziabad Development Authority · 16,396 sqm of land · an approved plan of 4 blocks and 349 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
GDA/BP/22-23/04263 Jan 20232 Jan 20281 Jan 203131 Dec 2027—
GDA/BP/22-23/04263 Jan 20232 Jan 20285 Oct 203031 Dec 20273 Jan 2023
valid to 5 Oct 2028
GDA/BP/22-23/04263 Jan 20232 Jan 20285 Oct 203031 Dec 20273 Jan 2023
valid to 5 Oct 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
197M1500Khasra
209M5270Khasra
210M328Khasra
211M400Khasra
212M2600Khasra
214M1958Khasra
215M4340Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 5181
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New25 Jan 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New19 Jan 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New18 Jan 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Jan 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New18 Jan 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New18 Jan 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New18 Jan 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New18 Jan 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New25 Jan 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New19 Jan 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New18 Jan 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Jan 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New18 Jan 2023 ↗

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2026-Q2.

QuarterConstructionCertificates
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q227.5%CA ↗ · Arch ↗ · Eng ↗
2025-Q330.77%CA ↗ · Arch ↗ · Eng ↗
2025-Q434.46%CA ↗ · Arch ↗ · Eng ↗
2026-Q140.29%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameRAMPRASTHA REAL ESTATE PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM212801
PANAAHCR0287J
CIN / TANU70102DL2014PTC268875
Name of chairmanPRADEEP YADAV
Registered addressD-194, BASEMENT, GATE-1 (FRONT SIDE) OKHLA INDUSTRIAL AREA PHASE 1, NEW DELHI - 110020
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameRAMPRASTHA BUILDERS PVT. LTD.
RoleCo-promoter · current
RERA IDUPRERAPRM10070
Applicant typeCompany
PANAAACR0118F
CIN / TANU74899DL1980PTC010399
Name of chairmanAnju Yadav
Registered addressB-23/25, KAILASH COLONY, NEW DELHI-110048
RERA contact
Registered since2017
Legal nameSURAT SINGH YADAV
RoleCo-promoter
Applicant typeIndividual
AddressB-23/25, Kailash Colony, New Delhi - 110048
RERA contact

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
RREPL MASTER COLLECTION A/C ATTALIKABankHDFC BANK LTDBranchVAISHALIBranch addressVAISHALI BRANCH VC - 1, SECTOR - 1,Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
RREPL SEPARATE A/C ATTALIKABankHDFC BANK LTDBranchVAISHALI GHAZIABADBranch addressVAISHALI, VC-1, SECTOR - 1, VAISHALIBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
RREPL TRANSACTION A/C ATTALIKABankHDFC BANK LTDBranchVAISHALI GHAZIABADBranch addressVC - 1, SECTOR - 1, VAISHALIBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about ATTALIKA

Is ATTALIKA RERA registered?

Yes. ATTALIKA is registered with UPRERA under registration number UPRERAPRJ149247, registered on 24 Feb 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ATTALIKA?

The completion date filed with UPRERA is 31 Dec 2027. No completion certificate is on record yet.

Who is the builder of ATTALIKA?

RAMPRASTHA REAL ESTATE PRIVATE LIMITED is the promoter entity that filed ATTALIKA with UPRERA (promoter RERA ID UPRERAPRM212801). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does ATTALIKA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ATTALIKA located?

ATTALIKA is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in ATTALIKA?

The unit plan filed with UPRERA lists 4 BHK, 3 BHK, SHOP and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in ATTALIKA?

The approved unit plan filed with UPRERA runs from 13 to 181 m² of carpet area (about 142 to 1,947 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in ATTALIKA?

The approved unit plan describes 4 blocks and 349 units of which 341 are homes and 8 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ATTALIKA?

About 86 units per acre: 349 planned units across 4.05 acres (16,396 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗