CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP

UPRERARegistered

CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Jhansi (RERA ID UPRERAPRJ978498). Registered with a completion deadline of 30 Apr 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ978498
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 May 2022
Project duration36 months
AddressJhansi, Jhansi
TehsilJhansi
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    900

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Feb 2022
Original completion30 Apr 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary16 Oct 2025
Registration fee₹45,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JOYTI KATIYAAR
License CA/2005/26456
NILIGIRI COMPLEX INDRA NAGAR LUCKNOW
Engineer
SAMAR UPADHAYAY SUPERIENTENDING ENGINEER
B-1 TALPURA YOJNA JHANSI
Contractor
EXECUTIVE ENGINEER UP AWAS EWAM VIKASH PARISHAD CD BUNDELKHAND - JHANSI
EE CD BUNDELKHAND UP AWASH EWAM VIKAS PARISHAD
Sr.Development work declared to RERA
1Demarcation of Plots
complete
2Boundary Wall
85 percent complete-RCC Column , beam and Brick work height -1.80m and 230mm thick wall boundary wall
3Road Work
70 percent complete-7.50m 9.00m 12.00mm 18.00mm and 34.00 meter Road as per Layout , Sub-base -125mm to 175mm , and 250mm thick WMM . Top coat - 40mm DBM ,20mm BC
4Footpaths
as per specification of up awas ewam vikas parishad .Levelling and dressing.
5Water Supply Including Drinking Water Facilities
as per design - 100mm to 150mm dia PVC pipe .400KL Over head tank .110KL CWR. As per MOU with UP JAl Nigam -1MLD Water will be provide under Amrat Yojna . till the end of 2022
6Sewer System
as per design 250mm , 300mm,350mm,400mm ,450mm and 500 mm dia NP-3 pipe with chamber and Manhole . disposal by 1MLD Sewer treatment Plant.
7Drain
as per design CK, C1 , C2to C10 and U Type Brick work and RCC drain .
8Parks
as per specification. Park -toe wall 230 mm thick and 900mm height brick work. and grill (second phase) and plantation
9Tree Planting
as per require in Park. and patry
10Design For Electric Supply Including Street Lighting
As per layout Electric Sub station (ESS) area has proposed 1791.17 sqm .where 2-5Mva transfer 330 substation. 5 nos -400 kva transfermer ,11 meter 8.5 meter PCC Pole and Over head line and Cable as per required will be constructed by up awas vikas parishad and will be test and handed over to uppcl.
11Community Buildings
yes PLOT Area community center 2250.00 sqm has reserved for its
12Treatment and Disposal System of Sewage and Sullage water
planned sewer line network and 1MLD STP shall be constructed. and treated water disposed to Nagar Nigam Nala
13Solid Waste Management And Disposal System
Collected door to door by Nagar Nigam Vehicle . disposed same .
14Water Conservation System
Rain water harvesting as per Government rule.
15Energy Management System Including Use of Renewable Energy
Solar panel in individual plots and houses in lie with the building by laws to be adopted.
16Fire Protection And Fire Safety System
fire hydrant provided in line with fire norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
yes
18Emergency Evacuation Services
in line with the government guidelines.
19Other Miscellaneous Work
in accordance with registration booklet.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Nov 2026.

Sanctioned by U.P. Awas Evam Vikas Parishad · 8,100 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
90030 Nov 202130 Nov 202630 Oct 202630 Apr 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
230,235, 248,249,250 25564660Khasra
320,321., 321/1, 322/2, 32358100Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jan 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New24 Dec 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New24 Dec 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New24 Dec 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jan 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jan 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jan 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jan 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New16 Feb 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jan 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jan 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jan 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New6 Jan 2022 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2022-Q1 to 2025-Q1.

QuarterConstructionCertificates
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP-CLN AC-108 HOUSE SFS Y-3 JHANSIBankHDFC BANK LTDBranchSIPRI BAZAR 3858Branch addressHDFC BANK LIMITED 392 FIRST FLOOR MASIHA GANJ SIPRI BAZAR SHIVPURI ROAD JHANSI UTTAR PRADESH 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPAVP-SEP-108 HOUSE SFS Y-3 JHANSIBankHDFC LTDBranchSIPRI BAZAR 3858Branch addressHDFC BANK LTD 392 FIRST FLOOR MASHIHA GANJ SIPRI BAZAR SHIVPURI ROAD JHANSI UTTER PRADESH 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP-TRA-108-HOUSE SFS Y-3 JHANSIBankHDFC LTDBranchSIPRI BAZAR 3858Branch addressHDFC BANK 392 FIRST FLOOR MASHIHA GANJ SIPRI BAZAR SHIVPURI ROAD JHANSI 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP

Is CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP RERA registered?

Yes. CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP is registered with UPRERA under registration number UPRERAPRJ978498, registered on 21 Feb 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP been completed?

UPRERA still lists CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP as Registered, so it is not shown as completed here. A completion certificate dated 16 Oct 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP located?

CONSTRUCTION OF 108 NOS 36/75 TYPES HOUSES SELF FINNACE SCHEME AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI UP is registered in Jhansi, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗