BHS-16 MU-II

UPRERARegistered

BHS-16 MU-II is a RERA-registered residential project by GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY in Gautam Budh Nagar (RERA ID UPRERAPRJ9651). Registered with a completion deadline of 30 Jun 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9651
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start21 Nov 2013
Original start18 Sept 2013
Project duration56 months
AddressDadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompetent authority
Applicant addressPLOT NO-01, KNOWLEDGE PARK-04, GREATER NOIDA, G.B. NAGAR UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    PLG/(BP) 3709/GH/5138

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion30 Jun 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary27 Jun 2023
Registration fee₹10,46,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors5,266 · 350 · 4 (units from plan)
ConfigurationUnitsCarpet area
1 BHK5,26622
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 1 BHK41522
2 · 1 BHK41522
3 · 1 BHK41522
4 · 1 BHK41522
5 · 1 BHK41522
6 · 1 BHK41522
7 · 1 BHK41522
8 · 1 BHK41522
9 · 1 BHK41522
10 · 1 BHK41522
11 · 1 BHK41522
12 · 1 BHK41522
13 · 1 BHK41522
14 · 1 BHK41522
15 · 1 BHK41522
16 · 1 BHK41522
17 · 1 BHK41522
18 · 1 BHK41522
19 · 1 BHK41522
20 · 1 BHK41522
21 · 1 BHK41522
22 · 1 BHK41522
23 · 1 BHK41522
24 · 1 BHK41522
25 · 1 BHK41522
26 · 1 BHK41522
27 · 1 BHK41522
28 · 1 BHK41522
29 · 1 BHK41522
30 · 1 BHK41522
31 · 1 BHK41522
32 · 1 BHK41522
33 · 1 BHK41522
34 · 1 BHK41522
35 · 1 BHK41522
36 · 1 BHK41522
37 · 1 BHK41522
38 · 1 BHK41522
39 · 1 BHK41522
40 · 1 BHK41522
41 · 1 BHK41522
42 · 1 BHK41622
43 · 1 BHK41522
44 · 1 BHK41522
45 · 1 BHK41522
46 · 1 BHK41522
47 · 1 BHK41522
48 · 1 BHK41522
49 · 1 BHK41522
50 · 1 BHK41522
51 · 1 BHK41522
52 · 1 BHK41522
53 · 1 BHK41522
54 · 1 BHK41522
55 · 1 BHK41522
56 · 1 BHK41522
57 · 1 BHK41522
58 · 1 BHK41522
59 · 1 BHK41522
60 · 1 BHK41522
61 · 1 BHK41522
62 · 1 BHK41522
63 · 1 BHK41522
64 · 1 BHK41522
65 · 1 BHK41522
66 · 1 BHK41522
67 · 1 BHK41522
68 · 1 BHK41522
69 · 1 BHK41522
70 · 1 BHK41522
71 · 1 BHK41522
72 · 1 BHK41522
73 · 1 BHK41522
74 · 1 BHK41522
75 · 1 BHK41522
76 · 1 BHK41522
77 · 1 BHK41522
78 · 1 BHK41522
79 · 1 BHK41522
80 · 1 BHK41522
81 · 1 BHK41522
82 · 1 BHK41522
83 · 1 BHK41522
84 · 1 BHK41522
85 · 1 BHK41522
86 · 1 BHK41522
87 · 1 BHK41522
88 · 1 BHK41522
89 · 1 BHK41522
90 · 1 BHK41522
91 · 1 BHK41522
92 · 1 BHK41522
93 · 1 BHK41522
94 · 1 BHK41522
95 · 1 BHK41522
96 · 1 BHK41522
97 · 1 BHK41522
98 · 1 BHK41522
99 · 1 BHK41522
100 · 1 BHK41522
101 · 1 BHK41522
102 · 1 BHK41522
103 · 1 BHK41522
104 · 1 BHK41522
105 · 1 BHK41522
106 · 1 BHK41522
107 · 1 BHK41522
108 · 1 BHK41522
109 · 1 BHK41522
110 · 1 BHK41522
111 · 1 BHK41522
112 · 1 BHK41522
113 · 1 BHK41522
114 · 1 BHK41522
115 · 1 BHK41522
116 · 1 BHK41522
117 · 1 BHK41522
118 · 1 BHK41522
119 · 1 BHK41522
120 · 1 BHK41522
121 · 1 BHK41522
122 · 1 BHK41522
123 · 1 BHK41522
124 · 1 BHK41522
125 · 1 BHK41522
126 · 1 BHK41522
127 · 1 BHK41522
128 · 1 BHK41522
129 · 1 BHK41522
130 · 1 BHK41522
131 · 1 BHK41522
132 · 1 BHK41522
133 · 1 BHK41522
134 · 1 BHK41522
135 · 1 BHK41522
136 · 1 BHK41522
137 · 1 BHK41522
138 · 1 BHK41522
139 · 1 BHK41522
140 · 1 BHK41522
141 · 1 BHK41522
142 · 1 BHK41522
143 · 1 BHK41522
144 · 1 BHK41522
145 · 1 BHK41522
146 · 1 BHK41522
147 · 1 BHK41522
148 · 1 BHK41522
149 · 1 BHK41522
150 · 1 BHK41522
151 · 1 BHK41522
152 · 1 BHK41522
153 · 1 BHK41522
154 · 1 BHK41522
155 · 1 BHK41522
156 · 1 BHK41522
157 · 1 BHK41522
158 · 1 BHK41522
159 · 1 BHK41522
160 · 1 BHK41522
161 · 1 BHK41522
162 · 1 BHK41522
163 · 1 BHK41522
164 · 1 BHK41522
165 · 1 BHK41522
166 · 1 BHK41522
167 · 1 BHK41522
168 · 1 BHK41522
169 · 1 BHK41522
170 · 1 BHK41522
171 · 1 BHK41522
172 · 1 BHK41522
173 · 1 BHK41522
174 · 1 BHK41522
175 · 1 BHK41522
176 · 1 BHK41522
177 · 1 BHK41522
178 · 1 BHK41522
179 · 1 BHK41522
180 · 1 BHK41522
181 · 1 BHK41522
182 · 1 BHK41522
183 · 1 BHK41522
184 · 1 BHK41522
185 · 1 BHK41522
186 · 1 BHK41522
187 · 1 BHK41522
188 · 1 BHK41522
189 · 1 BHK41522
190 · 1 BHK41522
191 · 1 BHK41522
192 · 1 BHK41522
193 · 1 BHK41522
194 · 1 BHK41522
195 · 1 BHK41522
196 · 1 BHK41522
197 · 1 BHK41522
198 · 1 BHK41522
199 · 1 BHK41522
200 · 1 BHK41522
201 · 1 BHK41522
202 · 1 BHK41522
203 · 1 BHK41522
204 · 1 BHK41522
205 · 1 BHK41522
206 · 1 BHK41522
207 · 1 BHK41522
208 · 1 BHK41522
209 · 1 BHK41522
210 · 1 BHK41522
211 · 1 BHK41522
212 · 1 BHK41522
213 · 1 BHK41522
214 · 1 BHK41522
215 · 1 BHK41522
216 · 1 BHK41522
217 · 1 BHK41522
218 · 1 BHK41522
219 · 1 BHK41522
220 · 1 BHK41522
221 · 1 BHK41522
222 · 1 BHK41522
223 · 1 BHK41522
224 · 1 BHK41522
225 · 1 BHK41622
226 · 1 BHK41522
227 · 1 BHK41522
228 · 1 BHK41522
229 · 1 BHK41522
230 · 1 BHK41522
231 · 1 BHK41522
232 · 1 BHK41522
233 · 1 BHK41522
234 · 1 BHK41522
235 · 1 BHK41522
236 · 1 BHK41522
237 · 1 BHK41522
238 · 1 BHK41522
239 · 1 BHK41522
240 · 1 BHK41522
241 · 1 BHK41522
242 · 1 BHK41522
243 · 1 BHK41522
244 · 1 BHK41522
245 · 1 BHK41522
246 · 1 BHK41522
247 · 1 BHK41522
248 · 1 BHK41522
249 · 1 BHK41522
250 · 1 BHK41522
251 · 1 BHK41522
252 · 1 BHK41522
253 · 1 BHK41522
254 · 1 BHK41522
255 · 1 BHK41522
256 · 1 BHK41522
257 · 1 BHK41522
258 · 1 BHK41522
259 · 1 BHK41522
260 · 1 BHK41522
261 · 1 BHK41522
262 · 1 BHK41522
263 · 1 BHK41522
264 · 1 BHK41522
265 · 1 BHK41522
266 · 1 BHK41522
267 · 1 BHK41522
268 · 1 BHK41522
269 · 1 BHK41522
270 · 1 BHK41522
271 · 1 BHK41522
272 · 1 BHK41522
273 · 1 BHK41522
274 · 1 BHK41522
275 · 1 BHK41522
276 · 1 BHK41522
277 · 1 BHK41522
278 · 1 BHK41522
279 · 1 BHK41522
280 · 1 BHK41922
281 · 1 BHK41522
282 · 1 BHK41522
283 · 1 BHK41922
284 · 1 BHK41522
285 · 1 BHK41522
286 · 1 BHK41522
287 · 1 BHK41522
288 · 1 BHK41522
289 · 1 BHK41522
290 · 1 BHK41522
291 · 1 BHK41522
292 · 1 BHK41822
293 · 1 BHK41522
294 · 1 BHK41522
295 · 1 BHK41522
296 · 1 BHK41522
297 · 1 BHK41522
298 · 1 BHK41522
299 · 1 BHK41522
300 · 1 BHK41522
301 · 1 BHK41522
302 · 1 BHK41522
303 · 1 BHK41522
304 · 1 BHK41522
305 · 1 BHK41822
306 · 1 BHK41522
307 · 1 BHK41522
308 · 1 BHK41522
309 · 1 BHK41522
310 · 1 BHK41522
311 · 1 BHK41522
312 · 1 BHK41522
313 · 1 BHK41522
314 · 1 BHK41522
315 · 1 BHK41522
316 · 1 BHK41522
317 · 1 BHK41522
318 · 1 BHK41522
319 · 1 BHK41522
320 · 1 BHK41522
321 · 1 BHK41522
322 · 1 BHK41522
323 · 1 BHK41522
324 · 1 BHK41522
325 · 1 BHK41522
326 · 1 BHK41522
327 · 1 BHK41522
328 · 1 BHK41522
329 · 1 BHK41522
330 · 1 BHK41522
331 · 1 BHK41522
332 · 1 BHK41522
333 · 1 BHK41522
334 · 1 BHK41522
335 · 1 BHK41522
336 · 1 BHK41522
337 · 1 BHK41522
338 · 1 BHK41522
339 · 1 BHK41522
340 · 1 BHK41522
341 · 1 BHK41522
342 · 1 BHK41522
343 · 1 BHK41522
344 · 1 BHK41522
345 · 1 BHK41522
346 · 1 BHK41522
347 · 1 BHK41522
348 · 1 BHK41522
349 · 1 BHK41522
350 · 1 BHK41522
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ASHOK KUMAR
License CA/84/8075
B-1/37, HAUZ KHAS, NEW DELHI
Engineer
OMKAR VERMA
8/14, INDIRA NAGAR, LUCKNOW (U.P)
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
Brick Work Boundary Wall Having RCC plith Beam and RCC Columns ,washed grit Finish,
3Road Work
6.00mtr Wide internal Road and 16.00 mtr wide front side roads,& others 18.00 mtr, 12.00 mtr,9.00 mtr wide WBM Road with 25mm SDBC.
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
Connection from GNIDA water Supply, Water Treatment Plant
6Sewer System
RCC pipe lines provided for sewerage.
7Drain
RCC Drain with SFRC Drain Covers
8Parks
22745.00sqm
9Tree Planting
7745Nos
10Design For Electric Supply Including Street Lighting
33/0.433 kv & 11 kv transformer, including LED & solar lighting
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Disposal in GNIDA sewer line.
13Solid Waste Management And Disposal System
Solid Waste will be Collected and Disposed By Hired Agency of GNIDA.
14Water Conservation System
Water Harvesting systems are provided for water Conservation
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
As per fire noc noms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Schools(sr.secondry & nurseru),community center,milk booth,police chowky,kiosk
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
ESS, & UGR
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 9 Aug 2022.

Sanctioned by Greater Noida Authority · 2,08,285 sqm of land · an approved plan of 350 blocks and 5266 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/(BP) 3709/GH/513810 Aug 20179 Aug 20229 Aug 202230 Jun 2018
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗

Land & documents

213 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
3181878—
319200—
320170—
3553435—
356435—
357850—
3581620—
3593452—
351960—
360136—
361100—
362942—
363879—
365885—
366138—
367176—
3683736—
369250—
373651—
3743000—
375512—
3778643—
3783541—
7696200—
81463—
770164—
771176—
772170—
773170—
774170—
775170—
776176—
7775931—
7785374—
7793490—
7651033.50—
766205—
767205—
7684020—
7802410—
782330—
794200—
795200—
7936040—
7923483—
791250—
78980—
790200—
7871070—
7883181—
7961100—
797600—
7985336—
7997030—
800195—
8011590—
8024912—
8032466—
803/16962400—
8074600—
808300—
8091700—
8103500—
8134034—
8125589—
8171800—
8187499—
819200—
8212600—
1023733—
1024689—
1025689—
10261660—
10273060—
10282358—
10294363—
1030200—
10312600—
10331930—
10346728—
10483876—
10473870—
10462560—
10454104—
1071600—
10608850—
10595000—
105795—
1058189—
10566001—
10513060—
10522377—
10551560—
10531040—
364891—
3181878Khasra
319200Khasra
320170Khasra
3553435Khasra
356435Khasra
357850Khasra
3581620Khasra
3593452Khasra
351960Khasra
360136Khasra
361100Khasra
362942Khasra
363879Khasra
364891Khasra
365885Khasra
366138Khasra
367167Khasra
3683736Khasra
369250Khasra
373651Khasra
3743000Khasra
375512Khasra
3778643Khasra
3783541Khasra
7696200Khasra
81463Khasra
770164Khasra
771176Khasra
772170Khasra
773170Khasra
774170Khasra
775170Khasra
776176Khasra
7775931Khasra
7785374Khasra
7793490Khasra
7751033.5Khasra
776205Khasra
767205Khasra
7684020Khasra
7804010Khasra
782330Khasra
794200Khasra
795200Khasra
7936040Khasra
7923483Khasra
791250Khasra
78980Khasra
790200Khasra
7871070Khasra
7883181Khasra
7961100Khasra
797600Khasra
7985336Khasra
7997030Khasra
800195Khasra
8011590Khasra
8024912Khasra
8032466Khasra
803/16962400Khasra
8074600Khasra
808300Khasra
8091700Khasra
8103500Khasra
8134034Khasra
8125589Khasra
8171800Khasra
8187499Khasra
819200Khasra
8212600Khasra
1023733Khasra
1024689Khasra
1025689Khasra
10261660Khasra
1027360Khasra
10282358Khasra
10294363Khasra
1030200Khasra
10312600Khasra
10331930Khasra
10346728Khasra
10483876Khasra
10473870Khasra
10462560Khasra
10454104Khasra
1071600Khasra
10608850Khasra
10595000Khasra
105795Khasra
1058189Khasra
10566001Khasra
10513060Khasra
10522377Khasra
10551560Khasra
10531040Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 1 Aug 2017.

Registry no.DateTypeArea
NA1 Aug 2017self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New27 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New27 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New27 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New27 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New27 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New27 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New28 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old11 Aug 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old11 Aug 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old11 Aug 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old11 Aug 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old11 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old11 Aug 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old11 Aug 2017 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
Old11 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old11 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old11 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceOPERATIONAL HOSPITAL APPROX 5 KM AHEAD
Renewable energyNO
Other facilitiesSCHOOL(SR SEC & NURSERY), COMMUNITY CENTER, MILK BOOTH, PLOCE CHOWKI, DAY CARE CENTER, KIOSK

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY
RolePromoter · current
RERA IDUPRERAPRM14590
PANAAALG0129L
CIN / TANMRTG00443C
Registered addressPLOT NO-01, KNOWLEDGE PARK-04, GREATER NOIDA, G.B. NAGAR UP
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITYBankBANK OF BARODABranchSECTOR GAMMA-IIA/C no.IFSCBARB0GAMNOI
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)271 (Under Registration - 1 ) → 272 (Under Registration - 2 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)270 (Under Registration - 0 ) → 271 (Under Registration - 1 )
changed in Estanzo’s record
5 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about BHS-16 MU-II

Is BHS-16 MU-II RERA registered?

Yes. BHS-16 MU-II is registered with UPRERA under registration number UPRERAPRJ9651, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has BHS-16 MU-II been completed?

UPRERA still lists BHS-16 MU-II as Registered, so it is not shown as completed here. A completion certificate dated 27 Jun 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of BHS-16 MU-II?

GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY is the promoter entity that filed BHS-16 MU-II with UPRERA (promoter RERA ID UPRERAPRM14590). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does BHS-16 MU-II have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is BHS-16 MU-II located?

BHS-16 MU-II is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in BHS-16 MU-II?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in BHS-16 MU-II?

The approved unit plan describes 350 blocks and 5,266 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is BHS-16 MU-II?

About 102 units per acre: 5,266 planned units across 51.47 acres (2,08,285 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗