CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP
CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Jhansi (RERA ID UPRERAPRJ978498). Registered with a completion deadline of 30 Apr 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ978498 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 May 2022 |
| Project duration | 36 months |
| Address | Jhansi, Jhansi |
| Tehsil | Jhansi |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
900
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 21 Feb 2022 |
| Original completion | 30 Apr 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 16 Oct 2025 |
| Registration fee | ₹45,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots complete |
| 2 | Boundary Wall 85 percent complete-RCC Column , beam and Brick work height -1.80m and 230mm thick wall boundary wall |
| 3 | Road Work 70 percent complete-7.50m 9.00m 12.00mm 18.00mm and 34.00 meter Road as per Layout , Sub-base -125mm to 175mm , and 250mm thick WMM . Top coat - 40mm DBM ,20mm BC |
| 4 | Footpaths as per specification of up awas ewam vikas parishad .Levelling and dressing. |
| 5 | Water Supply Including Drinking Water Facilities as per design - 100mm to 150mm dia PVC pipe .400KL Over head tank .110KL CWR. As per MOU with UP JAl Nigam -1MLD Water will be provide under Amrat Yojna . till the end of 2022 |
| 6 | Sewer System as per design 250mm , 300mm,350mm,400mm ,450mm and 500 mm dia NP-3 pipe with chamber and Manhole . disposal by 1MLD Sewer treatment Plant. |
| 7 | Drain as per design CK, C1 , C2to C10 and U Type Brick work and RCC drain . |
| 8 | Parks as per specification. Park -toe wall 230 mm thick and 900mm height brick work. and grill (second phase) and plantation |
| 9 | Tree Planting as per require in Park. and patry |
| 10 | Design For Electric Supply Including Street Lighting As per layout Electric Sub station (ESS) area has proposed 1791.17 sqm .where 2-5Mva transfer 330 substation. 5 nos -400 kva transfermer ,11 meter 8.5 meter PCC Pole and Over head line and Cable as per required will be constructed by up awas vikas parishad and will be test and handed over to uppcl. |
| 11 | Community Buildings yes PLOT Area community center 2250.00 sqm has reserved for its |
| 12 | Treatment and Disposal System of Sewage and Sullage water planned sewer line network and 1MLD STP shall be constructed. and treated water disposed to Nagar Nigam Nala |
| 13 | Solid Waste Management And Disposal System Collected door to door by Nagar Nigam Vehicle . disposed same . |
| 14 | Water Conservation System Rain water harvesting as per Government rule. |
| 15 | Energy Management System Including Use of Renewable Energy Solar panel in individual plots and houses in lie with the building by laws to be adopted. |
| 16 | Fire Protection And Fire Safety System fire hydrant provided in line with fire norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services yes |
| 18 | Emergency Evacuation Services in line with the government guidelines. |
| 19 | Other Miscellaneous Work in accordance with registration booklet. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 30 Nov 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 8,100 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 900 | 30 Nov 2021 | 30 Nov 2026 | 30 Oct 2026 | 30 Apr 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 230,235, 248,249,250 255 | 64660 | Khasra |
| 320,321., 321/1, 322/2, 323 | 58100 | Khasra |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Jan 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 24 Dec 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 24 Dec 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 24 Dec 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jan 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Jan 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Jan 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Jan 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 16 Feb 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jan 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jan 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jan 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 6 Jan 2022 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2022-Q1 to 2025-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Jhansi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UPAVP-CLN AC-108 HOUSE SFS Y-3 JHANSIBankHDFC BANK LTDBranchSIPRI BAZAR 3858Branch addressHDFC BANK LIMITED 392 FIRST FLOOR MASIHA GANJ SIPRI BAZAR SHIVPURI ROAD JHANSI UTTAR PRADESH 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UPAVP-SEP-108 HOUSE SFS Y-3 JHANSIBankHDFC LTDBranchSIPRI BAZAR 3858Branch addressHDFC BANK LTD 392 FIRST FLOOR MASHIHA GANJ SIPRI BAZAR SHIVPURI ROAD JHANSI UTTER PRADESH 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UPAVP-TRA-108-HOUSE SFS Y-3 JHANSIBankHDFC LTDBranchSIPRI BAZAR 3858Branch addressHDFC BANK 392 FIRST FLOOR MASHIHA GANJ SIPRI BAZAR SHIVPURI ROAD JHANSI 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP
Is CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP RERA registered?
Yes. CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP is registered with UPRERA under registration number UPRERAPRJ978498, registered on 21 Feb 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP been completed?
UPRERA still lists CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP as Registered, so it is not shown as completed here. A completion certificate dated 16 Oct 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP located?
CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP is registered in Jhansi, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗