Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3783
Project categoryResidential
Registration typeOngoing
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start15 Sept 2010
Original start15 Sept 2010
Project duration118 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant addressOMNI FARMS PRIVATE LIMITED. SECOND FLOOR ELDECO CORPORATE CHAMBER ( OPP MANDI PARISHAD ) VIBHUTI KHAND GOMTI NAGAR LUCKNOW-226010
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    994

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2017
Original completion10 Jul 2020
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary9 Oct 2020
Registration fee₹1,73,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors687 · 8 · 15 (units from plan)
Homes · commercial units667 · 20 (shops and offices filed in the same plan)
  • 3 BHK294 43%
  • 2 BHK278 40%
  • 4 BHK76 11%
  • SHOP20 3%
  • 1 BHK14 2%
  • PENTHOUSE5 1%
ConfigurationUnitsCarpet area
2 BHK27858-92
3 BHK29480-112
4 BHK76101-120
PENTHOUSE5181-200
1 BHK1436
SHOP2020-22
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
SAUBHAGYAM ARCADE · OTHER, SHOP32020-22
SAUBHAGYAM-T10 · OTHER, 1 BHK, 2 BHK, 3 BHK, 4 BHK1514036-103
SAUBHAGYAM-T11 · OTHER, 2 BHK, 3 BHK, 4 BHK1512659-120
SAUBHAGYAM-T2 · OTHER, 2 BHK, 3 BHK, 4 BHK158465-101
SAUBHAGYAM-T6 · OTHER, 2 BHK, 3 BHK158467-87
SAUBHAGYAM-T7 · OTHER, 2 BHK, 3 BHK158470-112
SAUBHAGYAM-T9 · OTHER, 2 BHK, PENTHOUSE, 3 BHK146592-200
SAUBHAGYAM-TI · OTHER, 2 BHK, 3 BHK158466-88
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ESpaces
License CA/89/12382
108, FF, Corporate Chamber- I, Vibhuti Khand, Lucknow
Engineer
Space Combine
AI/112, Safdarjung Enclave, New Delhi
Contractor
Prabha Enterprises
182-C, Udyan 1, Bangla Bazaar, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
DEMARCATED AT LOCATION
2Boundary Wall
CONSTRUCTED
3Road Work
24/18 MT. APPROACH ROADS AVAILABLE. 6M. INTERNAL ROAD CONSTRUCTED AS PER APPROVED LAYOUT.
4Footpaths
1.2 - 1.5M. WIDE PAVING ALONG INTERNAL ROAD.
5Water Supply Including Drinking Water Facilities
UNDERGROUND WATER THROUGH TERRACE TANKS/ U.G. TANK.
6Sewer System
MAIN SEWER AVAILABLE CONNECTED TO TOWNSHIP (VRINDAVAN YOJANA- HOUSING BOARD) SEWER
7Drain
K.C./ U-DRAINS PROPOSED CONNECTED TO TOWNSHIP (VRINDAVAN YOJANA- HOUSING BOARD) DRAINAGE
8Parks
GREEN AREAS AS PER APPROVED LAYOUT
9Tree Planting
SHRUBS, GRASS & TREES UPTO 6M. HIGH
10Design For Electric Supply Including Street Lighting
SUPPLY FROM NEAR BY SUB-STATION AVAILABLE. EFFICIENT STREET LIGHTING
11Community Buildings
CLUB CONSTRUCTED WITH SWIMMING POOL
12Treatment and Disposal System of Sewage and Sullage water
TOWNSHIP (VRINDAVAN YOJANA- HOUSING BOARD) S.T.P. AVAILABLE
13Solid Waste Management And Disposal System
NAGAR NIGAM, LUCKNOW
14Water Conservation System
RAIN WATER HARVESTING PROVISIONS AT SITE.
15Energy Management System Including Use of Renewable Energy
20% OF STREET LIGHT TO HAVE SOLAR ENERGY BACK-UP
16Fire Protection And Fire Safety System
WORK DONE AS PER FIRE N.O.C. DRAWING
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
FIRE ESCAPE IN EACH BLOCK.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

37 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2AMIT AGARWALUPRERAAGT11945
3ANIL KUMAR VERMAUPRERAAGT14346
4ARTI TIWARIUPRERAAGT14234
5ASA FINCAP ADVISORS LLPUPRERAAGT10926
6BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
7bhupendra kumar singhUPRERAAGT11056
8BIPIN CHANDRA PANTUPRERAAGT13687
9Brijendra SinghUPRERAAGT10496
10DAIWIK REALTORSUPRERAAGT12075
11DEVENDRA VERMAUPRERAAGT14290
12GOLDEN STAR REAL ESTATESUPRERAAGT10303
13INDIABULLS INVESTMENT ADVISORS LIMITEDUPRERAAGT10238
14INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
15INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
16KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
17Mr. Janardan AgarwalUPRERAAGT10555
18OPAL PROPERTY SOLUTIONS PRIVATE LIMITEDUPRERAAGT13636
19Prem Prakash KhareUPRERAAGT13677
20Rajni DawraUPRERAAGT13519
21REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
22REETA MAURYA C/O SHIVA ASSOCIATEUPRERAAGT13650
23RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
24SANJEEV KUMAR BANKAUPRERAAGT10894
25SDR INFRA BUILD PVT LTDUPRERAAGT11062
26SHAH MOHSIN KAMALUPRERAAGT14208
27SHREE SAI ASSOCIATESUPRERAAGT11846
28SHREE SHRADDHA PROPERTIESUPRERAAGT10301
29SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
30Smart InfraReality Private LimitedUPRERAAGT10057
31SMC Real Estate Advisors Private LimitedUPRERAAGT10113
32SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
33Vajrakaya Buildwell Private LimitedUPRERAAGT12913
34VANDANA AGARWALUPRERAAGT13353
35Varun Properties Inc.UPRERAAGT11985
36VIMLESH PRATAP SINGHUPRERAAGT11674
37VISHESH SRIVASTAVAUPRERAAGT11416
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 12 Jul 2016.

Sanctioned by U.P. Awas Evam Vikas Parishad · 33,637 sqm of land · an approved plan of 8 blocks and 687 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
99418 Apr 201612 Jul 201611 Jul 201910 Jul 2020
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
9D/GH-144609.1—
9D/GH-144609.67Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 2 Apr 2016.

Registry no.DateTypeArea
61622 Apr 2016self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 6162
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New27 Feb 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Feb 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New4 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New4 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New4 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New10 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New10 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old28 Jul 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old28 Jul 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old28 Jul 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old28 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old28 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Fire Fighting Equipment and Fire Alarm System
Health serviceSewer, Drainage, Water Supply
Renewable energyRain Water Harvesting
Other facilitiesClub, Pool,power back up, CCTV

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOmni Farms Pvt Ltd
RolePromoter · current
RERA IDUPRERAPRM2928
PANAAACO5916C
CIN / TANU74899DL1989PTC035079
Name of chairmanMR.IJHARUL HAQ SIDDIUI
Registered addressOMNI FARMS PRIVATE LIMITED. SECOND FLOOR ELDECO CORPORATE CHAMBER ( OPP MANDI PARISHAD ) VIBHUTI KHAND GOMTI NAGAR LUCKNOW-226010
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameELDECO Housing and Industries Ltd.
RoleCo-promoter · current
RERA IDUPRERAPRM21
Applicant typeCompany
PANAAACE4554G
CIN / TANL45202UP1985PLC099376
Name of chairmanMr Pankaj Bajaj
Registered addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
RERA contact
Registered since2017

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
OMNI FARMS PVT LTDBankPunjab National BankBranchVibhuti Khand BranchA/C no.IFSCPUNB0619300
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Saubhagyam

Is Saubhagyam RERA registered?

Yes. Saubhagyam is registered with UPRERA under registration number UPRERAPRJ3783, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Saubhagyam been completed?

UPRERA lists Saubhagyam as completed, with a completion certificate dated 9 Oct 2020, against a filed deadline of 10 Jul 2020.

Who is the builder of Saubhagyam?

Omni Farms Pvt Ltd is the promoter entity that filed Saubhagyam with UPRERA (promoter RERA ID UPRERAPRM2928). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Saubhagyam have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Saubhagyam located?

Saubhagyam is registered in Lucknow, as filed with UPRERA.

What configurations are available in Saubhagyam?

The unit plan filed with UPRERA lists OTHER, 2 BHK, 3 BHK, 4 BHK, PENTHOUSE, 1 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Saubhagyam?

The approved unit plan filed with UPRERA runs from 20 to 200 m² of carpet area (about 217 to 2,155 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Saubhagyam?

The approved unit plan describes 8 blocks and 687 units of which 667 are homes and 20 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Saubhagyam?

About 83 units per acre: 687 planned units across 8.31 acres (33,637 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.