Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi
Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi is a RERA-registered mixed project by U.P. Awas Evam Vikas Parishad in Jhansi (RERA ID UPRERAPRJ406852). Registered with a completion deadline of 11 Nov 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ406852 |
| Project category | Mixed |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 12 May 2020 |
| Project duration | 42 months |
| Address | Jhansi, Jhansi |
| Tehsil | Jhansi |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
2249
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
- valid to
Permit revalidated
1249/20/8/2019
Building permit sanctioned
1249/20/8/2019
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 21 Dec 2020 |
| Original completion | 11 May 2023 |
| Revised completion | 11 Nov 2023 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 21 Feb 2024 |
| Registration fee | ₹1,65,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved layout Plan .The Plot shall be Demarcated by means of T S |
| 2 | Boundary Wall Boundary wall has been constructed as per Yojna no -03 |
| 3 | Road Work As per specificatios of UP awas Ewam Vikass prishad ( Chief Enginner office Order no-685/M-4/2017 at 19-03-201 and others ). Work shall be carried out as per Utter Pradesh Public department ( UPPWD. ) SOR And Specifications . SOR 2019-2020 |
| 4 | Footpaths As per specifications of UP Awas Ewam Vikash Parishad and Inline with approved map ( Chief engineer office order no 685/M-4/2017 at 19-03 -2017 and other ) . Work shall be carried out as per Utter pradesh Public work ( UP PWD) SOR and Specification 2019-2020. |
| 5 | Water Supply Including Drinking Water Facilities Provided / shall be provided as per Norms and specifications of UP Jal Nigam . The Network consist of Trunk Water line laid in trunk road cross section with OHT And CWR in Sector to cater to the plots |
| 6 | Sewer System The under ground sewer network with Manhole with Chambers shall be provided in accordance with UP Jal Nigam specifications . and Chief Engineer order no -912/M-1/94 date 20-102005 . |
| 7 | Drain Open Channel Water drainage Network shall be provided . Drain shall be of type C1-C2 C3.......C 11 etc. The construction shall be as per UP PWD. Specification and SOR 2019-2020 . |
| 8 | Parks Parks shall be provided as shown in approved Lay-out .The construction and development shall be in accordance with Office order no 878/ISO dt-05-04-2007. |
| 9 | Tree Planting provided as per Side of Roads and parks as per approved Layout. |
| 10 | Design For Electric Supply Including Street Lighting Shall be done UPAVP and Will be Handed over to UPPCL. for issuing individual Electric Connection. |
| 11 | Community Buildings As per approved layout . |
| 12 | Treatment and Disposal System of Sewage and Sullage water Planned sewer network and STP shall be constructed . |
| 13 | Solid Waste Management And Disposal System door to door collection of solid waste will be done . and shall be disposed as per guidelines . |
| 14 | Water Conservation System Rain water harvesting in individual plots inline with the building by laws to be done by concerned allottes. |
| 15 | Energy Management System Including Use of Renewable Energy solar panels in individual plots in line with the building by laws to be done by concerning allotte |
| 16 | Fire Protection And Fire Safety System fire hydrant provided in line with fire norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services as per approved layout plots for school, facility aanganbari etc are reserved |
| 18 | Emergency Evacuation Services in line with the govt guidelines |
| 19 | Other Miscellaneous Work in accordance with registration booklet |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 19 Aug 2024. 1 of them carries a revalidation, valid to 29 Nov 2027.
Sanctioned by U.P. Awas Evam Vikas Parishad · 20,992 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 2249 | 20 Aug 2019 | 19 Aug 2024 | 19 Aug 2027 | 11 May 2023 | — | |
| 1249/20/8/2019 | 19 Aug 2024 | 19 Aug 2024 | 19 Nov 2023 | 11 May 2023 | 19 Aug 2024 valid to 29 Nov 2027 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 11 Nov 2023.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 11 May 2023 | 11 Nov 2023 | — |
Land & documents
30 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 230 | 1920 | Khasra |
| 247 | 2590 | Khasra |
| 235 | 6390 | Khasra |
| 248 | 1660 | Khasra |
| 249 | 4780 | Khasra |
| 250 | 6270 | Khasra |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 17 Dec 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 17 Dec 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 17 Dec 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 17 Dec 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 17 Dec 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 17 Dec 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 17 Dec 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 17 Dec 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 19 Nov 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 17 Dec 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 17 Dec 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 17 Dec 2020 ↗ |
Quarterly progress reports
15 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
15 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Jhansi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | UP AWAS EWAM VIKAS PARISHAD YJNA NO- JHANSIBankHDFC BANKBranchFIRST FLOOR MASIHAGANJ SIPRI BAZAR SHIVPURI ROADJHANSIA/C no.IFSCHDFC0003858 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi
Is Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi RERA registered?
Yes. Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi is registered with UPRERA under registration number UPRERAPRJ406852, registered on 21 Dec 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi been completed?
UPRERA still lists Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi as Registered, so it is not shown as completed here. A completion certificate dated 21 Feb 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi more time to complete?
UPRERA's record carries 1 completion extension for Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi, the latest running to 11 Nov 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi located?
Bhumi Vikas ewam grah sthaan Yjna no-03 jhansi Kanpur gwalior bypass near Sakhi ke hanumaan Temple Jhansi is registered in Jhansi, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗