Saubhagyam is a RERA-registered residential project by Omni Farms Pvt Ltd in Lucknow (RERA ID UPRERAPRJ3783). RERA status: Completed on 9 Oct 2020.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ3783 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 15 Sept 2010 |
| Original start | 15 Sept 2010 |
| Project duration | 118 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | OMNI FARMS PRIVATE LIMITED. SECOND FLOOR ELDECO CORPORATE CHAMBER ( OPP MANDI PARISHAD ) VIBHUTI KHAND GOMTI NAGAR LUCKNOW-226010 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
994
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Jul 2017 |
| Original completion | 10 Jul 2020 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 9 Oct 2020 |
| Registration fee | ₹1,73,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK294 43%
- 2 BHK278 40%
- 4 BHK76 11%
- SHOP20 3%
- 1 BHK14 2%
- PENTHOUSE5 1%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 278 | 58-92 |
| 3 BHK | 294 | 80-112 |
| 4 BHK | 76 | 101-120 |
| PENTHOUSE | 5 | 181-200 |
| 1 BHK | 14 | 36 |
| SHOP | 20 | 20-22 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| SAUBHAGYAM ARCADE · OTHER, SHOP | 3 | 20 | 20-22 |
| SAUBHAGYAM-T10 · OTHER, 1 BHK, 2 BHK, 3 BHK, 4 BHK | 15 | 140 | 36-103 |
| SAUBHAGYAM-T11 · OTHER, 2 BHK, 3 BHK, 4 BHK | 15 | 126 | 59-120 |
| SAUBHAGYAM-T2 · OTHER, 2 BHK, 3 BHK, 4 BHK | 15 | 84 | 65-101 |
| SAUBHAGYAM-T6 · OTHER, 2 BHK, 3 BHK | 15 | 84 | 67-87 |
| SAUBHAGYAM-T7 · OTHER, 2 BHK, 3 BHK | 15 | 84 | 70-112 |
| SAUBHAGYAM-T9 · OTHER, 2 BHK, PENTHOUSE, 3 BHK | 14 | 65 | 92-200 |
| SAUBHAGYAM-TI · OTHER, 2 BHK, 3 BHK | 15 | 84 | 66-88 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots DEMARCATED AT LOCATION |
| 2 | Boundary Wall CONSTRUCTED |
| 3 | Road Work 24/18 MT. APPROACH ROADS AVAILABLE. 6M. INTERNAL ROAD CONSTRUCTED AS PER APPROVED LAYOUT. |
| 4 | Footpaths 1.2 - 1.5M. WIDE PAVING ALONG INTERNAL ROAD. |
| 5 | Water Supply Including Drinking Water Facilities UNDERGROUND WATER THROUGH TERRACE TANKS/ U.G. TANK. |
| 6 | Sewer System MAIN SEWER AVAILABLE CONNECTED TO TOWNSHIP (VRINDAVAN YOJANA- HOUSING BOARD) SEWER |
| 7 | Drain K.C./ U-DRAINS PROPOSED CONNECTED TO TOWNSHIP (VRINDAVAN YOJANA- HOUSING BOARD) DRAINAGE |
| 8 | Parks GREEN AREAS AS PER APPROVED LAYOUT |
| 9 | Tree Planting SHRUBS, GRASS & TREES UPTO 6M. HIGH |
| 10 | Design For Electric Supply Including Street Lighting SUPPLY FROM NEAR BY SUB-STATION AVAILABLE. EFFICIENT STREET LIGHTING |
| 11 | Community Buildings CLUB CONSTRUCTED WITH SWIMMING POOL |
| 12 | Treatment and Disposal System of Sewage and Sullage water TOWNSHIP (VRINDAVAN YOJANA- HOUSING BOARD) S.T.P. AVAILABLE |
| 13 | Solid Waste Management And Disposal System NAGAR NIGAM, LUCKNOW |
| 14 | Water Conservation System RAIN WATER HARVESTING PROVISIONS AT SITE. |
| 15 | Energy Management System Including Use of Renewable Energy 20% OF STREET LIGHT TO HAVE SOLAR ENERGY BACK-UP |
| 16 | Fire Protection And Fire Safety System WORK DONE AS PER FIRE N.O.C. DRAWING |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services FIRE ESCAPE IN EACH BLOCK. |
| 19 | Other Miscellaneous Work NA |
Registered agents
37 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | AMIT AGARWAL | UPRERAAGT11945 |
| 3 | ANIL KUMAR VERMA | UPRERAAGT14346 |
| 4 | ARTI TIWARI | UPRERAAGT14234 |
| 5 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 6 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 7 | bhupendra kumar singh | UPRERAAGT11056 |
| 8 | BIPIN CHANDRA PANT | UPRERAAGT13687 |
| 9 | Brijendra Singh | UPRERAAGT10496 |
| 10 | DAIWIK REALTORS | UPRERAAGT12075 |
| 11 | DEVENDRA VERMA | UPRERAAGT14290 |
| 12 | GOLDEN STAR REAL ESTATES | UPRERAAGT10303 |
| 13 | INDIABULLS INVESTMENT ADVISORS LIMITED | UPRERAAGT10238 |
| 14 | INVESTORS CARE INFRATECH PVT LTD | UPRERAAGT13542 |
| 15 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 16 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 17 | Mr. Janardan Agarwal | UPRERAAGT10555 |
| 18 | OPAL PROPERTY SOLUTIONS PRIVATE LIMITED | UPRERAAGT13636 |
| 19 | Prem Prakash Khare | UPRERAAGT13677 |
| 20 | Rajni Dawra | UPRERAAGT13519 |
| 21 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 22 | REETA MAURYA C/O SHIVA ASSOCIATE | UPRERAAGT13650 |
| 23 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 24 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 25 | SDR INFRA BUILD PVT LTD | UPRERAAGT11062 |
| 26 | SHAH MOHSIN KAMAL | UPRERAAGT14208 |
| 27 | SHREE SAI ASSOCIATES | UPRERAAGT11846 |
| 28 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 29 | SILVER EDGE REAL ESTATE SOLUTION | UPRERAAGT12168 |
| 30 | Smart InfraReality Private Limited | UPRERAAGT10057 |
| 31 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 32 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 33 | Vajrakaya Buildwell Private Limited | UPRERAAGT12913 |
| 34 | VANDANA AGARWAL | UPRERAAGT13353 |
| 35 | Varun Properties Inc. | UPRERAAGT11985 |
| 36 | VIMLESH PRATAP SINGH | UPRERAAGT11674 |
| 37 | VISHESH SRIVASTAVA | UPRERAAGT11416 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 12 Jul 2016.
Sanctioned by U.P. Awas Evam Vikas Parishad · 33,637 sqm of land · an approved plan of 8 blocks and 687 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 994 | 18 Apr 2016 | 12 Jul 2016 | 11 Jul 2019 | 10 Jul 2020 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 9D/GH-1 | 44609.1 | — |
| 9D/GH-1 | 44609.67 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 2 Apr 2016.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 6162 | 2 Apr 2016 | self | — |
| Sale deed · 6162 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 27 Feb 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 31 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 27 Feb 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Jul 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 4 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 10 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 28 Jul 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 28 Jul 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 28 Jul 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 28 Jul 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 28 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Yes |
| Fire safety (as filed with RERA) | Fire Fighting Equipment and Fire Alarm System |
| Health service | Sewer, Drainage, Water Supply |
| Renewable energy | Rain Water Harvesting |
| Other facilities | Club, Pool,power back up, CCTV |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Omni Farms Pvt Ltd |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2928 |
| PAN | AAACO5916C |
| CIN / TAN | U74899DL1989PTC035079 |
| Name of chairman | MR.IJHARUL HAQ SIDDIUI |
| Registered address | OMNI FARMS PRIVATE LIMITED. SECOND FLOOR ELDECO CORPORATE CHAMBER ( OPP MANDI PARISHAD ) VIBHUTI KHAND GOMTI NAGAR LUCKNOW-226010 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | ELDECO Housing and Industries Ltd. |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM21 |
| Applicant type | Company |
| PAN | AAACE4554G |
| CIN / TAN | L45202UP1985PLC099376 |
| Name of chairman | Mr Pankaj Bajaj |
| Registered address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | OMNI FARMS PVT LTDBankPunjab National BankBranchVibhuti Khand BranchA/C no.IFSCPUNB0619300 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about Saubhagyam
Is Saubhagyam RERA registered?
Yes. Saubhagyam is registered with UPRERA under registration number UPRERAPRJ3783, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Saubhagyam been completed?
UPRERA lists Saubhagyam as completed, with a completion certificate dated 9 Oct 2020, against a filed deadline of 10 Jul 2020.
Who is the builder of Saubhagyam?
Omni Farms Pvt Ltd is the promoter entity that filed Saubhagyam with UPRERA (promoter RERA ID UPRERAPRM2928). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Saubhagyam have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Saubhagyam located?
Saubhagyam is registered in Lucknow, as filed with UPRERA.
What configurations are available in Saubhagyam?
The unit plan filed with UPRERA lists OTHER, 2 BHK, 3 BHK, 4 BHK, PENTHOUSE, 1 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Saubhagyam?
The approved unit plan filed with UPRERA runs from 20 to 200 m² of carpet area (about 217 to 2,155 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Saubhagyam?
The approved unit plan describes 8 blocks and 687 units of which 667 are homes and 20 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Saubhagyam?
About 83 units per acre: 687 planned units across 8.31 acres (33,637 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗