CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI
CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Jhansi (RERA ID UPRERAPRJ473481). Registered with a completion deadline of 31 Oct 2024.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ473481 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Oct 2022 |
| Project duration | 25 months |
| Address | Jhansi, Jhansi |
| Tehsil | Jhansi |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
2 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 30 Sept 2022 |
| Original completion | 31 Oct 2024 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 9 Nov 2024 |
| Registration fee | ₹1,09,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots complete |
| 2 | Boundary Wall 90 complete .RCC boundary wall 1.80m height .and 230mm thick brick work . |
| 3 | Road Work 70 percentage complete road 6.00m 7.5 m 9 .00m 12.00m.18m and 34 meter as per layout. specified GSB ,WMM , and Top coat DGBM BC as per design approved by concerned Chief engineer up avp. |
| 4 | Footpaths as per specification upavp |
| 5 | Water Supply Including Drinking Water Facilities 150mm and 100 mm UPVC pipe branch 400kl OHT and 110 kl cwr and other approved and as per design approved by upavp. |
| 6 | Sewer System 250mm , 300mm 450mm and 500 mm dia NP-2 pipe /NP-3 pipe as per approved design . |
| 7 | Drain type ck c and u as per approved design. brick work and RCC drain and culvert ae required. |
| 8 | Parks 15.92 percent of all project area .as per approved layout .toe wall by .90 m brick work and 0.45 meter Mild steel grill and plants as required. |
| 9 | Tree Planting as per required different types plants . |
| 10 | Design For Electric Supply Including Street Lighting as per approved design . sub station.MS pole and LT line as desing Site required .230/1100 kva electrical substaion . SDO office and transfermers required . |
| 11 | Community Buildings as per layout area 1790.00 sqm to be arrange. |
| 12 | Treatment and Disposal System of Sewage and Sullage water PLANNED SEWER NETWORK AND 1 MLD STP SHALL BE CONSTRUCTION. sewer line with 250mm 300mm 350mm 400mm and 500mm dia NP-2 RCC hume pipe and chamber and Menhole 1200x900mm and as required..1MLD Wet-land process sewerage treatment plant .after treated water disposal to Nala of nagar nigam jhansi. |
| 13 | Solid Waste Management And Disposal System as per required by planned as upavp specification. Disposal of kunda home collection / kunda ghar .to disposed by nagar nigam helps. |
| 14 | Water Conservation System Rain water harvesting for water conservation system will be adopted as per buildings bylaws . |
| 15 | Energy Management System Including Use of Renewable Energy SOLAR PANEL IN INDIVIDUAL PLOTS AND HOUSES IN LIE WITH THE BUILDING BY LAWS TO BE ADOPTED. |
| 16 | Fire Protection And Fire Safety System FIRE HYDRANT PROVIDED IN LINE WITH FIRE NORMS |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services YES . |
| 18 | Emergency Evacuation Services AS ACCORDANCE WITH RESISTRATION BOOKLET. |
| 19 | Other Miscellaneous Work BOUNADRY WALL GATE ETC. all development work and infrastructure should be adopted as per specification building by laws as well as upavp guide lines. |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 29 Jul 2025.
Sanctioned by U.P. Awas Evam Vikas Parishad · 20,873 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 664/Y-3/100 | 30 Jul 2021 | 29 Jul 2025 | 30 Jul 2025 | 31 Oct 2024 | |
| 664/Y-3/100 | 30 Jul 2021 | 29 Jul 2025 | 30 Jul 2025 | 31 Oct 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 235 | 6390 | Khasra |
| 249 | 3970 | Khasra |
| 250 | 5460 | Khasra |
| 255 | 15280 | Khasra |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Allotment letter from the authority · 16-4-2008 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Sept 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 13 Sept 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 13 Sept 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 13 Sept 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 25 Sept 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 13 Sept 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 25 Sept 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 25 Sept 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 13 Sept 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 25 Sept 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Sept 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 25 Sept 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 25 Sept 2022 ↗ |
Quarterly progress reports
9 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
9 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2024-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Jhansi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UPAVP BHUMI VIKAS GRAHSTHAN YOJ NO.03 RESIDENTION 90 NOS AND PREMIUM 46 NOS COLLECTION A/CBankHDFC BANKBranchHDFC BANK Ltd.392, first floor (above parking ), Masiha ganj, sipri Bazar , jhansi UPBranch addressHDFC BANK Ltd , 392, first floor ( above parking ), Masiha ganj sipri bazar jhansi UPBranch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UPAVP BHUMI VIKAS EWAM GRAHSTHAN YOJ NO-03 RESIDENTIAL 90NOS AND PREMIUM HOUSES 46 NOS SEPATE A/CBankHDFC BANK LTDBranchHDFC BANK LIMITEDBranch addressHDFC BANK Ltd, 392 , first floor , masiha ganj sipri Bazar , sipri Road , jhansi utter pradeshBranch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UPAVP BHUMI VIKAS EWAM GRAHSTHAN YOJ NO-03 RESITENTIAL 90 NO AND PREMIUM HOUSE 46 NOS TRANSACTION A/CBankHDFC BANK LIMITED 5/19 VISHAL KHAND GOMTI NAGAR LUCHNOWBranchHDFC BANK LIMITED 5/19 VISHAL KHAND GOMTI NAGAR LUCKNOWBranch addressHDFC BANK LIMITED 5/19 VISHAL KHAND GOMTI NAGAR LUCHNIWBranch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0003858 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI
Is CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI RERA registered?
Yes. CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI is registered with UPRERA under registration number UPRERAPRJ473481, registered on 30 Sept 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI been completed?
UPRERA still lists CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI as Registered, so it is not shown as completed here. A completion certificate dated 9 Nov 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI located?
CONSTRUCTION OF 90 NOS RESIDENCIAL AND 46 NOS PREMIUM HOUSING PLOTS AT BHUMI VIKAS EWAM GRAHSTHAAN YOJNA NO-03 JHANSI is registered in Jhansi, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗