Miraabilis

UPRERARegistered

Miraabilis is a RERA-registered residential project by RHOMES MIRAABILIS LLP in Ramprastha Greens, Ghaziabad (RERA ID UPRERAPRJ630577). Registered with a completion deadline of 24 Oct 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
0%Q2'25
3.73%Q3'25
4.5%Q4'25
4.53%Q1'26
5.44%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ630577
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start4 Apr 2025
Project duration55 months
AddressKhasra No - 221M(Part), 222 M, 223M(Part), 224M(Part), 302M, 303M, 304(Part) & 307(Part) Village – Makanpur, District Ghaziabad (U.P.), Ramprastha Greens, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeLimited Liability Partnership (LLP)
Applicant address81, First Floor, Poorvi Marg, Vasant Vihar, New Delhi - 110057
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/07735/GDA/BP/24-25/0752/17092024

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered17 May 2025
Original completion24 Oct 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,25,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors292 · 4 · 39 (units from plan)
Homes · commercial units285 · 7 (shops and offices filed in the same plan)
  • 4 BHK276 95%
  • PENTHOUSE8 3%
  • SHOP7 2%
  • OTHER1 <1%
ConfigurationUnitsCarpet area
OTHER1104
4 BHK276241
PENTHOUSE8423
SHOP715-16
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A1 · OTHER, 4 BHK, PENTHOUSE3972241-423
A2 · OTHER, 4 BHK, PENTHOUSE3972241-423
A3 · OTHER, 4 BHK, PENTHOUSE3972241-423
A4 · SHOP, OTHER, 4 BHK, PENTHOUSE387615-423
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Vishal Sharma
License CA/98/23261
F1 First Floor Mira Corporate Suites, Ishwar Nagar, New Delhi-110065
Engineer
Dr. Vinod Jain
Vintech Consultants, C-35, Pamposh Enclave, Greater Kailash-I, New Delhi-110048
Contractor
RHOME KONSTRUKT PRIVATE LIMITED
81, First Floor, Poorvi Marg Vasant Vihar , New Delhi 110057
Sr.Development work declared to RERA
1Demarcation of Plots
Plot Size is 24081 sq. Meter, having entrance gate on 30M wide road and service Gate on 18M wide Road.
2Boundary Wall
Elegant design integrated with security rails and patterns as per approved building plan.
3Road Work
Fire Tender paths and other area Hard-escape as per Norms.
4Footpaths
Networks of footpaths connects the various parts in the landscape, towers and gardens as per approved building plans.
5Water Supply Including Drinking Water Facilities
Ghazibad Nagar Nigam shall provide water supply to the society and it shall be stored in underground tanks which shall be pumped to overhead water tanks and further supplied at customer premise through gravity.
6Sewer System
Sewer line with required slope and adequate catch basins and manholes and STP detailed plan/Single line plan enclosed.
7Drain
Adequate catch basins and manholes, Internal drain shall be constructed by promoters and shall be connected to Ghaziabad Nagar Nigam Sewer.
8Parks
15 percent green area provided with outdoor ameneties.
9Tree Planting
Tree planation with ever green and seasonal catogery, As per norms set by GDA
10Design For Electric Supply Including Street Lighting
Electrical supply will be provided according to electrical load calculation based on the electricity board
11Community Buildings
Community Hall, with guest room and other facilities will be provided
12Treatment and Disposal System of Sewage and Sullage water
Sewage and sullage shall be discharged to the STP provided by the GDA in Indirapuram.
13Solid Waste Management And Disposal System
Organic waste composter is provided with dry and wet segregation mechanism
14Water Conservation System
Rain water harvesting and recharge well based on total surface run off rain water quantity
15Energy Management System Including Use of Renewable Energy
Solar light system shall be developed as per norms of state government.
16Fire Protection And Fire Safety System
Fire sprinklers, Smoke detectors, FHC are provided provided as per NBC and NOC from UP Fire services.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire tender road and fire escape stair case is provided.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 25 Oct 2029.

Sanctioned by Ghaziabad Development Authority · 24,081 sqm of land · an approved plan of 4 blocks and 292 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/07735/GDA/BP/24-25/0752/1709202425 Oct 202425 Oct 202921 Apr 203224 Oct 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

29 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
221M510Khasra
222M840Khasra
223M3272Khasra
224M4829Khasra
302M3670Khasra
303M3540Khasra
304M2550Khasra
307M4870Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Regd_JDA_RHomes_RBPL_RegNo-3381 Book-1 Yr-2025
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · RBPL_Ownership_Docs
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Addendum_JDA_Rhomes_RBPL_RegNo-5410 Book-1 Yr-2025
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
General body resolution
The resolution authorising an apartment owners’ association to act as the registering entity.
not reported—
Affidavit on balance development work
The promoter’s sworn statement about the development work still to be finished.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New27 Mar 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New27 Mar 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Mar 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New27 Mar 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New27 Mar 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New27 Mar 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 Apr 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New27 Mar 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Mar 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New30 Mar 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Mar 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New17 Apr 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New27 Mar 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New27 Mar 2025 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.

QuarterConstructionCertificates
2025-Q10%CA ↗ · Arch ↗ · Eng ↗
2025-Q23.73%CA ↗ · Arch ↗ · Eng ↗
2025-Q34.5%CA ↗ · Arch ↗ · Eng ↗
2025-Q44.53%CA ↗ · Arch ↗ · Eng ↗
2026-Q15.44%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameRHOMES MIRAABILIS LLP
RolePromoter · current
RERA IDUPRERAPRM327187
PANABKFR0766M
CIN / TANDELR50476G
Registered address81, First Floor, Poorvi Marg, Vasant Vihar, New Delhi - 110057
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameRAMPRASTHA BUILDERS PVT. LTD.
RoleCo-promoter · current
RERA IDUPRERAPRM10070
Applicant typeCompany
PANAAACR0118F
CIN / TANU74899DL1980PTC010399
Name of chairmanAnju Yadav
Registered addressB-23/25, KAILASH COLONY, NEW DELHI-110048
RERA contact
Registered since2017

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Rhomes Miraabilis LLP Col A/c MiraabilisBankHDFC BANKBranchVaishaliBranch addressVC-1 Sector-1, Vaishali, Ghaziabad-201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422Branch emailSAMEEKSHA.PANDEY@HDFCBANK.COM
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Rhomes Miraabilis LLP Sep A/c MiraabilisBankHDFC BankBranchVaishaliBranch addressVC-1 Sector-1, Vaishali, Ghaziabad-201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Rhomes Miraabilis LLP Txn A/c MiraabilisBankHDFC BankBranchVaishaliBranch addressVC-1 Sector-1, Vaishali, Ghaziabad-201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000422
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Miraabilis

Is Miraabilis RERA registered?

Yes. Miraabilis is registered with UPRERA under registration number UPRERAPRJ630577, registered on 17 May 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Miraabilis?

The completion date filed with UPRERA is 24 Oct 2029. No completion certificate is on record yet.

Who is the builder of Miraabilis?

RHOMES MIRAABILIS LLP is the promoter entity that filed Miraabilis with UPRERA (promoter RERA ID UPRERAPRM327187). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Miraabilis have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Miraabilis located?

Miraabilis is registered in Ramprastha Greens, Ghaziabad, as filed with UPRERA.

What configurations are available in Miraabilis?

The unit plan filed with UPRERA lists OTHER, 4 BHK, PENTHOUSE and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Miraabilis?

The approved unit plan filed with UPRERA runs from 15 to 423 m² of carpet area (about 164 to 4,549 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Miraabilis?

The approved unit plan describes 4 blocks and 292 units of which 285 are homes and 7 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Miraabilis?

About 49 units per acre: 292 planned units across 5.95 acres (24,081 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗